Featured partner
Recommended for Guildford

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Guildford

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Transport planning and infrastructure consultancy with its main office on North Street…
Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
A flood risk assessment shows how flooding could affect a site and how a scheme stays safe without increasing risk elsewhere; a drainage strategy shows how surface water will be managed. In Guildford, the local planning authority is Guildford Borough Council, and Surrey County Council is the Lead Local Flood Authority for surface water. The River Wey runs through the town centre: on 24–25 December 2013 it flooded 139 properties, with Walnut Tree Close evacuated by boat. Policy P4 of the 2019 Local Plan requires a site-specific FRA in medium and high flood risk areas, and the council asks for one for all sites in Flood Zones 2 and 3. Policy P11 asks greenfield sites to match greenfield run-off.
Local planning authority: Guildford Borough Council

Flood risk in Guildford is concentrated along the River Wey and the Wey Navigation, which pass through the town centre. In winter 2013/14 the worst-hit streets included Friary Street, the High Street, Mary Road, William Road and Walnut Tree Close, and the Tillingbourne rose quickly at Shalford. The Environment Agency, the borough and Surrey County Council are appraising a Guildford flood alleviation scheme, but it is not yet funded. Away from the river, chalk to the south and London Clay to the north give very different infiltration conditions, and groundwater can reach the surface in the valley. About 30% of the borough sits on principal aquifers with 14 Source Protection Zones, which affects soakaway design.
Guildford Borough Council applies Policy P4 of the Local Plan: Strategy and Sites (2019): development in medium or high flood risk areas, including developed flood zone 3b, needs the sequential and exception tests where required and a site-specific FRA showing safe access and no increased risk elsewhere; undeveloped flood zone 3b is safeguarded. Every scheme must show no increase in surface water run-off and prioritise SuDS. Policy P11 of the Development Management Policies (2023) sets run-off standards, requires LLFA guidance to be followed and needs 1 metre between infiltration features and groundwater. The council requires an FRA for all sites in Flood Zones 2 and 3, and in Zone 1 where there are drainage problems, surface water risk, sites over 1 hectare or more vulnerable uses. Surrey County Council, as LLFA, comments on major schemes.
Local plan: Guildford Borough Local Plan: Strategy and Sites (2019) and Development Management Policies (2023) (Adopted. A new-style Guildford Local Plan is being prepared (timetable published 5 June 2026; planned adoption 30 April 2029) and will replace both parts.)
P1: Surrey Hills Area of Outstanding Natural Beauty and Area of Great Landscape Value
Conserves and enhances the AONB, presumes against major development there, and protects its setting; the AGLV is kept until the AONB boundary review ends.
D1: Place shaping
Overarching design and place-making policy (not specific to surveys).
D13: The Corridor of The River Wey & Godalming Navigations
Development affecting the Navigations must conserve their character, setting, ecology and heritage and integrate flood mitigation sensitively.
D12: Light Impacts and Dark Skies
Lighting schemes need a Light Impact Assessment covering wildlife; light spill into habitats and buffers must be avoided; extra protection in darker parts of the Surrey Hills.
D20: Conservation Areas
Development in conservation areas must preserve or enhance their character (title verified; detailed wording not re-read for this pack).
ID4: Green and blue infrastructure
Protects SPAs/SACs, SSSIs, SNCIs and Local Nature Reserves; seeks biodiversity gains, especially in Biodiversity Opportunity Areas; protects watercourse corridors.
P10: Water Quality, Waterbodies and Riparian Corridors
No deterioration of waterbodies; an undeveloped buffer of at least 10m from the top of bank on both sides of a main river, with a Landscape and Ecological Management Plan; no new culverting.
P11: Sustainable Surface Water Management
Greenfield run-off rates for greenfield sites; as close as practicable on brownfield; maximise permeable surfaces; follow the SuDS hierarchy and Surrey LLFA guidance; infiltration needs 1m clearance above groundwater.
P2: Green Belt
Inappropriate development in the Metropolitan Green Belt is refused unless very special circumstances exist; defines how extensions and replacement buildings are judged.
P4: Flooding, flood risk and groundwater protection zones
Development in medium/high flood risk areas needs a site-specific FRA, sequential/exception tests and safe access; undeveloped flood zone 3b is safeguarded; all schemes must show no increase in run-off and prioritise SuDS; protects Source Protection Zones.
P5: Thames Basin Heaths Special Protection Area
No net new homes within 400m of the SPA; new homes within 400m–5km must provide SANG and SAMM; schemes of 50+ homes at 5–7km assessed case by case.
P6: Protecting Important Habitats and Species
Protects irreplaceable and priority habitats and species; where ancient woodland is in or next to a site, a BS5837 survey locating ancient/veteran trees and a buffer of at least 15m are required.
P7: Biodiversity in New Developments
The adopted policy text sought at least 20% biodiversity net gain using the national metric, with gains secured for 30+ years, maximum on-site gain and features for wildlife on buildings. Following the National Planning Policy Framework published on 17 August 2026 the statutory 10% minimum applies except where a higher figure is justified on a specific site allocation.
General guidance for flood risk and drainage assessment, not formal advice for your site.
For every project in Flood Zone 2 or 3 (including 3b). In Zone 1, it is needed where there are critical drainage problems or surface water flooding, the site exceeds 1 hectare, or the use becomes more vulnerable.
Surrey County Council, the Lead Local Flood Authority, is a statutory consultee on surface water for all major developments. Since 6 October 2025 it has assessed them against the June 2025 national SuDS standards.
Major schemes (10+ homes or 1,000 m² non-residential) must show how SuDS will be built and maintained and submit the council's Surface Water Drainage form.
Possibly, but Policy P11 requires at least 1 metre between the base of an infiltration system and the maximum likely groundwater level, and a hydrogeological risk assessment in Source Protection Zone 1 for anything other than clean roof water.
One is being appraised by the Environment Agency, Guildford Borough Council and Surrey County Council. It is expected to take at least 2–3 years and can only be built once funding is secured.