Flood risk and drainage assessments in Nags Head for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Islington rules explained

Recommended For Nags Head

  1. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  2. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  3. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

Get your free quote from JMS Engineers

Tell JMS Engineers about your site in Nags Head. It's free, and there's no obligation. Your request is for JMS Engineers only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Flood risk in Nags Head is shaped by Nags Head Town Centre and Holloway Road, together with surface-water drainage on and around the site. A flood risk assessment should use the current Environment Agency mapping and the council's strategic flood risk assessment, and should not borrow a neighbouring town's catchment story. London Borough of Islington is the local planning authority and the Lead Local Flood Authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Drainage proposals should show how surface water will be managed on site. Confirm the current validation requirements with the council before submitting.

Local planning authority: London Borough of Islington

The Odeon cinema on Holloway Road at Nags Head, a cream art deco corner building with the Odeon name on the tower
Photo: David Anstiss, CC BY-SA 2.0

In Nags Head

Nags Head is the northern major centre in the borough, around Nags Head Town Centre and Holloway Road, with St Mary Magdalene Conservation Area on Holloway Road. That Holloway junction setting is not Upper Street, Islington Town Hall or Regent's Canal at Angel. Flood-risk and drainage work should be written for this centre, starting from Nags Head Town Centre and Holloway Road.

Local character
Nags Head Town Centre — Nags Head Town Centre is the official major centre at the junction of Holloway Road, Seven Sisters Road and Tollington Road, also known as Holloway.
Holloway Road — Holloway Road is the A1 commercial spine running through Nags Head Major Centre, distinct from Upper Street at Angel.
Conservation areas
St Mary Magdalene Conservation Area — St Mary Magdalene Conservation Area covers the church and adjoining historic townscape on Holloway Road, close to Nags Head Town Centre.
Local authority and policy

In Nags Head, including around Nags Head Town Centre and Holloway Road, the London Borough of Islington assesses flood risk and drainage under Policies S8 and S9 of the Islington Local Plan, adopted on 28 September 2023, read with London Plan Policies SI12 and SI13. The borough is entirely in Flood Zone 1. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Islington Local Plan: Strategic and Development Management Policies (The Islington Local Plan was adopted on 28 September 2023 and is the adopted local plan. Previous Core Strategy and Development Management policies are withdrawn. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • G4: Biodiversity, landscape design and trees

    Policy G4 of the Islington Local Plan, adopted on 28 September 2023, requires all developments to protect, enhance and contribute to the landscape, biodiversity value and growing conditions of the site and surrounding area, including connectivity between habitats. Development should protect Sites of Importance for Nature Conservation. Proposals involving new buildings, redevelopment or large extensions must submit a Landscape Design Strategy which maximises green infrastructure, biodiversity and sustainable drainage, and must aim to secure a net gain in biodiversity value with a clear priority for on-site measures. The policy does not set a percentage above the statutory 10 per cent minimum. All developments, including refurbishment, must carry out ecological surveys and assessments wherever the proposal is likely to affect protected species, habitats or priority species, or is within or close to a SINC. Developments must minimise impacts on existing trees, hedges and other significant vegetation, protect trees during development, and follow a replacement hierarchy where loss is demonstrably unavoidable. Permission or consent for the removal of protected trees will normally be refused.

  • S8: Flood Risk Management

    Policy S8 requires a site-specific flood risk assessment for proposals on sites of 1 hectare or greater; new development proposing more than 100 square metres increase in floorspace in a critical drainage area; changes of use to a more vulnerable class; Highly Vulnerable development in an area of high or medium surface water flood risk; and More Vulnerable development in an area of high surface water flood risk. The assessment must consider all sources of flooding, with particular focus on surface water, and must investigate groundwater flooding where that risk is identified. Islington is located entirely in Flood Zone 1, so fluvial flood risk is low, but surface water, groundwater, sewers and artificial sources remain relevant. Policy S9 requires integrated water management and sustainable drainage.

  • S9: Integrated Water Management and Sustainable Drainage

    Policy S9 requires development to incorporate integrated water management and sustainable drainage, following the drainage hierarchy and contributing to a reduction in flood risk where required. It should be read with Policy S8, which sets when a site-specific flood risk assessment is needed and how residual risk, including in critical drainage areas and areas of high surface water flood risk, is to be managed.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Nags Head

Who is the local planning authority for a flood risk assessment in Nags Head?

London Borough of Islington. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a flood risk assessment likely in Nags Head?

When a planning application in Nags Head could affect trees, habitats, heritage, flood risk or existing buildings around Nags Head Town Centre and Holloway Road. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Nags Head alongside the London Borough of Islington local plan.