Featured partner
Recommended for Wandsworth

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Wandsworth

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil and structural engineering practice with a London office in Lambeth.
Civil and structural engineering consultancy whose London office is in Sutton town centre.
Transport planning and infrastructure consultancy with its main office on North Street…
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
The River Thames, the River Wandle and the Wandle Delta are a frequent reason for a flood risk assessment in Wandsworth Town Centre. Tidal, fluvial and surface water flooding all need to be considered, together with climate change. The local planning authority, and the Lead Local Flood Authority, is the London Borough of Wandsworth. Policy LP12 of the Wandsworth Local Plan, adopted on 19 July 2023, requires all planning applications to demonstrate that proposals avoid or reduce contributing to all sources of flooding, take account of climate change, and would not increase flood risk elsewhere. Policy SI12 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Wandsworth

Wandsworth Town Centre sits at the mouth of the River Wandle, where the Wandle Delta meets the River Thames. Beverley Brook is a further main watercourse in the west of the borough. Policy LP12 requires a Flood Emergency Plan in Flood Zones 2 and 3 for 10 or more dwellings, 1,000 square metres or more of non-residential development, or where safe access cannot be achieved. A flood risk assessment should be coordinated with a topographical survey of levels and flood defences, and with any ecological work along the river corridors.
The London Borough of Wandsworth assesses flood risk and drainage under Policy LP12 of the Wandsworth Local Plan, adopted on 19 July 2023, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. The Local Plan Partial Review adopted on 4 March 2026 did not change Policy LP12. The Local Validation Checklist of July 2026 requires a flood risk assessment for applications in a flood risk area. Confirm the current local validation requirements with the council before submitting.
Local plan: Wandsworth Local Plan 2023–2038 (adopted 19 July 2023), Wandsworth Local Plan Partial Review (adopted 4 March 2026) and The London Plan 2021 (published 2 March 2021) (The Wandsworth Local Plan 2023–2038 was adopted on 19 July 2023. The Local Plan Partial Review, adopted on 4 March 2026, replaces only Policies LP23, LP24, LP28, LP29, LP30 and LP31 (housing and affordable housing). All other 2023 policies, including those on trees, biodiversity and flood risk, remain in force. The London Plan 2021, published on 2 March 2021, also forms part of the development plan. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Wandsworth is the local planning authority and the Lead Local Flood Authority.)
LP56: Tree Management and Landscaping
Requires the retention and protection of existing trees and landscape features, including veteran trees, and resists loss of trees of townscape or amenity value except in limited circumstances. Trees must be protected during development in accordance with BS5837, with appropriate on-site replacement or a CAVAT contribution where a tree is felled.
LP55: Biodiversity
Requires development to protect and enhance biodiversity, including designated sites, priority species and habitats, and to deliver a net gain in biodiversity through ecological enhancements. The supporting text identifies the River Thames, the River Wandle, Beverley Brook and railway land as protected biodiversity areas, and records bats, stag beetles and other protected species in the borough.
LP12: Water and Flooding
Requires all planning applications to demonstrate that proposals avoid or reduce contributing to all sources of flooding, take account of climate change, and would not increase flood risk elsewhere. Development is guided to areas of lower risk by the Sequential Test, and a Flood Emergency Plan is required in Flood Zones 2 and 3 on sites of 10 or more dwellings or 1,000 square metres of non-residential development, or where safe access cannot be achieved.
General guidance for flood risk and drainage assessment, not formal advice for your site.
The London Borough of Wandsworth. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.
The Local Validation Checklist of July 2026 requires one for applications in a flood risk area. Policy LP12 also applies a sequential approach and asks for a Flood Emergency Plan on larger or higher-risk sites in Flood Zones 2 and 3. The town centre sits at the Wandle Delta, next to the River Thames.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 deal with flood risk and sustainable drainage alongside Policy LP12.