Featured partner
Recommended for Woking

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Woking

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…
Transport planning and infrastructure consultancy based at Lion House, Oriental Road in…
Transport planning and infrastructure consultancy with its main office on North Street…
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Serious flooding from the River Wey at Byfleet on 25–26 December 2013, and flooding along the Hoe Stream around Blackhorse Road, are the local starting point for a flood risk assessment in Woking. The assessment and drainage strategy should show how a site will be kept safe and will not make flooding worse elsewhere. The local planning authority is Woking Borough Council. Policy CS9 of the Core Strategy expects development to be in Flood Zone 1 and requires a comprehensive flood risk assessment for proposals in Flood Zones 3a and 3b. Surrey County Council's Section 19 investigation of winter 2013/14 recorded about 40 incidents of internal property flooding in the borough. Surface water and sewer flooding are also recognised sources in the policy.
Local planning authority: Woking Borough Council

Woking's flood risk comes from several directions. The River Wey skirts the east of the borough and flooded properties in Byfleet on 25 and 26 December 2013, described in the Section 19 report as the worst flooding there since 2000; Old Woking and Maybury were also investigated. The Hoe Stream, a Wey tributary, runs through the southern suburbs: the 2013/14 event on the Hoe Stream was estimated as a 1 in 5 to 1 in 15 annual chance event, and Blackhorse Road was closed. Horsell and Sutton Green and Worplesdon were further sub-areas in the same investigation. Along Blackhorse Road the ground is largely Bagshot Formation sand, with a noted potential for groundwater flooding at the surface. Surrey County Council is the Lead Local Flood Authority for surface water and ordinary watercourses; the Environment Agency is responsible for main rivers.
Woking Borough Council applies Core Strategy Policy CS9 (Flooding and water management). The policy expects development to be located in Flood Zone 1. Applications in Flood Zone 2 are considered only if it is shown there is no suitable alternative at lower risk. The council will not encourage development in Flood Zones 3a and 3b, and proposals there must be accompanied by a comprehensive flood risk assessment demonstrating that the development will not increase flood risk elsewhere. Where flood or compensation proposals could affect biodiversity, designated sites are considered carefully, and permission will not be granted if a proposal would adversely affect an SPA, SAC or Ramsar site. Applicants should also meet national tests for sequential and, where relevant, exception assessment, and should confirm current drainage validation requirements with the council and with Surrey County Council as Lead Local Flood Authority.
Local plan: Woking Core Strategy (2012), Development Management Policies DPD (2016) and Site Allocations Plan (2021) (Adopted. The Core Strategy was adopted on 25 October 2012 and reviewed in 2018 and on 12 October 2023. The Development Management Policies DPD was adopted on 20 October 2016 and reviewed in October 2021. The Site Allocations Plan was adopted on 14 October 2021.)
CS6: Green Belt
Protects the Metropolitan Green Belt around Woking's urban area and sets the tests for inappropriate development.
CS7: Biodiversity and nature conservation
Protects internationally, nationally and locally designated sites, including the Thames Basin Heaths SPA and the Thursley, Ash, Pirbright and Chobham SAC, and requires development to contribute to biodiversity.
CS8: Thames Basin Heaths Special Protection Areas
Gives priority protection to the SPA. No net new residential development is permitted within 400 m. Development between 400 m and 5 km must contribute to SANG and SAMM. Three component sites in or partly in the borough are Horsell Common, Sheets Heath (Brookwood) and Brookwood Heath.
CS9: Flooding and water management
Expects development in Flood Zone 1. Flood Zone 2 is considered only if there is no suitable alternative at lower risk. Development in Flood Zones 3a and 3b requires a comprehensive flood risk assessment and must not increase flood risk elsewhere. Permission is refused where proposals would adversely affect an SPA, SAC or Ramsar site.
CS21: Design
Requires proposals to incorporate landscaping, including the retention of trees of amenity value and other features.
DM2: Trees and landscaping
Supports removal of TPO or conservation-area trees only in exceptional circumstances with over-riding planning benefits and replacement planting. Requires retained trees to be protected during construction and given adequate space, and new landscape schemes to enhance character and connect to green infrastructure.
DM4: Development in the vicinity of Basingstoke Canal
Sets additional design and amenity tests for development near the Basingstoke Canal, which is also identified as a green and blue infrastructure asset.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Woking Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
Policy CS9 requires a comprehensive flood risk assessment for development in Flood Zones 3a and 3b. National policy also requires assessments in Flood Zone 2, on larger sites in Flood Zone 1, and where other sources of flooding are present. Confirm the current validation requirements with the council.
The Section 19 report into winter 2013/14 investigates Blackhorse Road, Byfleet, Byfleet (south) and Wisley, Old Woking and Maybury, Horsell, and Sutton Green and Worplesdon. Byfleet flooded from the River Wey; the Hoe Stream affected southern Woking, including Blackhorse Road.
Surrey County Council, until 1 April 2027 when that role passes, with planning powers, to the new West Surrey unitary council. The Environment Agency remains responsible for main rivers including the River Wey.
No other published town guides for this survey in the council area yet.