Preliminary ecological appraisals in Caterham for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Tandridge District Council rules explained

Recommended For Caterham

  1. The Ecology Partnership

    Independent ecology consultancy with its head office in Leatherhead, Surrey.

  2. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  3. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

  4. Darwin Ecology

    Independent ecological consultancy with a Surrey office near Farnham, plus offices in…

At a glance

The Caterham Bourne corridor and the wooded hillsides in Caterham Valley are typical reasons a preliminary ecological appraisal should look beyond the red line. The appraisal is a first look at habitats and species, and at the further surveys a planning application may need. The local planning authority is Tandridge District Council. Policy DP19 of the Detailed Policies, adopted on 24 July 2014, and Policy CSP17 of the Core Strategy, adopted on 15 October 2008, protect designated sites, Priority habitats and species, and expect effects to be assessed.

Local planning authority: Tandridge District Council

The Square in Caterham Valley, Surrey, with the wooded hillside behind the town centre
Photo: Peter Whatley, CC BY-SA 2.0

In Caterham

The Caterham Bourne, wooded hillsides, gardens around Queens Park Road, Park Road and Banstead Road, and the Metropolitan Green Belt are the main habitat setting. Buildings, trees and the piped watercourse can support bats, reptiles, amphibians and nesting birds. A PEA should identify which further surveys are actually needed.

Rivers
Caterham Bourne — An ephemeral, seasonal tributary of the River Wandle. The 2015 Section 19 report places Caterham in its upper catchment, with groundwater risk particularly along Stafford Road and localised surface water flooding. The 2016 report describes the Bourne valley to the east of Caterham on the Hill, with much of the Hill catchment piped north into Croydon.
Flood zones
Queens Park Road — Identified in the 2016 Section 19 report as one of four highway wetspots in the Caterham on the Hill catchment. A nursing home on Queens Park Road was flooded on 7 June 2016.
Banstead Road — Identified as a highway wetspot in the 2016 Section 19 report. The area to the north of Banstead Road is described as having a very high susceptibility to groundwater flooding.
Ninehams Road — Identified as a highway wetspot, with Stites Hill Road, in the 2016 Section 19 report. Surrey County Council Highways made an emergency closure of Ninehams Road during the 7 June 2016 flood.
Park Road — The 2015 Section 19 report records a Tandridge officer attending a flooded property in Park Road after the winter 2013/14 floods, and letters to residents about the Repair and Renew Grant. The 2016 report notes previous internal flooding in Park Road and Court Road, and later parking restrictions in Park Road to allow contractors to work on affected properties.
Landmarks
Money Pit — A Surrey County Council structure on the piped watercourse adjacent to St Michaels Road, identified in the 2016 Section 19 report. At the time of that report the structure was being further investigated and cleaned by the County Council.
Local character
wooded hillsides — Policy CSP18 of the Core Strategy protects wooded hillsides in the built-up areas, including those in Caterham Valley, by requiring new development not to adversely affect their character and not to result in an overall loss of tree cover.
Green Belt
Metropolitan Green Belt — Wraps much of Caterham outside the built-up area, separating the town from neighbouring settlements and the North Downs countryside.
Local authority and policy

Tandridge District Council assesses effects on habitats and species under Policy DP19 of the Detailed Policies, adopted on 24 July 2014, and Policy CSP17 of the Core Strategy, adopted on 15 October 2008. A PEA is the usual way to show whether further protected-species or habitat surveys are needed, and it sits alongside any biodiversity net gain assessment. Confirm the current local validation requirements with the council before submitting.

Local plan: Tandridge District Core Strategy (adopted 15 October 2008) and Local Plan Part 2: Detailed Policies (adopted 24 July 2014) (The Core Strategy was adopted on 15 October 2008 and the Detailed Policies on 24 July 2014. These remain the adopted development plan as of 13 November 2026. The Caterham, Chaldon and Whyteleafe Neighbourhood Plan was made on 18 June 2026. A new Tandridge District Local Plan 2027-2042 is at Regulation 19 stage (publication October 2026) and is not adopted. Under local government reorganisation, plan-making passes to the new East Surrey unitary council on 1 April 2027.)

  • DP19: Biodiversity, Geological Conservation & Green Infrastructure

    Supports proposals that protect, enhance or increase green infrastructure and restore or create Priority Habitats. Proposals that would cause significant harm to designated sites or the wider GI network will be refused unless reasonable alternatives are unsuitable and harm is avoided, mitigated or, as a last resort, compensated. Harm to irreplaceable assets such as SSSIs, ancient woodland or veteran trees will only be permitted in wholly exceptional circumstances, and overall ecological benefits should be delivered. Development affecting protected or Priority species is only permitted where the species will not be harmed or appropriate mitigation is put in place. The policy does not set a biodiversity net gain percentage.

  • CSP17: Biodiversity

    Requires development proposals to protect biodiversity and provide for the maintenance, enhancement, restoration and, if possible, expansion of biodiversity, by aiming to restore or create suitable semi-natural habitats and ecological networks in accordance with the aims of the Surrey Biodiversity Action Plan. It does not set a net gain percentage. The reasoned justification notes there are no European sites in Tandridge, but Ashdown Forest and the Mole Gap to Reigate Escarpment lie nearby.

  • DP21: Sustainable Water Management

    Supports restoring natural flows and functional floodplain. Proposals should reduce the cause and impact of flooding, including through green infrastructure for flood storage and SuDS, with runoff restricted to the pre-development rate and maintenance considered. Development in Flood Zones 2 and 3, on sites of 1 hectare or more in Zone 1, or on sites at medium or high risk from other sources of flooding identified in the SFRA, is only permitted where the sequential and, where appropriate, exception tests are passed, a site-specific flood risk assessment shows risk is reduced or at least risk-neutral, and flood-resilient and resistant design is included.

  • DP7: General Policy for New Development

    Requires landscaping to be an integral part of layout design, with new planting and the retention of important trees, hedgerows and walls wherever possible. Clause 13 requires a landscaping scheme where trees are present, retaining trees that are important by virtue of their significance in the local landscape (including size, form, maturity, rarity or unusual character) and younger trees with future landscape value, and allowing space above and below ground for trees to grow to maturity. Where trees are felled before permission is sought, replacement planting may be required.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Caterham

Who is the local planning authority for a preliminary ecological appraisal in Caterham?

Tandridge District Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.

When is a PEA needed in Caterham?

Where a site contains or is next to habitats, watercourses, buildings or trees that could support protected or Priority species, including the Caterham Bourne corridor or the wooded hillsides. Confirm the current list with the council.

Is a PEA the same as a biodiversity net gain assessment?

No. A PEA identifies habitats, species and further survey needs. A net gain assessment uses the statutory metric to show at least 10 per cent gain. Many applications need both.