Preliminary ecological appraisals in Chertsey for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Runnymede Borough Council rules explained

Recommended For Chertsey

  1. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  2. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

  3. The Ecology Partnership

    Independent ecology consultancy with its head office in Leatherhead, Surrey.

  4. Darwin Ecology

    Independent ecological consultancy with a Surrey office near Farnham, plus offices in…

Get your free quote from ACD Environmental

Tell ACD Environmental about your site in Chertsey. It's free, and there's no obligation. Your request is for ACD Environmental only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A preliminary ecological appraisal in Chertsey should start with the River Thames, Chertsey Meads and the Chertsey Conservation Area, together with the Metropolitan Green Belt edge towards Addlestone and Thorpe. The local planning authority is Runnymede Borough Council. Policy EE9 of the Runnymede 2030 Local Plan, adopted on 16 July 2020, applies a hierarchy of sites and species, and Policy EE12 protects and enhances rivers and other waterbodies. The appraisal should identify whether further species surveys or a biodiversity net gain metric are needed.

Local planning authority: Runnymede Borough Council

The stone arches of Chertsey Bridge crossing the River Thames, with lamp posts along the parapet and trees on the riverbank
Photo: Amanda Slater, CC BY-SA 4.0

In Chertsey

The River Thames and Chertsey Meads form the main wildlife corridor at the edge of the town. The Chertsey Conservation Area contains historic fabric and trees around Guildford Street, London Street, Windsor Street and the abbey remains. The appraisal should identify whether further species surveys or a biodiversity net gain metric are needed.

Conservation areas
Chertsey Conservation Area — Runnymede Borough Council designates the Chertsey Conservation Area, first designated in October 1969, extended in 1987 and reviewed in 2019-2020. It centres on Guildford Street, London Street and Windsor Street, with St Peter's Church and the remains of Chertsey Abbey.
Rivers
River Thames — Chertsey sits on the River Thames, with riverside land including Chertsey Bridge and Chertsey Meads. Policy EE13 of the Runnymede 2030 Local Plan guides development to the lowest flood risk from all sources through the sequential test, and Policy EE12 protects and enhances rivers and other waterbodies.
Landmarks
Chertsey Meads — Chertsey Meads is the riverside meadow on the Thames east of the town, forming part of the borough's blue and green infrastructure on the floodplain.
Green Belt
Metropolitan Green Belt — Metropolitan Green Belt wraps Chertsey, including land towards Thorpe, Lyne, Addlestone and the M25.
Local authority and policy

Runnymede Borough Council assesses effects on habitats and species under Policy EE9 of the Runnymede 2030 Local Plan, adopted on 16 July 2020, together with Policy EE12 on blue infrastructure. Confirm the current validation requirements with the council before submitting.

Local plan: Runnymede 2030 Local Plan (Adopted on 16 July 2020 and still in force. The council adopted a timetable for a new Local Plan on 25 February 2026, with issues and options scoping consultation from 7 September to 12 October 2026; the new plan had not been adopted as of 13 November 2026.)

  • EE10: Thames Basin Heaths Special Protection Area

    No additional residential development within 400 m of the SPA. Non-residential development within 400 m may require Appropriate Assessment. All additional residential development beyond 400 m but within 5 km must provide adequate avoidance measures, generally SANG and SAMM.

  • EE12: Blue Infrastructure

    Protects and enhances rivers and other waterbodies, including buffers, deculverting and fish passage, and requires SuDS designs to take account of wildlife.

  • EE1: Townscape and Landscape Quality

    Requires development to respect and enhance townscape and landscape quality, including the setting of the River Thames and historic landscapes around Egham.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Chertsey

Who is the local planning authority for a preliminary ecological appraisal in Chertsey?

Runnymede Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.

When is a preliminary ecological appraisal likely in Chertsey?

Policy EE9 and Policy EE12 apply where habitats, protected species or waterbodies could be affected. A PEA is the usual first step. Confirm the current validation requirements with the council.

Should a Chertsey PEA cover both the River Thames and Chertsey Meads?

Yes, where the site could affect either corridor, or the Chertsey Conservation Area. A PEA should record the habitats actually present and any further surveys required.