Preliminary ecological appraisals in Godalming for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Waverley Borough Council rules explained

Recommended For Godalming

  1. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

  2. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  3. Simlaw Ecology

    Ecology consultancy based in Cranleigh that specialises in bat surveys, with habitat…

  4. SWT Ecology Services

    Ecological consultancy owned by Surrey Wildlife Trust, based at the Trust's offices in…

At a glance

Sites on the Godalming Hillsides may support woodland, bats and nesting birds, while plots on or next to the Lammas Lands, Hell Ditch or the River Wey can hold wetland and riparian species. The River Ock corridor along the railway is another linear habitat that a preliminary ecological appraisal in Godalming should flag before design work goes too far. The local planning authority is Waverley Borough Council. Policy NE1 of Local Plan Part 1, adopted on 20 February 2018, requires features of biodiversity interest to be retained, protected and enhanced, and adverse impacts to be avoided or mitigated. A PEA is the first look at those habitats and at the further surveys a planning application may need.

Local planning authority: Waverley Borough Council

Godalming High Street in Surrey, with the town clock and the wooded hillside beyond
Photo: Colin Smith, CC BY-SA 2.0

In Godalming

Godalming's urban area is tightly held by wooded hillsides and a river flood plain, so ecology issues appear on small as well as large sites. The Godalming Hillsides encircle the town centre and continue into Farncombe. On the valley floor the Lammas Lands, Hell Ditch and the River Wey form a connected wetland. The River Ock joins the Wey from the south-west. South of the town the Surrey Hills National Landscape begins. A PEA in this town should therefore look beyond the red line to the hillside woodland, the flood-plain meadows and the river corridors that species use to move through the settlement.

Rivers
River Wey — Main river running through the centre of Godalming. Surrey County Council's Section 19 report (29 October 2015) records that levels rose through 24 December 2013 and peaked in the early hours of Christmas Day, with a large number of properties internally flooded and a return period estimated at a 1 in 15 to 20 annual chance.
Hell Ditch — Watercourse in the Godalming flood plain, named with the River Wey in the Section 19 fluvial flood maps. The Lammas Lands lie between Hell Ditch and the River Wey.
River Ock — Tributary joining the Wey from the south-west, following the railway line. The Section 19 report notes a flood risk to the A3100 and Station Approach.
Flood zones
Catteshall Road — With Meadrow, the first area affected when the Wey peaked on 25 December 2013. The Section 19 report records a temporary road closure and the evacuation of vulnerable residents from Wey Court, Meadrow and Catteshall Road. Catteshall Lane is also identified as a surface water flow route.
Meadrow — Area first affected with Catteshall Road on 25 December 2013. Vulnerable residents were evacuated from Wey Court, Meadrow and Catteshall Road. A surface water flow route from The Circle to Wey Court is also recorded.
Other
Lammas Lands — Flood plain between Hell Ditch and the River Wey. After the 2013/14 floods the borough council carried out vegetation cutting, tree management and restoration of a drainage channel and pond here.
Woodland
Godalming Hillsides — Local landscape designation retained by Local Plan Part 1 Policy RE3 section v, with boundaries reviewed in Local Plan Part 2 (including the former Frith Hill area). Development is not acceptable unless it would not diminish the wooded appearance of the hillside or result in a loss of tree cover to the detriment of the area and the character and setting of the town.
Nearby villages
Farncombe — Adjoining settlement north-east of Godalming town centre, covered by the Godalming and Farncombe Neighbourhood Plan (made August 2019). Wey Court, off the A3100 in Farncombe, lies on the edge of the Hell Ditch and River Wey flood plain.
National Landscapes (AONB)
Surrey Hills — National Landscape (AONB) beginning south of the town, to which great weight is given in landscape decisions under the local plan's landscape policies.
Green Belt
Metropolitan Green Belt — Covers much of the land outside Godalming's built-up area.
Local authority and policy

Waverley Borough Council assesses effects on habitats and species under Policy NE1 of Local Plan Part 1 (adopted 20 February 2018) and under Policy DM1 of Local Plan Part 2 (adopted 21 March 2023). A completed biodiversity checklist is a local validation requirement for each planning application; if the checklist identifies a likely impact, a biodiversity statement or other suitable report must be submitted, and targeted surveys such as bat surveys must be carried out by a suitably qualified person at an appropriate time of year. Policy NE1 also requires a project-level habitats regulations assessment for net new residential development within 400 m of the Wealden Heaths SPAs; that test is more often relevant in the west of the borough than in Godalming town centre, but it should still be checked for sites toward Elstead and Thursley. Confirm the current checklist with the council before submitting.

Local plan: Waverley Borough Local Plan Part 1: Strategic Policies and Sites (2018) and Local Plan Part 2: Site Allocations and Development Management Policies (2023) (Adopted. Local Plan Part 1 was adopted on 20 February 2018. Local Plan Part 2 was adopted on 21 March 2023. Both remain the statutory development plan until replaced.)

  • DM1: Environmental Implications of Development

    Requires development to avoid significant harm to amenity, including an increase in flood risk, and to avoid harm to existing environmental assets. It requires the mitigation hierarchy to be followed and a minimum biodiversity net gain of 10 per cent as required by the Environment Act 2021, calculated with the current national Biodiversity Metric.

  • DM18: Farnham/Aldershot Strategic Gap

    Provides the detailed policy for the strategically important land separating Farnham from Aldershot, following Local Plan Part 1 Policy RE3 section iii, to prevent coalescence and to support landscape and wildlife enhancement in the gap.

  • CC4: Flood Risk Management

    Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and is not increased elsewhere, and residual risks are safely managed. In locations at risk of flooding, permission depends on passing sequential and, where needed, exception tests, a sequential approach to locating development, and not constraining the natural function of the flood plain. SuDS are required on major developments. A site-specific flood risk assessment is required for sites within or adjacent to areas at risk of surface water flooding identified in the SFRA, with no increase in the volume or rate of runoff leaving the site.

  • GOD12: Godalming and Farncombe Skyline

    A policy of the Godalming and Farncombe Neighbourhood Plan, made in August 2019, which adds a skyline test on the Godalming Hillsides in addition to Local Plan Part 1 Policy RE3.

  • FNP11: Preventing coalescence of settlements

    A policy of the Farnham Neighbourhood Plan (made 28 July 2017 and updated when the plan was made again in April 2020) which seeks to prevent the coalescence of settlements within the neighbourhood plan area. Local Plan Part 2 states that Policy DM18 should be used in conjunction with Local Plan Part 1 Policy RE3 section iii and with FNP11.

  • NE3: Thames Basin Heaths Special Protection Area

    No net new residential development is permitted within 400 m of the Thames Basin Heaths SPA. Between 400 m and 5 km, new residential development that is likely to have a significant adverse effect must provide SANG or a bespoke solution, and a SAMM contribution, agreed with Natural England. Large-scale development of 50 dwellings or more between 5 km and 7 km is assessed individually.

  • DM11: Trees, Woodland, Hedgerows and Landscaping

    Requires development to retain woodland, important trees, groups of trees and hedgerows; protect them during all phases of development; provide adequate separation for long-term retention and growth; use suitable, preferably native, planting; and incorporate a high-quality landscape scheme with long-term management. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, will not be permitted unless there are wholly exceptional reasons and a suitable compensation strategy.

  • NE1: Biodiversity and Geological Conservation

    Seeks to conserve and enhance biodiversity. Development is permitted where it retains, protects and enhances features of biodiversity and geological interest and avoids, or if unavoidable mitigates, adverse impacts. Particular regard is had to SPAs, SACs and Ramsar sites, SSSIs, and local sites including ancient woodland. Net new residential development within 400 m of Thursley, Hankley and Frensham Commons (Wealden Heaths Phase I) SPA and Wealden Heaths Phase II SPA requires a project-level Habitats Regulations Assessment.

  • RE3: Landscape Character

    Protects the landscape character of the borough, including the Surrey Hills National Landscape (formerly the Surrey Hills AONB). Development should conserve or enhance landscape character, and proposals that would harm the Surrey Hills or its setting will be resisted.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Godalming

Who is the local planning authority for a preliminary ecological appraisal in Godalming?

Waverley Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.

When is a PEA likely to be needed in Godalming?

Where a site has existing habitats, is on or next to the Godalming Hillsides, the Lammas Lands, Hell Ditch, the River Wey or the River Ock, or the biodiversity checklist identifies a likely impact. Policy NE1 requires effects on biodiversity to be considered.

Is a PEA the same as a biodiversity net gain assessment?

No. A PEA identifies habitats and the need for further species surveys. A net gain assessment measures habitat units with the statutory metric under Policy DM1. Many Godalming applications need both.