Topographical surveys in Godalming for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Waverley Borough Council rules explained

Recommended For Godalming

  1. GEOTEC Surveys

    Underground mapping and land surveying company with its registered office in Wormley and…

  2. Cadmap

    Land and building surveying company with offices in Surrey (Dunsfold Park), London,…

  3. Technics Group

    Surveying and construction consultancy with its head office at Merrow Business Park in…

  4. Vertex Surveys

    Land surveying company based in Shere, in Guildford borough.

At a glance

Flood-plain storage along the River Wey, Hell Ditch and the River Ock, and the wooded appearance of the Godalming Hillsides, both depend on accurate levels, so a topographical survey is the base drawing for many Godalming planning applications. The survey is a measured plan of a site, its buildings and visible features. The local planning authority is Waverley Borough Council. Flood-risk assessments under Policy CC4 depend on ground levels, and Policy RE3 tests the effect of a proposal on the wooded hillside. In the Metropolitan Green Belt, a clear survey also helps to show the effect of a proposal on openness.

Local planning authority: Waverley Borough Council

Godalming High Street in Surrey, with the town clock and the wooded hillside beyond
Photo: Colin Smith, CC BY-SA 2.0

In Godalming

Godalming occupies a distinct valley. The River Wey, Hell Ditch and the Lammas Lands occupy the floor, with recorded flooding at Catteshall Road, Meadrow and Wey Court in Farncombe in December 2013. The River Ock joins from the south-west along the railway, with a noted flood risk to the A3100 and Station Approach. Above the centre, the Godalming Hillsides rise as wooded slopes whose skyline is also protected by the neighbourhood plan. South of the town the Surrey Hills begin, and much of the remaining land is Metropolitan Green Belt. Small changes in level therefore matter both for flood storage and for the appearance of the hillside.

Rivers
River Wey — Main river running through the centre of Godalming. Surrey County Council's Section 19 report (29 October 2015) records that levels rose through 24 December 2013 and peaked in the early hours of Christmas Day, with a large number of properties internally flooded and a return period estimated at a 1 in 15 to 20 annual chance.
Hell Ditch — Watercourse in the Godalming flood plain, named with the River Wey in the Section 19 fluvial flood maps. The Lammas Lands lie between Hell Ditch and the River Wey.
River Ock — Tributary joining the Wey from the south-west, following the railway line. The Section 19 report notes a flood risk to the A3100 and Station Approach.
Flood zones
Catteshall Road — With Meadrow, the first area affected when the Wey peaked on 25 December 2013. The Section 19 report records a temporary road closure and the evacuation of vulnerable residents from Wey Court, Meadrow and Catteshall Road. Catteshall Lane is also identified as a surface water flow route.
Meadrow — Area first affected with Catteshall Road on 25 December 2013. Vulnerable residents were evacuated from Wey Court, Meadrow and Catteshall Road. A surface water flow route from The Circle to Wey Court is also recorded.
Other
Lammas Lands — Flood plain between Hell Ditch and the River Wey. After the 2013/14 floods the borough council carried out vegetation cutting, tree management and restoration of a drainage channel and pond here.
Woodland
Godalming Hillsides — Local landscape designation retained by Local Plan Part 1 Policy RE3 section v, with boundaries reviewed in Local Plan Part 2 (including the former Frith Hill area). Development is not acceptable unless it would not diminish the wooded appearance of the hillside or result in a loss of tree cover to the detriment of the area and the character and setting of the town.
Nearby villages
Farncombe — Adjoining settlement north-east of Godalming town centre, covered by the Godalming and Farncombe Neighbourhood Plan (made August 2019). Wey Court, off the A3100 in Farncombe, lies on the edge of the Hell Ditch and River Wey flood plain.
National Landscapes (AONB)
Surrey Hills — National Landscape (AONB) beginning south of the town, to which great weight is given in landscape decisions under the local plan's landscape policies.
Green Belt
Metropolitan Green Belt — Covers much of the land outside Godalming's built-up area.
Local authority and policy

Waverley Borough Council does not have a single named topographical survey policy, but measured plans and levels are part of showing compliance with Policy CC4 on flooding, Policy RE3 and DM11 on the Godalming Hillsides and trees, and Green Belt policy. Applicants should provide plans that meet the national and local validation requirements for location and block plans, and should include sufficient level information where flood risk, hillside woodland or Green Belt openness is in issue. Confirm the current validation checklist with Waverley Borough Council before submitting.

Local plan: Waverley Borough Local Plan Part 1: Strategic Policies and Sites (2018) and Local Plan Part 2: Site Allocations and Development Management Policies (2023) (Adopted. Local Plan Part 1 was adopted on 20 February 2018. Local Plan Part 2 was adopted on 21 March 2023. Both remain the statutory development plan until replaced.)

  • DM1: Environmental Implications of Development

    Requires development to avoid significant harm to amenity, including an increase in flood risk, and to avoid harm to existing environmental assets. It requires the mitigation hierarchy to be followed and a minimum biodiversity net gain of 10 per cent as required by the Environment Act 2021, calculated with the current national Biodiversity Metric.

  • DM18: Farnham/Aldershot Strategic Gap

    Provides the detailed policy for the strategically important land separating Farnham from Aldershot, following Local Plan Part 1 Policy RE3 section iii, to prevent coalescence and to support landscape and wildlife enhancement in the gap.

  • CC4: Flood Risk Management

    Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and is not increased elsewhere, and residual risks are safely managed. In locations at risk of flooding, permission depends on passing sequential and, where needed, exception tests, a sequential approach to locating development, and not constraining the natural function of the flood plain. SuDS are required on major developments. A site-specific flood risk assessment is required for sites within or adjacent to areas at risk of surface water flooding identified in the SFRA, with no increase in the volume or rate of runoff leaving the site.

  • GOD12: Godalming and Farncombe Skyline

    A policy of the Godalming and Farncombe Neighbourhood Plan, made in August 2019, which adds a skyline test on the Godalming Hillsides in addition to Local Plan Part 1 Policy RE3.

  • FNP11: Preventing coalescence of settlements

    A policy of the Farnham Neighbourhood Plan (made 28 July 2017 and updated when the plan was made again in April 2020) which seeks to prevent the coalescence of settlements within the neighbourhood plan area. Local Plan Part 2 states that Policy DM18 should be used in conjunction with Local Plan Part 1 Policy RE3 section iii and with FNP11.

  • NE3: Thames Basin Heaths Special Protection Area

    No net new residential development is permitted within 400 m of the Thames Basin Heaths SPA. Between 400 m and 5 km, new residential development that is likely to have a significant adverse effect must provide SANG or a bespoke solution, and a SAMM contribution, agreed with Natural England. Large-scale development of 50 dwellings or more between 5 km and 7 km is assessed individually.

  • DM11: Trees, Woodland, Hedgerows and Landscaping

    Requires development to retain woodland, important trees, groups of trees and hedgerows; protect them during all phases of development; provide adequate separation for long-term retention and growth; use suitable, preferably native, planting; and incorporate a high-quality landscape scheme with long-term management. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, will not be permitted unless there are wholly exceptional reasons and a suitable compensation strategy.

  • NE1: Biodiversity and Geological Conservation

    Seeks to conserve and enhance biodiversity. Development is permitted where it retains, protects and enhances features of biodiversity and geological interest and avoids, or if unavoidable mitigates, adverse impacts. Particular regard is had to SPAs, SACs and Ramsar sites, SSSIs, and local sites including ancient woodland. Net new residential development within 400 m of Thursley, Hankley and Frensham Commons (Wealden Heaths Phase I) SPA and Wealden Heaths Phase II SPA requires a project-level Habitats Regulations Assessment.

  • RE3: Landscape Character

    Protects the landscape character of the borough, including the Surrey Hills National Landscape (formerly the Surrey Hills AONB). Development should conserve or enhance landscape character, and proposals that would harm the Surrey Hills or its setting will be resisted.

What you’ll usually need

General guidance for topographical survey, not formal advice for your site.

Timing and seasons
Not seasonal; dense summer vegetation can slow fieldwork.
Standards
RICS Measured surveys of land, buildings and utilities

Questions about topographical surveys in Godalming

Who is the local planning authority for a topographical survey in Godalming?

Waverley Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.

When is a topographical survey useful for a Godalming application?

Whenever levels, watercourses or existing buildings affect the design, especially near the River Wey, Hell Ditch, the River Ock, the Lammas Lands, or on the Godalming Hillsides, and in the Metropolitan Green Belt. It is also the usual base for a flood risk assessment under Policy CC4.

Does Waverley Borough Council have a specific topographical survey policy?

No single policy is named for it. The survey supports other tests in the local plan, including CC4 (flooding) and RE3 (Godalming Hillsides). Use the current local validation requirements for plan standards.