Preliminary ecological appraisals in Lowestoft for planning applications

  • 2 checked firms
  • Free quotes, no obligation
  • East Suffolk Council rules explained

Recommended For Lowestoft

  1. Anglian Ecology

    Ecological consultancy whose own site publishes an office at 1 Red House Farm Cottages,…

At a glance

A preliminary ecological appraisal in Lowestoft is often needed where work could affect the North Lowestoft Conservation Area, or the Lake Lothing. East Suffolk Council is the local planning authority. Policy WLP8.34 requires development to maintain, restore or enhance green infrastructure and biodiversity, and to be accompanied by sufficient ecological information. East Suffolk Council applies the statutory 10 per cent biodiversity net gain minimum. It is Suffolk's north-eastern coastal town around the official North Lowestoft Conservation Area and Lake Lothing, quite unlike Beccles, Felixstowe or Woodbridge. The adopted East Suffolk Council Waveney Local Plan applies here. Confirm the current validation requirements with the council before submitting.

Local planning authority: East Suffolk Council

An aerial view of Lowestoft seafront, Claremont Pier and the beach
Photo: John Fielding, CC BY 2.0

In Lowestoft

Lowestoft is in the area of East Suffolk Council. It is Suffolk's north-eastern coastal town around the official North Lowestoft Conservation Area and Lake Lothing, quite unlike Beccles, Felixstowe or Woodbridge. The adopted East Suffolk Council Waveney Local Plan applies here. The North Lowestoft Conservation Area and the Lake Lothing are the official features that shape preliminary ecological appraisal work here. Suffolk County Council is the Lead Local Flood Authority. There is no confirmed successor council for East Suffolk.

Conservation areas
North Lowestoft Conservation Area — The official North Lowestoft Conservation Area, as named on East Suffolk Council's official conservation area appraisals page.
South Lowestoft Kirkley Conservation Area — The official South Lowestoft Kirkley Conservation Area, as named on East Suffolk Council's official conservation area appraisals page.
Landmarks
Lake Lothing — Lake Lothing, the official tidal water dividing Lowestoft north and south, as named throughout the adopted East Suffolk Council Waveney Local Plan.
Local authority and policy

In Lowestoft, including around the North Lowestoft Conservation Area and at the Lake Lothing, the same adopted local plan policies apply. East Suffolk Council assesses ecology under Policy WLP8.34 of the East Suffolk Council Waveney Local Plan. Policy WLP8.34 (Biodiversity and Geodiversity) of the East Suffolk Council Waveney Local Plan, adopted on 20 March 2019, supports development where it can be demonstrated that it maintains, restores or enhances the existing green infrastructure network and positively contributes towards biodiversity through the creation of new green infrastructure and improvement to linkages between habitats, having regard to the Waveney Green Infrastructure Strategy (2015). Development proposals should be accompanied by sufficient information to assess the effects of development on protected sites, species, biodiversity or geology, together with any proposed prevention, mitigation or compensation measures. The policy does not set a higher than statutory biodiversity net gain percentage. East Suffolk Council applies the statutory 10 per cent minimum. Confirm the current validation requirements with the council before submitting.

Local plan: East Suffolk Council Suffolk Coastal Local Plan and East Suffolk Council Waveney Local Plan (adopted)

  • SCLP10.1: Biodiversity and Geodiversity

    Policy SCLP10.1 (Biodiversity and Geodiversity) of the East Suffolk Council Suffolk Coastal Local Plan, adopted on 23 September 2020, requires development to maintain, restore or enhance biodiversity and geodiversity and to provide a biodiversity net gain that is proportionate to the scale and nature of the proposal. Development resulting in the loss or deterioration of irreplaceable habitats, including ancient woodland and veteran trees, will not be permitted unless there are wholly exceptional reasons and a suitable compensation strategy exists. The policy does not set a higher than statutory biodiversity net gain percentage. East Suffolk Council applies the statutory 10 per cent minimum.

  • SCLP9.5: Flood Risk

    Policy SCLP9.5 (Flood Risk) of the East Suffolk Council Suffolk Coastal Local Plan, adopted on 23 September 2020, provides that the Strategic Flood Risk Assessment should be the starting point in assessing whether a proposal is at risk from flooding. Proposals for new development, or the intensification of existing development, will not be permitted in areas at high risk from flooding, namely Flood Zones 2 and 3, unless the applicant has satisfied the safety requirements in national planning practice guidance, including the sequential test, where needed the exception test, and a site-specific flood risk assessment that addresses the characteristics of flooding and an appropriate range of flood event scenarios, taking climate change into account. Developments should be safe, resilient and should not increase flood risk elsewhere, and are encouraged to include natural flood management measures.

  • WLP8.34: Biodiversity and Geodiversity

    Policy WLP8.34 (Biodiversity and Geodiversity) of the East Suffolk Council Waveney Local Plan, adopted on 20 March 2019, supports development where it can be demonstrated that it maintains, restores or enhances the existing green infrastructure network and positively contributes towards biodiversity through the creation of new green infrastructure and improvement to linkages between habitats, having regard to the Waveney Green Infrastructure Strategy (2015). Development proposals should be accompanied by sufficient information to assess the effects of development on protected sites, species, biodiversity or geology, together with any proposed prevention, mitigation or compensation measures. The policy does not set a higher than statutory biodiversity net gain percentage. East Suffolk Council applies the statutory 10 per cent minimum.

  • WLP8.24: Flood Risk

    Policy WLP8.24 (Flood Risk) of the East Suffolk Council Waveney Local Plan, adopted on 20 March 2019, requires development proposals to consider flooding from all sources and take into account climate change. Proposals at risk of flooding should only be granted planning permission if it can be demonstrated that there are no available sites suitable for the proposed use in areas with a lower probability of flooding, that the development provides sustainability benefits which outweigh flood risk, and that a site-specific flood risk assessment demonstrates that the flood risk can be satisfactorily mitigated over the lifetime of the development. New residential development on sites not allocated in the Local Plan or a Neighbourhood Plan will not be permitted on sites at risk from flooding. Developments should use sustainable drainage systems to drain surface water.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Lowestoft

Who is the local planning authority for a preliminary ecological appraisal in Lowestoft?

East Suffolk Council. Suffolk County Council is the Lead Local Flood Authority. There is no confirmed successor council for East Suffolk.

When is a preliminary ecological appraisal likely in Lowestoft?

A preliminary ecological appraisal in Lowestoft is often needed where development could affect habitats or species in the North Lowestoft Conservation Area or at the Lake Lothing. Confirm the current validation requirements with the council.

Why do official features matter for ecology work in Lowestoft?

The North Lowestoft Conservation Area and the Lake Lothing are official features that can support habitats and protected species, so an appraisal is often used to identify constraints before a planning application is drawn up. Confirm the current validation requirements with the council.