Featured partner
Recommended for Wembley

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Wembley

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
London-based ecological consultancy in Muswell Hill.
Environmental and ecology consultancy with a London office at Holyrood Street, near…
London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Sites next to the River Brent, Brent Reservoir or Wembley Stadium parkland are typical reasons a preliminary ecological appraisal in Wembley should look beyond the red line. For applications the local planning authority is the London Borough of Brent. Policy BGI1 of the Local Plan 2019-2041, adopted on 24 February 2022, requires development to achieve a net gain in biodiversity and to avoid detrimental impact on geodiversity. A PEA is the usual first-look survey of habitats and of the further work a planning application may need.
Local planning authority: London Borough of Brent

Barn Hill Open Space, Tokyngton Recreation Ground, Chalkhill Open Space and the Grand Union Canal can support bats, wetland birds, reptiles and riparian species around Wembley Town Centre and Wembley Park. A PEA should sit alongside any biodiversity net gain assessment.
The London Borough of Brent assesses effects on habitats and species under Policy BGI1 of the Local Plan 2019-2041, adopted on 24 February 2022, together with London Plan Policy G6, published on 2 March 2021. A PEA is the usual way to show whether further protected-species or habitat surveys are needed. Confirm the current local validation requirements with the council before submitting.
Local plan: Brent Local Plan 2019-2041 (adopted 24 February 2022) and The London Plan 2021 (published 2 March 2021) (The Brent Local Plan 2019-2041 was adopted by Full Council on 24 February 2022 and remains the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Brent is the local planning authority and the Lead Local Flood Authority.)
G7: Trees and woodlands
Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.
SI 12: Flood risk management
Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.
BGI1: Green and Blue Infrastructure in Brent
Requires development to achieve a net gain in biodiversity and avoid any detrimental impact on the geodiversity of an area, and to place emphasis on solutions that support biodiversity when meeting the urban greening factor. It also seeks additional public open space, including in Wembley Central ward, and requires development on or near the Capital Ring to protect its character and, where appropriate, contribute to its improvement. The policy does not set a biodiversity net gain percentage.
BGI2: Trees and Woodlands
Requires development with existing trees on or adjoining the site that could be affected to submit a BS5837 or equivalent tree survey. Major development should make provision for the planting and retention of trees on site; where retention is agreed not to be possible, new trees should achieve equivalent canopy cover or a financial contribution should be made for off-site planting of equivalent canopy cover. Minor development that results in the loss of trees should provide appropriate replacements on site. Works to trees should accord with BS3998 or equivalent, and retained or proposed trees should accord with BS5837 recommendations.
BSUI3: Managing Flood Risk
Requires proposals that need a flood risk assessment to demonstrate that the development will be resistant and resilient to all relevant sources of flooding including surface water, to pass the sequential and exception tests as required by national policy, to minimise flood risk on site and not increase it elsewhere, and not to create new basement dwellings in areas of high flood risk. Proposals that fail to make appropriate provision for flood risk mitigation, or which would increase the risk or consequences of flooding, will be refused. Opportunities will be sought from redevelopment in functional floodplain (Flood Zone 3b) to restore natural function and storage capacity.
G6: Biodiversity and access to nature
London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.
General guidance for preliminary ecological appraisal (pea), not formal advice for your site.
London Borough of Brent. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
Where a site is on or next to the River Brent, Brent Reservoir, Barn Hill Open Space, Tokyngton Recreation Ground or the Grand Union Canal, or where parkland around Wembley Stadium may be affected. Confirm the current requirements with the council.
No. A PEA identifies habitats and the need for further surveys. Qualifying applications also need a statutory biodiversity net gain assessment. The two pieces of work should be coordinated.
No other published town guides for this survey in the council area yet.