Preliminary ecological appraisals in Barnet for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Barnet rules explained

Recommended For Barnet

  1. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  2. Tim Moya Associates

    Arboricultural and ecological consultancy trading as Tim Moya Associates from 2 The…

  3. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

At a glance

Even modest High Street and backland sites in the Chipping Barnet Conservation Area can support bats, nesting birds and garden habitat, especially around Barnet Church and toward the grassland and trees of Hadley Green. The London Borough of Barnet protects Sites of Importance for Nature Conservation and priority habitats and species, and expects development to protect existing site ecology. A preliminary ecological appraisal is the usual first survey to identify habitats, the likelihood of protected species, and whether further surveys are needed before an application is submitted. It also helps show how landscaping can deliver the biodiversity benefits sought under Policies ECC07 and CDH07. Surface water flood risk and drainage features should be noted at this stage so that any later habitat design works with the site.

Local planning authority: London Borough of Barnet

The flint and stone tower of St John the Baptist Church, also known as Barnet Church, in Chipping Barnet
Photo: John Salmon, CC BY-SA 2.0

In Barnet

A preliminary ecological appraisal is often warranted for sites in the Chipping Barnet Conservation Area, near Barnet Church or toward Hadley Green, where buildings, trees and gardens may support protected or priority species. Surface water flood risk and any drainage features should be recorded in the walkover.

Conservation areas
Chipping Barnet Conservation Area
Landmarks
Barnet Church
Green Belt
Hadley Green
Flood zones
surface water flood risk
Local authority and policy

The London Borough of Barnet assesses ecology under Policy ECC07 of the Barnet Local Plan 2021–2036, adopted on 4 March 2025, read with Policy CDH07 on landscaping. Confirm the current local validation requirements with the council before submitting.

Local plan: Barnet Local Plan 2021–2036 (The Barnet Local Plan 2021–2036 was adopted on 4 March 2025 and is the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • CDH07: Amenity Space and Landscaping

    Policy CDH07 of the Barnet Local Plan 2021–2036, adopted on 4 March 2025, requires development to provide adequate amenity space and, where hard or soft landscaping is included, to design it sympathetically to local character. Soft landscaping should provide biodiversity benefits such as habitat creation using native species, and an appropriate level of new and existing wildlife habitat including tree and shrub planting, in accordance with Policy ECC07. Existing trees of value should be retained wherever possible. Retained trees must have their stems, canopy and root systems safeguarded. Where trees are removed they should be replaced with trees of equal value and of suitable sizes and species. Where replacement on site to the value removed is not possible, a contribution to the council for any residual value may be made to provide trees in nearby streets and open spaces, secured by a planning obligation. Provision is also to be made for sustainable drainage in accordance with Policy ECC03.

  • ECC07: Biodiversity

    Policy ECC07 requires the retention and enhancement, or the creation, of biodiversity in development proposals. It protects Sites of Special Scientific Interest, Sites of Importance for Nature Conservation, and priority habitats and species. Development is expected to make the fullest contribution to enhancing biodiversity and to protect existing site ecology, including Biodiversity Net Gain in accordance with national policy and legislation. The Environment Act 2021 requires at least 10 per cent biodiversity net gain. The policy does not set a percentage above that national minimum. Where significant harm cannot be avoided, it must be adequately mitigated or, as a last resort, compensated for; otherwise applications will be refused. Developers are also expected to take a holistic approach to biodiversity net gain, the urban greening factor and sustainable drainage.

  • ECC03: Water Management

    Policy ECC03 requires development to be located in areas at lowest risk of flooding from any source, assessed through the sequential test at application stage, and to ensure flood risk is not increased elsewhere. A site-specific flood risk assessment is required for sites of 1 hectare or more in Flood Zone 1, for sites in Flood Zones 2 or 3, for relevant non-householder applications within specified climate-change flood extents, within an identified Critical Drainage Area, and where a site may be subject to another source of flooding and a more vulnerable use would be introduced. Surface water should be managed as close to its source as possible, aiming for greenfield run-off rates and following the London Plan drainage hierarchy, with management and maintenance plans for SuDS. Development beside a river corridor is expected to provide a buffer zone of at least 10 metres.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Barnet

Who is the local planning authority for a preliminary ecological appraisal in Barnet?

The London Borough of Barnet. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a preliminary ecological appraisal needed in Barnet?

It is the usual first survey where a site could affect habitats or protected species, including gardens and trees in the Chipping Barnet Conservation Area and land toward Hadley Green. Confirm the current local validation requirements with the council before submitting.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G6 is the London Plan policy most often read alongside a preliminary ecological appraisal.