Preliminary ecological appraisals in Weybridge for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Elmbridge Borough Council rules explained

Recommended For Weybridge

  1. The Ecology Partnership

    Independent ecology consultancy with its head office in Leatherhead, Surrey.

  2. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  3. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

  4. Darwin Ecology

    Independent ecological consultancy with a Surrey office near Farnham, plus offices in…

Get your free quote from Thomson Environmental Consultants

Tell Thomson Environmental Consultants about your site in Weybridge. It's free, and there's no obligation. Your request is for Thomson Environmental Consultants only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Riverside plots beside the River Wey or the River Thames, and land next to Brooklands Community Park, are the usual reasons a preliminary ecological appraisal in Weybridge has to look past the application boundary. Elmbridge Borough Council is the local planning authority. The first-look survey should identify habitats, likely species and any further work a planning application will need, under Policy DM21 of the Development Management Plan and Policy CS15 of the Core Strategy, adopted in 2015 and 2011 respectively. Bats, reptiles or wetland species on those corridors should be flagged before a layout is fixed.

Local planning authority: Elmbridge Borough Council

Weybridge Town Lock on the River Wey in Surrey
Photo: Peter S, CC BY-SA 2.0

In Weybridge

Weybridge's main habitat features are the River Wey and River Thames corridors, Brooklands Community Park, and the Metropolitan Green Belt on the edge of the town. Policy CS13 may also apply where a residential site falls inside the 5 km zone around the Thames Basin Heaths SPA; applicants should check current mapping. Buildings, trees and river banks can support bats, reptiles, amphibians and nesting birds.

Rivers
River Wey — Joins the Thames at Weybridge. The Section 19 report records levels rising on 25 December 2013 and peaking on 26 December, lower than the 1968 event. Property flooding began on the afternoon of 25 December, with three properties in the vicinity of Wey Road worst affected. The 2013/14 event is estimated as a 1 in 20 to 1 in 30 annual chance event on the River Wey at Weybridge. In February 2014 the Thames rose higher and backed up the Wey.
River Thames — Forms the northern edge of Weybridge at the confluence with the Wey. The Section 19 report records February 2014 levels as the highest since 1947, causing backing up in the River Wey. In the Weybridge and Walton-on-Thames sub-area, 33 properties were affected by one river or both. The Environment Agency issued flood warnings to 363 registered Weybridge owners in December 2013 and 383 in February 2014.
Flood zones
Wey Road — The Section 19 report records that property flooding began on the afternoon of 25 December 2013, with three properties in the vicinity of Wey Road worst affected.
Walton Lane — Temporarily closed by Surrey County Council during the winter 2013/14 floods. Elmbridge Borough Council later set up a Walton Lane flood forum.
Jessamy Road — Temporarily closed by Surrey County Council during the winter 2013/14 floods.
Landmarks
Brooklands Community Park — Policy CS4 protects and improves Brooklands Community Park so that it can fulfil its role as Suitable Accessible Natural Greenspace, as part of mitigation for the Thames Basin Heaths SPA.
Special Protection Areas
Thames Basin Heaths SPA — European site protected by Policy CS13. New residential development likely to have a significant effect must provide agreed avoidance or mitigation, including a 5 km zone of influence and a 400 m exclusion zone. Brooklands Community Park is an identified SANG. Applicants should check current mapping for a specific Weybridge site rather than assume the town centre is inside the zone.
Green Belt
Metropolitan Green Belt — Wraps much of Weybridge outside the built-up area, including land around Oatlands, St George's Hill and Brooklands.
Local authority and policy

Elmbridge Borough Council assesses effects on habitats and species under Policy DM21 of the Development Management Plan, adopted on 15 April 2015, and Policy CS15 of the Core Strategy, adopted on 20 July 2011, including Policy CS13 where a proposal could affect the Thames Basin Heaths SPA. A PEA is the usual way to show whether further protected-species or habitat surveys are needed, and it sits alongside any biodiversity net gain assessment. Confirm the current local validation requirements with the council before submitting.

Local plan: Elmbridge Core Strategy (adopted 20 July 2011) and Development Management Plan (adopted 15 April 2015) (The Core Strategy was adopted on 20 July 2011 and the Development Management Plan on 15 April 2015. These remain the adopted development plan as of 13 November 2026. A previous draft Local Plan was withdrawn from examination in 2025 after the inspector indicated it would be found unsound. A new Local Plan is at scoping consultation (4 November to 9 December 2026), with adoption scheduled for 16 August 2029; it is not adopted. The Core Strategy plan period runs to July 2026, but the adopted policies remain in force until replaced. Under local government reorganisation, plan-making passes to the new East Surrey unitary council on 1 April 2027.)

  • CS15: Biodiversity

    Seeks to avoid loss and contribute to a net gain in biodiversity. The policy protects designated sites, including those relevant to the Thames Basin Heaths SPA and the South West London Waterbodies SPA, protects woodland including ancient woodland, and protects priority habitats and species. Clause 8 requires that new development does not result in a net loss of biodiversity and, where feasible, contributes to a net gain through the incorporation of biodiversity features. It does not set a percentage. National sites named in the reasoned justification include Esher Common SSSI.

  • DM21: Nature conservation and biodiversity

    Expects all new development to preserve, manage and where possible enhance existing habitats, protected species and biodiversity features, in accordance with Core Strategy Policy CS15. Support is given to proposals that incorporate new biodiversity features. Development affecting internationally designated sites is considered against Policies CS13 and CS15 and relevant legislation. Development affecting nationally designated sites will not be permitted if it would have an adverse effect, except in exceptional circumstances where the benefits clearly outweigh the harm, with avoidance, mitigation and compensation sought. Significant harm to locally designated sites or to priority habitats and species will not be permitted. Potential SANG sites identified on the Policies Map are protected from development that would compromise that function. The presumption in favour of sustainable development does not apply to development affecting international sites.

  • DM6: Landscape and trees

    Requires development to include an integral scheme of landscape, tree retention, protection and/or planting that reflects or enhances the existing landscape, contributes to biodiversity, and does not result in the loss of or damage to significant trees and hedgerows unless, in exceptional circumstances, the benefits would outweigh the loss. Existing trees, including their root systems, must be adequately protected before, during and after construction. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, is not accepted unless, in exceptional circumstances, the benefits would outweigh the loss. The policy also covers works to trees protected by a Tree Preservation Order.

  • CS26: Flooding

    Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and risk is not increased elsewhere, with residual risks safely managed. Permission is only granted where a sequential test shows the site is in the lowest appropriate flood risk zone in accordance with national policy and the Elmbridge Strategic Flood Risk Assessment, and where development would not constrain the natural function of the flood plain. Development in Flood Zones 2 or 3 requires flood resistance and resilience measures. New development must include SuDS; all development in Flood Zones 2 and 3 must control surface water runoff at greenfield rates as near to source as possible. The policy covers both fluvial and surface water flooding and takes account of climate change. Reasoned justification records comprehensive flood defence and alleviation works along the River Mole after the 1968 floods, and residual risk behind Lower Mole defences.

  • CS13: Thames Basin Heaths Special Protection Area

    Requires new residential development likely to have a significant effect on the Thames Basin Heaths SPA to demonstrate adequate avoidance or mitigation, agreed with Natural England. A 5 km zone of influence applies, with a 400 m exclusion zone where mitigation is unlikely to protect the integrity of the SPA. Outside the exclusion zone but within 5 km, mitigation is required prior to occupation and in perpetuity, based on access management and Suitable Accessible Natural Greenspace. Applicants should check current mapping for a specific site rather than assume a town centre falls inside the zone.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Weybridge

Who is the local planning authority for a preliminary ecological appraisal in Weybridge?

Elmbridge Borough Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.

When is a PEA needed in Weybridge?

Where a site contains or is next to habitats, watercourses, buildings or trees that could support protected or priority species, or designated sites under Policies DM21 and CS15, including the River Wey, the River Thames or Brooklands Community Park. Confirm the current list with the council.

Is a PEA the same as a biodiversity net gain assessment?

No. A PEA identifies habitats, species and further survey needs. A net gain assessment uses the statutory metric to show at least 10 per cent gain. Many applications need both.