Tree surveys in Weybridge for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Elmbridge Borough Council rules explained

Recommended For Weybridge

  1. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  2. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

  3. Holt Arboriculture

    Farnham-based tree consultancy led by Alex Needs, a Chartered Arboriculturist and…

  4. Tamla Trees

    Independent arboricultural consultancy based near Fleet, led by Keiron Hart, who is…

At a glance

Trees along the River Wey, the River Thames and around Brooklands Community Park often sit in both a landscape and a flood-plain setting, so a tree survey for a Weybridge planning application should record trees on and next to the site, usually to BS5837, with that riverside context in mind. The local planning authority is Elmbridge Borough Council. Policy DM6 of the Development Management Plan, adopted on 15 April 2015, requires an integral scheme of landscape, tree retention, protection and planting, and only allows significant trees to be lost where the benefits would clearly outweigh that loss. Tree belts in the Metropolitan Green Belt around the town often mark the edge of the built-up area.

Local planning authority: Elmbridge Borough Council

Weybridge Town Lock on the River Wey in Surrey
Photo: Peter S, CC BY-SA 2.0

In Weybridge

Weybridge sits at the confluence of the River Wey and the River Thames, with woodland and parkland at Brooklands Community Park and the Metropolitan Green Belt on the edge of the town. Policy DM6 also protects ancient woodland and veteran trees, and requires root protection before, during and after construction. Riverside sites on Wey Road, Walton Lane or Jessamy Road may also need levels and root-protection work coordinated with a flood risk assessment.

Rivers
River Wey — Joins the Thames at Weybridge. The Section 19 report records levels rising on 25 December 2013 and peaking on 26 December, lower than the 1968 event. Property flooding began on the afternoon of 25 December, with three properties in the vicinity of Wey Road worst affected. The 2013/14 event is estimated as a 1 in 20 to 1 in 30 annual chance event on the River Wey at Weybridge. In February 2014 the Thames rose higher and backed up the Wey.
River Thames — Forms the northern edge of Weybridge at the confluence with the Wey. The Section 19 report records February 2014 levels as the highest since 1947, causing backing up in the River Wey. In the Weybridge and Walton-on-Thames sub-area, 33 properties were affected by one river or both. The Environment Agency issued flood warnings to 363 registered Weybridge owners in December 2013 and 383 in February 2014.
Flood zones
Wey Road — The Section 19 report records that property flooding began on the afternoon of 25 December 2013, with three properties in the vicinity of Wey Road worst affected.
Walton Lane — Temporarily closed by Surrey County Council during the winter 2013/14 floods. Elmbridge Borough Council later set up a Walton Lane flood forum.
Jessamy Road — Temporarily closed by Surrey County Council during the winter 2013/14 floods.
Landmarks
Brooklands Community Park — Policy CS4 protects and improves Brooklands Community Park so that it can fulfil its role as Suitable Accessible Natural Greenspace, as part of mitigation for the Thames Basin Heaths SPA.
Special Protection Areas
Thames Basin Heaths SPA — European site protected by Policy CS13. New residential development likely to have a significant effect must provide agreed avoidance or mitigation, including a 5 km zone of influence and a 400 m exclusion zone. Brooklands Community Park is an identified SANG. Applicants should check current mapping for a specific Weybridge site rather than assume the town centre is inside the zone.
Green Belt
Metropolitan Green Belt — Wraps much of Weybridge outside the built-up area, including land around Oatlands, St George's Hill and Brooklands.
Local authority and policy

Elmbridge Borough Council assesses tree and landscape issues under Policy DM6 of the Development Management Plan, adopted on 15 April 2015, together with Policy CS15 of the Core Strategy, adopted on 20 July 2011, which protects woodland including ancient woodland. Policy DM6 expects an integral landscape and tree-protection scheme and resists the loss of significant trees and irreplaceable habitats unless exceptional circumstances apply. Confirm the current local validation requirements with the council before submitting.

Local plan: Elmbridge Core Strategy (adopted 20 July 2011) and Development Management Plan (adopted 15 April 2015) (The Core Strategy was adopted on 20 July 2011 and the Development Management Plan on 15 April 2015. These remain the adopted development plan as of 13 November 2026. A previous draft Local Plan was withdrawn from examination in 2025 after the inspector indicated it would be found unsound. A new Local Plan is at scoping consultation (4 November to 9 December 2026), with adoption scheduled for 16 August 2029; it is not adopted. The Core Strategy plan period runs to July 2026, but the adopted policies remain in force until replaced. Under local government reorganisation, plan-making passes to the new East Surrey unitary council on 1 April 2027.)

  • CS15: Biodiversity

    Seeks to avoid loss and contribute to a net gain in biodiversity. The policy protects designated sites, including those relevant to the Thames Basin Heaths SPA and the South West London Waterbodies SPA, protects woodland including ancient woodland, and protects priority habitats and species. Clause 8 requires that new development does not result in a net loss of biodiversity and, where feasible, contributes to a net gain through the incorporation of biodiversity features. It does not set a percentage. National sites named in the reasoned justification include Esher Common SSSI.

  • DM21: Nature conservation and biodiversity

    Expects all new development to preserve, manage and where possible enhance existing habitats, protected species and biodiversity features, in accordance with Core Strategy Policy CS15. Support is given to proposals that incorporate new biodiversity features. Development affecting internationally designated sites is considered against Policies CS13 and CS15 and relevant legislation. Development affecting nationally designated sites will not be permitted if it would have an adverse effect, except in exceptional circumstances where the benefits clearly outweigh the harm, with avoidance, mitigation and compensation sought. Significant harm to locally designated sites or to priority habitats and species will not be permitted. Potential SANG sites identified on the Policies Map are protected from development that would compromise that function. The presumption in favour of sustainable development does not apply to development affecting international sites.

  • DM6: Landscape and trees

    Requires development to include an integral scheme of landscape, tree retention, protection and/or planting that reflects or enhances the existing landscape, contributes to biodiversity, and does not result in the loss of or damage to significant trees and hedgerows unless, in exceptional circumstances, the benefits would outweigh the loss. Existing trees, including their root systems, must be adequately protected before, during and after construction. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, is not accepted unless, in exceptional circumstances, the benefits would outweigh the loss. The policy also covers works to trees protected by a Tree Preservation Order.

  • CS26: Flooding

    Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and risk is not increased elsewhere, with residual risks safely managed. Permission is only granted where a sequential test shows the site is in the lowest appropriate flood risk zone in accordance with national policy and the Elmbridge Strategic Flood Risk Assessment, and where development would not constrain the natural function of the flood plain. Development in Flood Zones 2 or 3 requires flood resistance and resilience measures. New development must include SuDS; all development in Flood Zones 2 and 3 must control surface water runoff at greenfield rates as near to source as possible. The policy covers both fluvial and surface water flooding and takes account of climate change. Reasoned justification records comprehensive flood defence and alleviation works along the River Mole after the 1968 floods, and residual risk behind Lower Mole defences.

  • CS13: Thames Basin Heaths Special Protection Area

    Requires new residential development likely to have a significant effect on the Thames Basin Heaths SPA to demonstrate adequate avoidance or mitigation, agreed with Natural England. A 5 km zone of influence applies, with a 400 m exclusion zone where mitigation is unlikely to protect the integrity of the SPA. Outside the exclusion zone but within 5 km, mitigation is required prior to occupation and in perpetuity, based on access management and Suitable Accessible Natural Greenspace. Applicants should check current mapping for a specific site rather than assume a town centre falls inside the zone.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Weybridge

Who is the local planning authority for a tree survey in Weybridge?

Elmbridge Borough Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.

When is a tree survey likely in Weybridge?

Policy DM6 requires an integral scheme of landscape, tree retention and protection where trees or landscape features are relevant to a proposal. A BS5837 survey, impact assessment and protection plan is the usual way to show this. Confirm the current validation checklist with the council.

Do riverside trees raise other issues?

They can. Sites along the River Wey, the River Thames, Wey Road, Walton Lane or Jessamy Road may also need flood risk work under Policy CS26, and a tree survey should be coordinated with those drawings.