Featured partner
Recommended for Woking

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Woking

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…
Ecological consultancy owned by Surrey Wildlife Trust, based at the Trust's offices in…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
Plots on or near Horsell Common, Sheets Heath or Brookwood Heath, and corridors along the Hoe Stream and the Basingstoke Canal, often need a preliminary ecological appraisal before a Woking planning application is designed. The appraisal is a first look at habitats and species, and at the further surveys that may follow. The local planning authority is Woking Borough Council. Policy CS7 of the Core Strategy protects designated sites and asks development to enhance biodiversity. Sites close to those heaths may also fall under Policy CS8 of the Thames Basin Heaths SPA, and land towards the west of the borough can be close to the Thursley, Ash, Pirbright and Chobham SAC. Even urban plots can support bats, reptiles or wetland habitats that should be flagged early, because some follow-up surveys can only be done in set seasons.
Local planning authority: Woking Borough Council

Woking's urban area is tightly bounded by heathland, Green Belt and waterways, so ecology issues appear on small as well as large sites. Horsell Common lies immediately north of the town; Sheets Heath and Brookwood Heath lie to the west; all three are SPA heaths. The Thursley, Ash, Pirbright and Chobham SAC is just beyond the western boundary. The Hoe Stream runs through the southern suburbs, and the Basingstoke Canal is a vegetated wildlife corridor through the built-up area. A PEA in this borough should therefore look beyond the red line to nearby designated sites and to linear habitats that species use to move through the town.
Woking Borough Council applies Core Strategy Policy CS7 (Biodiversity and nature conservation) when judging the effect of a proposal on habitats and species, including SSSIs, Sites of Nature Conservation Importance and Local Nature Reserves as well as European sites. Policy CS8 and the Avoidance Strategy adopted on 22 January 2026 apply where residential development could affect the Thames Basin Heaths SPA. The council will not grant permission where a proposal would adversely affect an SPA, SAC or Ramsar site, a point also made in the flooding policy, CS9, where flood works have biodiversity implications. A PEA is the usual way to show whether further protected-species or habitat surveys are needed before an application is validated and determined.
Local plan: Woking Core Strategy (2012), Development Management Policies DPD (2016) and Site Allocations Plan (2021) (Adopted. The Core Strategy was adopted on 25 October 2012 and reviewed in 2018 and on 12 October 2023. The Development Management Policies DPD was adopted on 20 October 2016 and reviewed in October 2021. The Site Allocations Plan was adopted on 14 October 2021.)
CS6: Green Belt
Protects the Metropolitan Green Belt around Woking's urban area and sets the tests for inappropriate development.
CS7: Biodiversity and nature conservation
Protects internationally, nationally and locally designated sites, including the Thames Basin Heaths SPA and the Thursley, Ash, Pirbright and Chobham SAC, and requires development to contribute to biodiversity.
CS8: Thames Basin Heaths Special Protection Areas
Gives priority protection to the SPA. No net new residential development is permitted within 400 m. Development between 400 m and 5 km must contribute to SANG and SAMM. Three component sites in or partly in the borough are Horsell Common, Sheets Heath (Brookwood) and Brookwood Heath.
CS9: Flooding and water management
Expects development in Flood Zone 1. Flood Zone 2 is considered only if there is no suitable alternative at lower risk. Development in Flood Zones 3a and 3b requires a comprehensive flood risk assessment and must not increase flood risk elsewhere. Permission is refused where proposals would adversely affect an SPA, SAC or Ramsar site.
CS21: Design
Requires proposals to incorporate landscaping, including the retention of trees of amenity value and other features.
DM2: Trees and landscaping
Supports removal of TPO or conservation-area trees only in exceptional circumstances with over-riding planning benefits and replacement planting. Requires retained trees to be protected during construction and given adequate space, and new landscape schemes to enhance character and connect to green infrastructure.
DM4: Development in the vicinity of Basingstoke Canal
Sets additional design and amenity tests for development near the Basingstoke Canal, which is also identified as a green and blue infrastructure asset.
General guidance for preliminary ecological appraisal (pea), not formal advice for your site.
Woking Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
Where a site has existing habitats, is close to the Thames Basin Heaths SPA or the Thursley, Ash, Pirbright and Chobham SAC, or includes features such as the Basingstoke Canal or the Hoe Stream. Policy CS7 requires effects on designated sites and biodiversity to be considered.
No. A PEA identifies habitats and the need for further species surveys. A net gain assessment measures habitat units with the statutory metric. Many Woking applications need both, and residential schemes in the SPA zone may also need SPA avoidance measures under Policy CS8.
No other published town guides for this survey in the council area yet.