Protected species surveys in East Ham for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Newham rules explained

Recommended For East Ham

  1. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  2. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  3. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from ROAVR Group

Tell ROAVR Group about your site in East Ham. It's free, and there's no obligation. Your request is for ROAVR Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Protected species surveys in East Ham are driven by the habitats around East Ham Town Centre Conservation Area and East Ham High Street North. Depending on the site, that may include bats, nesting birds, or species associated with water, gardens and older buildings in the centre. London Borough of Newham is the local planning authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. A preliminary ecological appraisal usually identifies which species surveys are required before an application is submitted. Confirm the current validation requirements with the council before submitting.

Local planning authority: London Borough of Newham

Newham Town Hall in East Ham, a red-brick civic building with a tall corner turret, ornate gables and a bare tree beside it
Photo: Des Blenkinsopp, CC BY-SA 2.0

In East Ham

East Ham is the eastern major centre in the borough, around East Ham Town Centre Conservation Area, East Ham High Street North and Central Park, East Ham. That civic High Street setting is not Stratford Town Centre, Queen Elizabeth Olympic Park, the River Lea or the Bow Back Rivers. Further species surveys may be needed where habitats around East Ham Town Centre Conservation Area and East Ham High Street North are affected.

Conservation areas
East Ham Town Centre Conservation Area — East Ham Town Centre Conservation Area covers the civic complex, including East Ham Town Hall (now Newham Council offices), and the historic core of the major centre.
Local character
East Ham High Street North — East Ham High Street North is the long commercial spine of East Ham Major Centre, running north from the Town Hall and station.
Landmarks
Central Park, East Ham — Central Park, East Ham lies immediately west of the town centre and is the principal public park serving the major centre.
Local authority and policy

In East Ham, including around East Ham Town Centre Conservation Area and East Ham High Street North, the London Borough of Newham assesses protected-species issues under Policy GWS3 of Our Newham Local Plan 2026–2042, adopted on 2 November 2026, together with Policy G6 of the London Plan, published on 2 March 2021. An ecological assessment is required where protected or priority species may be affected. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Our Newham Local Plan 2026–2042 (Our Newham Local Plan 2026–2042 was adopted on 2 November 2026 and is the adopted local plan. The previous Newham Local Plan 2018 and, within Newham, the LLDC Local Plan 2020 have been formally withdrawn. Stratford is now fully under the London Borough of Newham. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • CE7: Managing flood risk

    Policy CE7 requires all new development to avoid placing people or essential infrastructure at increased flood risk for the lifetime of the development, to assess risk from all sources using the Strategic Flood Risk Assessment, to apply the sequential test and, where necessary, the exception test, and to provide a flood risk assessment when required by national requirements, the SFRA and Environment Agency advice. Development should be set back a minimum of 16 metres from the landward side of tidal flood defences and eight metres from fluvial river defences. The Thames, the River Roding and the River Lea are the borough’s principal watercourses; the Thames and the Royal Docks neighbourhoods lie to the south of Stratford Town Centre, while the River Lea and the Bow Back Rivers adjoin Queen Elizabeth Olympic Park.

  • CE8: Sustainable drainage

    Policy CE8 requires sustainable drainage in new development, following the London Plan drainage hierarchy, so that surface water is managed on site and flood risk is not increased elsewhere.

  • GWS4: Trees

    Policy GWS4 of Our Newham Local Plan 2026–2042, adopted on 2 November 2026, requires development to protect trees and deliver a network of improved tree stock and canopy cover. It seeks a net increase in trees on all new development sites and requires an arboricultural report at the planning application stage for all new development with trees on or adjacent to the site. Loss is only supported in exceptional circumstances with adequate on-site replacement or a mitigating contribution. Major development that proposes to remove a tree must submit a CAVAT study.

  • GWS3: Biodiversity, urban greening, and access to nature

    Policy GWS3 requires development to deliver a biodiversity net gain of at least 10 per cent, which restates the statutory minimum and does not set a higher local percentage. Major development, and all development close to a SINC or likely to affect protected or priority species, must submit an ecological assessment. The policy also applies the London Plan urban greening factor and Epping Forest Special Area of Conservation mitigation for net additional homes within 6.2 km of the SAC.

What you’ll usually need

General guidance for protected species survey, not formal advice for your site.

Timing and seasons
Most surveys are seasonal and the window depends on the species.
Standards
Species-specific guidance (e.g. Natural England standing advice)

Questions about protected species surveys in East Ham

Who is the local planning authority for a protected species survey in East Ham?

London Borough of Newham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a protected species survey likely in East Ham?

When a planning application in East Ham could affect trees, habitats, heritage, flood risk or existing buildings around East Ham Town Centre Conservation Area and East Ham High Street North. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in East Ham alongside the London Borough of Newham local plan.