Topographical surveys in Cambridge for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Cambridge City Council rules explained

Recommended For Cambridge

  1. Glanville

    Multidisciplinary consultancy whose own site publishes a Cambridgeshire office at…

  2. Parker Planning Services

    Planning and surveying practice whose own site publishes a Cambridgeshire office at…

  3. Cambridge Land Surveys

    Land and measured building survey practice whose own site publishes an address at 23…

  4. Neon Surveys

    Land and measured building survey practice whose own site publishes an address at 62…

Get your free quote from Parker Planning Services

Tell Parker Planning Services about your site in Cambridge. It's free, and there's no obligation. Your request is for Parker Planning Services only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A topographical survey in Cambridge is often needed where work could affect the Central Conservation Area, or the River Cam. Cambridge City Council is the local planning authority. Measured survey work is often used to record levels, trees and built form in the Central Conservation Area and at the River Cam before a planning application is drawn up. It is a historic university city around the official Central Conservation Area and the River Cam, quite unlike Huntingdon, St Neots or St Ives. The adopted Cambridge Local Plan 2018 applies here. Confirm the current validation requirements with the council before submitting.

Local planning authority: Cambridge City Council

King's College Chapel and the Backs, seen across the River Cam
Photo: Christopher Hilton, CC BY-SA 2.0

In Cambridge

Cambridge is in the area of Cambridge City Council. It is a historic university city around the official Central Conservation Area and the River Cam, quite unlike Huntingdon, St Neots or St Ives. The adopted Cambridge Local Plan 2018 applies here. The Central Conservation Area and the River Cam are the official features that shape topographical survey work here. Cambridgeshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Cambridge.

Conservation areas
Central Conservation Area — The official Central Conservation Area, also referred to in the Cambridge Historic Core Conservation Area Appraisal as Central Conservation Area No. 1, of which the historic core is a sector. The appraisal is listed on Greater Cambridge Shared Planning's official conservation area appraisals page.
Rivers
River Cam — The River Cam, the official river running through Cambridge and identified in the adopted Cambridge Local Plan 2018.
Local authority and policy

In Cambridge, including around the Central Conservation Area and at the River Cam, the same adopted local plan policies apply. Cambridge City Council uses topographical information to assess proposals around official features, including the Central Conservation Area and the River Cam. Policy 71 (Trees) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that development will not be permitted which involves felling, significant surgery or potential root damage to trees of amenity or other value, unless there are demonstrable public benefits accruing from the proposal which clearly outweigh the current and future amenity value of the trees. Development proposals should preserve, protect and enhance existing trees and hedges that have amenity value as perceived from the public realm; provide appropriate replacement planting where felling is proved necessary; and provide sufficient space for trees and other vegetation to mature. Particular consideration should be given to veteran or ancient trees, as defined by Natural England, in order to preserve their historic, ecological and amenity value. Confirm the current validation requirements with the council before submitting.

Local plan: Cambridge Local Plan 2018 (adopted)

  • 69: Protection of sites of biodiversity and geodiversity importance

    Policy 69 (Protection of sites of biodiversity and geodiversity importance) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that, in determining any planning application affecting a site of biodiversity or geodiversity importance, development will be permitted if it will not have an adverse impact on, or lead to the loss of, part or all of a site identified on the Policies Map. Regard must be had to the international, national or local status and designation of the site and the nature and quality of the site's intrinsic features, including its rarity. Where development is permitted, proposals must include measures to minimise harm, to secure achievable mitigation and/or compensatory measures, and where possible enhance the nature conservation value of the site affected. The policy does not set a higher than statutory biodiversity net gain percentage. Cambridge City Council applies the statutory 10 per cent minimum.

  • 70: Protection of priority species and habitats

    Policy 70 (Protection of priority species and habitats) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that development will be permitted which protects priority species and habitats and enhances habitats and populations of priority species. Proposals that harm or disturb populations and habitats should minimise any ecological harm and secure achievable mitigation and/or compensatory measures, resulting in either no net loss or a net gain of priority habitat and local populations of priority species. Where significant harm cannot be avoided, adequately mitigated or, as a last resort, compensated for, planning permission will be refused. The policy does not set a higher than statutory biodiversity net gain percentage. Cambridge City Council applies the statutory 10 per cent minimum.

  • 32: Flood risk

    Policy 32 (Flood risk) of the Cambridge Local Plan 2018, adopted on 18 October 2018, requires it to be demonstrated that the peak rate and post-development volume of run-off over the lifetime of the development, allowing for climate change, are no greater than for the undeveloped site; that flooding of property in and adjacent to the development would not occur for a 1 in 100 year event plus climate change, including in the event of local drainage system failure; that discharge locations have capacity; and that a management and maintenance plan is in place for the lifetime of the development. Discharge should be to ground via infiltration first, then to a water body, then to a surface water sewer. Discharge to a foul water or combined sewer is unacceptable. Development is also required to be supported by an assessment of the flood risk to the development.

  • 71: Trees

    Policy 71 (Trees) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that development will not be permitted which involves felling, significant surgery or potential root damage to trees of amenity or other value, unless there are demonstrable public benefits accruing from the proposal which clearly outweigh the current and future amenity value of the trees. Development proposals should preserve, protect and enhance existing trees and hedges that have amenity value as perceived from the public realm; provide appropriate replacement planting where felling is proved necessary; and provide sufficient space for trees and other vegetation to mature. Particular consideration should be given to veteran or ancient trees, as defined by Natural England, in order to preserve their historic, ecological and amenity value.

What you’ll usually need

General guidance for topographical survey, not formal advice for your site.

Timing and seasons
Not seasonal; dense summer vegetation can slow fieldwork.
Standards
RICS Measured surveys of land, buildings and utilities

Questions about topographical surveys in Cambridge

Who is the local planning authority for a topographical survey in Cambridge?

Cambridge City Council. Cambridgeshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Cambridge.

When is a topographical survey likely in Cambridge?

A topographical survey in Cambridge is often needed to record levels, trees and built form in the Central Conservation Area or at the River Cam before a planning application is drawn up. Confirm the current validation requirements with the council.

Why does a topographical survey matter around official features in Cambridge?

Accurate levels and feature locations help show how a proposal relates to the Central Conservation Area and the River Cam, including trees, water and built form. Confirm the current validation requirements with the council.