Topographical surveys in Enfield Town for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Enfield rules explained

Recommended For Enfield Town

  1. Cadmap

    Land and building surveying company with offices in Surrey (Dunsfold Park), London,…

  2. LC Surveyors

    Measured building and land surveyors trading from 111 Gosterwood Street in Deptford, in…

  3. Scope Surveys

    Land and measured-building survey practice with a London office in Crystal Palace.

  4. Ridgeway Surveys

    Land survey and site engineering practice based in Chesham, north-west of the M25.

Get your free quote from Scope Surveys

Tell Scope Surveys about your site in Enfield Town. It's free, and there's no obligation. Your request is for Scope Surveys only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

An accurate topographical survey of levels, trees, buildings and the New River corridor is the usual base plan for a BS 5837 tree survey and for drainage design in Enfield Town. Around Enfield Civic Centre, in the Enfield Town Conservation Area and beside Enfield Town Park, it shows how a proposal sits relative to the waterway, existing trees and overland flow routes. The London Borough of Enfield expects trees of significant amenity or biodiversity value to be plotted and protected, and it requires flood risk and surface water to be understood from the outset. Surface water flood risk assessments and SuDS schemes depend on reliable levels and the position of existing drains and soft landscape.

Local planning authority: London Borough of Enfield

Enfield Civic Centre rising behind a terrace of bay-fronted houses on Silver Street in Enfield Town
Photo: James Cracknell, CC BY-SA 4.0

In Enfield Town

Sites in the Enfield Town Conservation Area, around Enfield Civic Centre, along the New River and beside Enfield Town Park need accurate levels and tree positions. A topographical survey supports Policy DMD 80 and the flood-risk work required under Policies DMD 59 to DMD 61, including surface water flood risk.

Conservation areas
Enfield Town Conservation Area
Landmarks
Enfield Civic Centre
Rivers
New River
Other
Enfield Town Park
Flood zones
surface water flood risk
Local authority and policy

The London Borough of Enfield relies on accurate site information to apply Policy DMD 80 on trees and Policies DMD 59 to DMD 61 on flood risk and drainage. Confirm the current local validation requirements with the council before submitting.

Local plan: Enfield Core Strategy 2010–2025 and Development Management Document (2014) (The adopted borough-wide development plan documents remain the Core Strategy (November 2010) and the Development Management Document (November 2014). A new Local Plan has been submitted for examination and is not treated as adopted. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • DMD 80: Trees on Development Sites

    Policy DMD 80 of the Enfield Development Management Document, adopted in November 2014, refuses development, including subsidiary or enabling works, that involves the loss of or harm to trees covered by Tree Preservation Orders or trees of significant amenity or biodiversity value, unless exceptional circumstances support removal and adequate replacement is provided. All development and demolition must retain and protect trees of amenity and biodiversity value on the site and on adjacent sites, ensure the future long-term health and amenity value of the trees is not harmed, and provide adequate separation from buildings, including regard to shading. Works must comply with established arboricultural good practice, guidelines and legislation. Supporting text advises that measures to safeguard retained trees should be in accordance with BS 5837.

  • DMD 78: Nature Conservation

    Policy DMD 78 permits development that has a direct or indirect negative impact upon important ecological assets only where the harm cannot reasonably be avoided and it has been demonstrated that appropriate mitigation can address the harm, secured through planning obligations or conditions. Important ecological assets include the Chingford Reservoirs Site of Special Scientific Interest, Sites of Importance for Nature Conservation, ancient woodland, veteran trees, and habitats and species of principal importance. Major development in areas of deficiency must maximise opportunities to improve access to nature. Policy DMD 79 separately requires on-site ecological enhancements on developments creating 100 square metres of floorspace or one net dwelling or more, having regard to feasibility and viability. Core Policy 36 of the Core Strategy, adopted in November 2010, seeks to protect, enhance, restore or add to biodiversity interests.

  • Core Policy 36: Biodiversity

    Core Policy 36 of the Enfield Core Strategy, adopted in November 2010, seeks to protect, enhance, restore or add to biodiversity interests in the borough, including parks, green corridors, waterways, and sites, habitats and species identified at European, national, London or local level. The council will continue to protect, restore and enhance such sites and will require improvements to biodiversity provision, with priority given to areas of deficiency. The policy does not set a biodiversity net gain percentage above the national minimum.

  • DMD 59: Avoiding and Reducing Flood Risk

    Policy DMD 59 requires new development to avoid and reduce the risk of flooding and not increase the risks elsewhere. Development must be appropriately located and informed by a site-specific flood risk assessment in flood risk areas in line with Policy DMD 60, preserve overland flood and flow routes, ensure no net loss of flood storage on site (or, exceptionally, adequate off-site compensatory storage), manage surface water in line with Policy DMD 61, and prevent the loss of permeable surfaces while maximising green infrastructure as potential flood storage. Policy DMD 60 sets when a flood risk assessment is required, including development of 1 hectare or more in Flood Zone 1, all new development in Flood Zones 2 and 3, below-ground space in groundwater flood risk areas, and proposals identified as being at risk from surface water flooding in the Surface Water Management Plan. Policy DMD 61 requires a drainage strategy for all developments, with major development required to achieve greenfield run-off rates. Core Policy 28 requires Sustainable Drainage Systems in all developments.

  • Core Policy 28: Managing Flood Risk Through Development

    Core Policy 28 of the Enfield Core Strategy, adopted in November 2010, takes a risk-based approach to development and flood risk, directing development to areas of lowest risk. Sustainable Drainage Systems are required in all developments, irrespective of the flood risk at individual sites. Developments in areas identified as being at risk from surface or groundwater flooding must demonstrate that further investigation of the extent of risk, and the feasibility of options for prevention or mitigation, have been considered. A Level 2 Strategic Flood Risk Assessment was identified for Enfield Town among other locations.

What you’ll usually need

General guidance for topographical survey, not formal advice for your site.

Timing and seasons
Not seasonal; dense summer vegetation can slow fieldwork.
Standards
RICS Measured surveys of land, buildings and utilities

Questions about topographical surveys in Enfield Town

Who is the local planning authority for a topographical survey in Enfield Town?

The London Borough of Enfield. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

Why is a topographical survey useful in Enfield Town?

It supports the tree protection expected under Policy DMD 80 and the flood risk and drainage work required by Policies DMD 59 to DMD 61, especially beside the New River and Enfield Town Park.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 and Policies SI12 and SI13 are the London Plan policies most often read alongside a site survey.