Topographical surveys in Hackney for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Hackney rules explained

Recommended For Hackney

  1. Cadmap

    Land and building surveying company with offices in Surrey (Dunsfold Park), London,…

  2. LC Surveyors

    Measured building and land surveyors trading from 111 Gosterwood Street in Deptford, in…

  3. Scope Surveys

    Land and measured-building survey practice with a London office in Crystal Palace.

  4. Ridgeway Surveys

    Land survey and site engineering practice based in Chesham, north-west of the M25.

Get your free quote from LC Surveyors

Tell LC Surveyors about your site in Hackney. It's free, and there's no obligation. Your request is for LC Surveyors only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A topographical survey in Hackney Town Centre records levels, boundaries and features along Mare Street and around Hackney Town Hall, and it underpins tree, drainage and design work. The local planning authority is the London Borough of Hackney. Policy LP51 of the Hackney Local Plan 2033, adopted on 22 July 2020, expects BS5837 tree surveys, usually plotted on an accurate site survey. Policy LP53 also relies on site levels when flood risk and sustainable drainage are assessed. Policy G7 of the London Plan, published on 2 March 2021, also forms part of the development plan.

Local planning authority: London Borough of Hackney

Hackney Town Hall on Mare Street, a pale stone civic building with a clock and a wide flight of steps
Photo: Richard Kelly, CC BY 4.0

In Hackney

A survey in Hackney Town Centre should pick up trees, levels and drainage features along Mare Street and around Hackney Town Hall and London Fields, especially where surface water flood risk is a concern. Sites further east may also need to record land towards the River Lea. Stamford Hill and Stoke Newington are areas covered on these pages.

Local character
Hackney Town Centre
Mare Street
Landmarks
Hackney Town Hall
Other
London Fields
Rivers
River Lea
Flood zones
surface water flood risk
Local authority and policy

The London Borough of Hackney uses accurate site information when it assesses trees under Policy LP51 and flood risk and drainage under Policy LP53 of the Hackney Local Plan 2033, adopted on 22 July 2020, together with the London Plan published on 2 March 2021. Confirm the current local validation requirements with the council before submitting.

Local plan: Hackney Local Plan 2033 (LP33) (The Hackney Local Plan 2033 (LP33) was adopted on 22 July 2020 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • LP51: Tree Management and Landscaping

    Policy LP51 of the Hackney Local Plan 2033, adopted on 22 July 2020, requires development to retain trees of amenity value, especially veteran trees, and hedgerows and natural features, and to incorporate high quality landscaping. Removal of protected trees will be refused except where overriding ecological or wider planning benefits are demonstrated, with compensatory planting. Supporting text expects surveys in accordance with BS5837.

  • LP47: Biodiversity and Sites of Importance of Nature Conservation

    Policy LP47 requires all development to protect and, where possible, enhance biodiversity leading to a net gain. All major development must include a biodiversity survey of the site. The policy does not set a biodiversity net gain percentage above the national minimum. Development on or adjacent to SINCs, watercourses and wetlands, and the nearby Walthamstow Reservoirs SPA and Walthamstow Marshes SSSI, must not have a detrimental impact unless appropriate mitigation or compensation is put in place. Buildings with an eaves or roof height of 5 metres and above must provide nesting boxes for swifts, sparrows, starlings and/or bats as appropriate.

  • LP53: Water and Flooding

    Policy LP53 requires all development to have regard to reducing flood risk to and from the site over its expected lifetime. A flood risk assessment is expected for development in fluvial flood zones 2 or 3, for sites of 1 hectare or more in flood zone 1, for smaller flood-zone-1 sites that could be affected by other sources of flooding, for major or basement development in areas of high surface-water or elevated groundwater risk, and for all development in flood zone 1 located in a critical drainage area. All major developments must submit a Sustainable Drainage Strategy. Most of Hackney is in flood zone 1; the Lea Valley at the east of the borough is the area most affected by fluvial flooding.

What you’ll usually need

General guidance for topographical survey, not formal advice for your site.

Timing and seasons
Not seasonal; dense summer vegetation can slow fieldwork.
Standards
RICS Measured surveys of land, buildings and utilities

Questions about topographical surveys in Hackney

Who is the local planning authority for a topographical survey in Hackney?

The London Borough of Hackney. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

Why is a topographical survey useful in Hackney?

An accurate survey of levels, trees and boundaries supports the BS5837 tree survey expected under Policy LP51 and the flood risk and drainage work required by Policy LP53.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 and Policies SI12 and SI13 are the London Plan policies most often read alongside a site survey.