Topographical surveys in King's Road for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Royal Borough of Kensington and Chelsea rules explained

Recommended For King's Road

  1. Cadmap

    Land and building surveying company with offices in Surrey (Dunsfold Park), London,…

  2. Topo M Surveys

    Land survey practice based in Harrow, West London.

  3. LC Surveyors

    Measured building and land surveyors trading from 111 Gosterwood Street in Deptford, in…

  4. Scope Surveys

    Land and measured-building survey practice with a London office in Crystal Palace.

Get your free quote from Scope Surveys

Tell Scope Surveys about your site in King's Road. It's free, and there's no obligation. Your request is for Scope Surveys only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A topographical survey in King's Road should pick up the levels, buildings, trees and boundaries around Royal Hospital Conservation Area and Chelsea Conservation Area. Accurate levels matter for drainage design, flood-risk modelling, access and the relationship with neighbouring heritage streets. Royal Borough of Kensington and Chelsea is the local planning authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. The survey should be tied to a recognised datum and should show features that will constrain the layout, including street trees and changes of level. Confirm the current validation requirements with the council before submitting.

Local planning authority: Royal Borough of Kensington and Chelsea

The north front of the Royal Hospital, Chelsea, a long Wren brick range with dormer windows under a dark sky, seen along the gravel path
Photo: Txllxt TxllxT, CC BY-SA 4.0

In King's Road

The King's Road (east) major centre runs from Sloane Square Conservation Area along the King's Road to Royal Hospital Conservation Area and Chelsea Conservation Area, with Cheyne Conservation Area and the River Thames to the south. That Chelsea and Embankment setting is not Kensington Palace Conservation Area, Kensington Gardens or Kensington Square. Levels and tree positions around Royal Hospital Conservation Area and Chelsea Conservation Area are the usual starting point for a measured survey.

Conservation areas
Royal Hospital Conservation Area — Royal Hospital Conservation Area is bounded to the north by the King's Road and to the south by Chelsea Embankment, and is dominated by the Royal Hospital and Ranelagh Gardens. The appraisal was adopted on 31 March 2016.
Chelsea Conservation Area — Chelsea Conservation Area adjoins the King's Road and retains a predominantly residential character of houses from the 1830s onwards. The appraisal was adopted on 4 January 2016.
Sloane Square Conservation Area — Sloane Square Conservation Area covers the eastern end of the King's Road (east) major centre, including the square itself. The appraisal was adopted on 23 November 2017.
Cheyne Conservation Area — Cheyne Conservation Area covers the historic Thames-side streets of Chelsea, including Cheyne Walk, and has one of the longest building histories in the borough.
Rivers
River Thames — The River Thames forms the southern edge of the King's Road (east) centre at Chelsea Embankment and Cheyne Walk, unlike Kensington High Street which sits inland by Kensington Gardens.
Local authority and policy

In King's Road, including around Royal Hospital Conservation Area and Chelsea Conservation Area, the Royal Borough of Kensington and Chelsea relies on accurate site information to apply Policy GB16 on trees and Policies GB11 and GB12 on flood risk and drainage in the Local Plan 2024, adopted on 24 July 2024. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Local Plan 2024 (The Local Plan 2024 was adopted on 24 July 2024 and is the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • GB16: Trees

    Policy GB16 of the Local Plan 2024, adopted on 24 July 2024, resists the loss of trees of amenity, historic or ecological value, except where a tree is dead, dying or dangerous, is demonstrated as causing significant damage to adjacent structures, or felling is for reasons of good arboricultural practice. It also resists development which results in the damage or loss of trees of townscape or amenity value, or which gives rise to a threat to their continued well-being. Trees must be adequately protected throughout the course of development, including identified root protection areas. Where practicable, any tree that is felled must be replaced with one of a suitable size, with safeguarding so that the new tree has the best possible opportunity of reaching maturity. New trees must be of a suitable species for the location and compatible with the surrounding landscape and townscape.

  • GB14: Green and Blue Infrastructure

    Policy GB14 requires development to contribute to the greening of the borough, enhance habitat to increase biodiversity, and protect or enhance nearby waterways. Major residential development must achieve an Urban Greening Factor score of 0.4 and major non-residential development a score of 0.3. Development proposals must protect biodiversity in and adjacent to Sites of Importance for Nature Conservation. A site-specific Ecological Impact Assessment is required for all major development. Relevant development, including major development, must achieve a minimum on-site biodiversity net gain of 10 per cent; where that is robustly shown not to be achievable on site, adequate mitigation should be provided on an alternative site or, as a last resort, through the biodiversity credit system. A Biodiversity Net Gain Strategy is required for development adjacent to the River Thames. The policy does not set a percentage above the statutory 10 per cent minimum.

  • GB11: Flood Risk

    Policy GB11 requires development to address and reduce flood risk and its impacts. Highly vulnerable development, including self-contained basement dwellings, will not be permitted in Flood Zone 3 and Critical Drainage Areas, and sleeping accommodation will not be permitted below ground floor level in Flood Zone 3. A site-specific flood risk assessment is required for all development in Flood Zones 2 and 3, all sites greater than one hectare, all basement development, and development in Critical Drainage Areas where there is a change to a more vulnerable use, an increase in habitable units, or sleeping accommodation below ground level. Development at risk from any source must incorporate suitable flood risk measures, including an allowance for climate change, assessment of a breach in the tidal defences, an emergency plan, and a suitable pumped device for basements connected to the sewer network. New development adjacent to the River Thames and Chelsea Creek must be set back by 16 metres from the Thames flood defence.

  • GB12: Sustainable Drainage

    Policy GB12 requires development to contribute towards a reduction in the rate and volume of surface water run-off into the combined sewer network through measures that promote multifunctional benefits. Development proposals must aim to achieve greenfield run-off rates. Householder applications must reduce the rate of runoff in a way that is proportionate to the scale of development and reflects site constraints. Only where it can be clearly demonstrated that an on-site reduction to greenfield rates is not possible should alternative approaches be considered.

What you’ll usually need

General guidance for topographical survey, not formal advice for your site.

Timing and seasons
Not seasonal; dense summer vegetation can slow fieldwork.
Standards
RICS Measured surveys of land, buildings and utilities

Questions about topographical surveys in King's Road

Who is the local planning authority for a topographical survey in King's Road?

Royal Borough of Kensington and Chelsea. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a topographical survey likely in King's Road?

When a planning application in King's Road could affect trees, habitats, heritage, flood risk or existing buildings around Royal Hospital Conservation Area and Chelsea Conservation Area. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in King's Road alongside the Royal Borough of Kensington and Chelsea local plan.