Topographical surveys in Weybridge for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Elmbridge Borough Council rules explained

Recommended For Weybridge

  1. Vertex Surveys

    Land surveying company based in Shere, in Guildford borough.

  2. Technics Group

    Surveying and construction consultancy with its head office at Merrow Business Park in…

  3. Cadmap

    Land and building surveying company with offices in Surrey (Dunsfold Park), London,…

  4. ABM Surveys

    Measured survey company founded in Cranleigh and now based in Camberley, with a second…

Get your free quote from Technics Group

Tell Technics Group about your site in Weybridge. It's free, and there's no obligation. Your request is for Technics Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Wey Road, Walton Lane and Jessamy Road sit on the River Wey and River Thames flood plain, so a topographical survey in Weybridge has to capture water edges and threshold levels as carefully as building outlines. The measured plan is the base drawing for a flood model, a Policy CS26 flood risk assessment, and Policy DM6 tree protection work around Brooklands Community Park. The local planning authority is Elmbridge Borough Council. In the Metropolitan Green Belt a clear survey also helps to show how a proposal would affect openness beside those rivers.

Local planning authority: Elmbridge Borough Council

Weybridge Town Lock on the River Wey in Surrey
Photo: Peter S, CC BY-SA 2.0

In Weybridge

The flood plains of the River Wey and the River Thames combine at Weybridge, and in February 2014 the Thames backed up the Wey. Small differences in bank, kerb and threshold level on Wey Road, Walton Lane and Jessamy Road can change how flood water moves. A survey should be coordinated with any flood risk or tree work, including towards Brooklands Community Park and the Metropolitan Green Belt.

Rivers
River Wey — Joins the Thames at Weybridge. The Section 19 report records levels rising on 25 December 2013 and peaking on 26 December, lower than the 1968 event. Property flooding began on the afternoon of 25 December, with three properties in the vicinity of Wey Road worst affected. The 2013/14 event is estimated as a 1 in 20 to 1 in 30 annual chance event on the River Wey at Weybridge. In February 2014 the Thames rose higher and backed up the Wey.
River Thames — Forms the northern edge of Weybridge at the confluence with the Wey. The Section 19 report records February 2014 levels as the highest since 1947, causing backing up in the River Wey. In the Weybridge and Walton-on-Thames sub-area, 33 properties were affected by one river or both. The Environment Agency issued flood warnings to 363 registered Weybridge owners in December 2013 and 383 in February 2014.
Flood zones
Wey Road — The Section 19 report records that property flooding began on the afternoon of 25 December 2013, with three properties in the vicinity of Wey Road worst affected.
Walton Lane — Temporarily closed by Surrey County Council during the winter 2013/14 floods. Elmbridge Borough Council later set up a Walton Lane flood forum.
Jessamy Road — Temporarily closed by Surrey County Council during the winter 2013/14 floods.
Landmarks
Brooklands Community Park — Policy CS4 protects and improves Brooklands Community Park so that it can fulfil its role as Suitable Accessible Natural Greenspace, as part of mitigation for the Thames Basin Heaths SPA.
Special Protection Areas
Thames Basin Heaths SPA — European site protected by Policy CS13. New residential development likely to have a significant effect must provide agreed avoidance or mitigation, including a 5 km zone of influence and a 400 m exclusion zone. Brooklands Community Park is an identified SANG. Applicants should check current mapping for a specific Weybridge site rather than assume the town centre is inside the zone.
Green Belt
Metropolitan Green Belt — Wraps much of Weybridge outside the built-up area, including land around Oatlands, St George's Hill and Brooklands.
Local authority and policy

Elmbridge Borough Council will expect drawings that rely on site levels, including flood risk assessments under Policy CS26 and tree surveys under Policy DM6, to be based on a competent topographical survey. There is no separate local-plan policy titled for topographical surveys, so confirm drawing standards and any validation requirements with the council before submitting.

Local plan: Elmbridge Core Strategy (adopted 20 July 2011) and Development Management Plan (adopted 15 April 2015) (The Core Strategy was adopted on 20 July 2011 and the Development Management Plan on 15 April 2015. These remain the adopted development plan as of 13 November 2026. A previous draft Local Plan was withdrawn from examination in 2025 after the inspector indicated it would be found unsound. A new Local Plan is at scoping consultation (4 November to 9 December 2026), with adoption scheduled for 16 August 2029; it is not adopted. The Core Strategy plan period runs to July 2026, but the adopted policies remain in force until replaced. Under local government reorganisation, plan-making passes to the new East Surrey unitary council on 1 April 2027.)

  • CS15: Biodiversity

    Seeks to avoid loss and contribute to a net gain in biodiversity. The policy protects designated sites, including those relevant to the Thames Basin Heaths SPA and the South West London Waterbodies SPA, protects woodland including ancient woodland, and protects priority habitats and species. Clause 8 requires that new development does not result in a net loss of biodiversity and, where feasible, contributes to a net gain through the incorporation of biodiversity features. It does not set a percentage. National sites named in the reasoned justification include Esher Common SSSI.

  • DM21: Nature conservation and biodiversity

    Expects all new development to preserve, manage and where possible enhance existing habitats, protected species and biodiversity features, in accordance with Core Strategy Policy CS15. Support is given to proposals that incorporate new biodiversity features. Development affecting internationally designated sites is considered against Policies CS13 and CS15 and relevant legislation. Development affecting nationally designated sites will not be permitted if it would have an adverse effect, except in exceptional circumstances where the benefits clearly outweigh the harm, with avoidance, mitigation and compensation sought. Significant harm to locally designated sites or to priority habitats and species will not be permitted. Potential SANG sites identified on the Policies Map are protected from development that would compromise that function. The presumption in favour of sustainable development does not apply to development affecting international sites.

  • DM6: Landscape and trees

    Requires development to include an integral scheme of landscape, tree retention, protection and/or planting that reflects or enhances the existing landscape, contributes to biodiversity, and does not result in the loss of or damage to significant trees and hedgerows unless, in exceptional circumstances, the benefits would outweigh the loss. Existing trees, including their root systems, must be adequately protected before, during and after construction. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, is not accepted unless, in exceptional circumstances, the benefits would outweigh the loss. The policy also covers works to trees protected by a Tree Preservation Order.

  • CS26: Flooding

    Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and risk is not increased elsewhere, with residual risks safely managed. Permission is only granted where a sequential test shows the site is in the lowest appropriate flood risk zone in accordance with national policy and the Elmbridge Strategic Flood Risk Assessment, and where development would not constrain the natural function of the flood plain. Development in Flood Zones 2 or 3 requires flood resistance and resilience measures. New development must include SuDS; all development in Flood Zones 2 and 3 must control surface water runoff at greenfield rates as near to source as possible. The policy covers both fluvial and surface water flooding and takes account of climate change. Reasoned justification records comprehensive flood defence and alleviation works along the River Mole after the 1968 floods, and residual risk behind Lower Mole defences.

  • CS13: Thames Basin Heaths Special Protection Area

    Requires new residential development likely to have a significant effect on the Thames Basin Heaths SPA to demonstrate adequate avoidance or mitigation, agreed with Natural England. A 5 km zone of influence applies, with a 400 m exclusion zone where mitigation is unlikely to protect the integrity of the SPA. Outside the exclusion zone but within 5 km, mitigation is required prior to occupation and in perpetuity, based on access management and Suitable Accessible Natural Greenspace. Applicants should check current mapping for a specific site rather than assume a town centre falls inside the zone.

What you’ll usually need

General guidance for topographical survey, not formal advice for your site.

Timing and seasons
Not seasonal; dense summer vegetation can slow fieldwork.
Standards
RICS Measured surveys of land, buildings and utilities

Questions about topographical surveys in Weybridge

Who is the local planning authority for a topographical survey used in a Weybridge planning application?

Elmbridge Borough Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.

Why do levels matter so much in Weybridge?

The town sits at the confluence of the River Wey and the River Thames, where the flood plains combine and the Thames can back up the Wey. Small differences in bank, kerb and threshold level around Wey Road, Walton Lane and Jessamy Road affect how water moves.

Should a topographical survey be coordinated with tree and flood work?

Yes. A tree survey under Policy DM6 and a flood risk assessment under Policy CS26 both rely on accurate positions and levels, including river banks, kerbs and canopy spreads.