Featured partner
Recommended for Bexleyheath

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Bexleyheath

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Independent arboricultural consultancy based in Coulsdon.
London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.
Independent arboricultural consultancy based in New Malden, immediately adjoining the…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Street trees along The Broadway and the well-treed landscape of Danson Park are a frequent reason for a tree survey in Bexleyheath. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Bexley. Policy DP21 of the Bexley Local Plan, adopted on 26 April 2023, includes a presumption in favour of retaining and enhancing existing trees, woodland and hedgerows, and will not normally permit development that would adversely affect important trees. The Planning Application Requirements, reviewed on 17 October 2018 and still the published local list, ask for a tree survey or arboricultural assessment where trees would be affected. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.
Local planning authority: London Borough of Bexley

Tree cover along The Broadway, in Bexleyheath Town Centre and in Danson Park, immediately west of the centre, is part of local character. A tree survey should be coordinated with any ecological appraisal of Danson Park, including the bog garden Local Nature Reserve, and with levels work where surface water flood risk is a concern. Sidcup, Welling and Crayford are areas covered on these pages.
The London Borough of Bexley assesses tree issues under Policy DP21 of the Bexley Local Plan, adopted on 26 April 2023, together with Policy G7 of the London Plan, published on 2 March 2021. The Planning Application Requirements reviewed on 17 October 2018, and still published by the council in November 2026, ask for a tree survey or arboricultural assessment prepared by an arboriculturist where trees would be affected. Confirm the current local validation requirements with the council before submitting.
Local plan: Bexley Local Plan (The Bexley Local Plan was adopted on 26 April 2023 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
DP21: Greening of development sites
Policy DP21 of the Bexley Local Plan, adopted on 26 April 2023, includes a presumption in favour of the retention and enhancement of existing trees, woodland and hedgerow cover, and resists development that would adversely affect important trees.
SP9: Protecting and enhancing biodiversity and geological assets
Policy SP9 requires the Council to protect and enhance biodiversity and geodiversity, to resist significant adverse impacts on protected or priority species, and to seek measurable net gains for biodiversity. It does not set a percentage above the national minimum.
DP20: Biodiversity and geodiversity in developments
Policy DP20 requires development to follow the mitigation hierarchy and to result in a measurable long-term net gain for biodiversity, without setting a percentage above the statutory minimum.
DP32: Flood risk management
Policy DP32 requires a site-specific flood risk assessment for all proposals in Flood Zones 2 and 3 and for all sites of 0.25 hectares or larger, regardless of flood zone, and applies a sequential approach to all sources of flooding.
DP33: Sustainable drainage systems
Policy DP33 requires all development to manage surface water through sustainable drainage systems.
General guidance for tree survey (bs5837), not formal advice for your site.
The London Borough of Bexley. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The published Planning Application Requirements ask for a tree survey or arboricultural assessment where trees would be affected. Policy DP21 also includes a presumption in favour of retaining important trees, including around The Broadway and Danson Park.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 requires trees of value to be retained where possible, with adequate replacement if they are removed.
No other published town guides for this survey in the council area yet.