Tree surveys in Bromley for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Bromley rules explained

Recommended For Bromley

  1. W.J. Kent Tree Consultants Ltd

    Independent arboricultural consultancy based in Coulsdon.

  2. Landmark Trees

    London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.

  3. Rootcause

    Independent arboricultural consultancy based in New Malden, immediately adjoining the…

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Thomson Environmental Consultants

Tell Thomson Environmental Consultants about your site in Bromley. It's free, and there's no obligation. Your request is for Thomson Environmental Consultants only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Mature trees around Church House Gardens and in Bromley Town Centre are a frequent reason for a tree survey in Bromley. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Bromley. Policy 73 of the Bromley Local Plan, adopted on 16 January 2019, seeks the retention of healthy trees of amenity value and requires a tree survey and arboricultural implications assessment where important trees may be affected. The Validation Guidance of January 2025 asks for that information where trees on or next to the site, including street trees, could be affected. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.

Local planning authority: London Borough of Bromley

Bromley Town Hall on Widmore Road, a brick civic building with copper-domed towers
Photo: Doyle of London, CC BY-SA 4.0

In Bromley

Tree cover around Church House Gardens, Market Square, Bromley Town Centre and Bromley North is part of local character. A tree survey should be coordinated with any ecological or flood work close to the River Ravensbourne, and with levels work where surface water flood risk is a concern. Orpington, Beckenham and Chislehurst are areas covered on these pages.

Local character
Bromley Town Centre
Market Square
Bromley North
Other
Church House Gardens
Rivers
River Ravensbourne
Flood zones
surface water flood risk
Local authority and policy

The London Borough of Bromley assesses tree issues under Policy 73 of the Bromley Local Plan, adopted on 16 January 2019, together with Policy G7 of the London Plan, published on 2 March 2021. The Validation Guidance of January 2025 requires a tree survey and arboricultural implications report, prepared by a qualified arboriculturist, where trees on or adjoining the site could be affected. Confirm the current local validation requirements with the council before submitting.

Local plan: Bromley Local Plan (The Bromley Local Plan was adopted on 16 January 2019 and remains the adopted local plan. A review is under way but is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • Policy 73: Development and Trees

    Policy 73 of the Bromley Local Plan, adopted on 16 January 2019, seeks the retention of healthy trees of amenity value and, where development may affect important trees, requires a tree survey and arboricultural implications assessment in accordance with BS5837.

  • Policy 72: Protected Species

    Policy 72 resists development that would have an adverse effect on protected species unless mitigating measures can be secured.

  • Policy 115: Reducing Flood Risk

    Policy 115 requires a flood risk assessment in Flood Zones 2 and 3, in surface water flood risk hotspots, and for major development across the borough, and applies the sequential and exception tests.

  • Policy 116: Sustainable Urban Drainage Systems

    Policy 116 requires developments to incorporate sustainable drainage and requires a site-specific flood risk assessment in Flood Zones 2, 3a and 3b and in Flood Zone 1 surface water hotspots.

  • Policy 79: Biodiversity and Access to Nature

    Policy 79 requires the Council to enhance biodiversity across the borough and assist ecological restoration. It does not set a biodiversity net gain percentage above the national minimum.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Bromley

Who is the local planning authority for a tree survey in Bromley?

The London Borough of Bromley. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a tree survey likely in Bromley?

The Validation Guidance of January 2025 asks for a tree survey and arboricultural implications report where trees on or next to the site, including street trees, could be affected. Policy 73 also seeks the retention of healthy trees of amenity value.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 requires trees of value to be retained where possible, with adequate replacement if they are removed.