Featured partner
Recommended for Croydon

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Croydon

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Independent arboricultural consultancy based in Coulsdon.
London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.
Independent arboricultural consultancy based in New Malden, immediately adjoining the…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Street trees along North End and the wider planting of Croydon Town Centre are a frequent reason for a tree survey in Croydon. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Croydon. Policy DM28 of the Croydon Local Plan, adopted on 27 February 2018, requires the Council to protect and enhance the borough’s woodlands, trees and hedgerows. The Local Validation List of May 2026 asks for a tree survey, arboricultural impact assessment and tree protection plan based on a topographical survey where trees would be affected. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.
Local planning authority: London Borough of Croydon

Tree cover in Croydon Town Centre, along North End and around Park Hill and Lloyd Park is part of local character, together with planting in the Croydon Opportunity Area. A tree survey should be coordinated with any ecological work close to Wandle Park or the River Wandle, and with drainage or levels work where surface water flood risk is a concern. Purley, Coulsdon, Thornton Heath and South Norwood are areas covered on these pages.
The London Borough of Croydon assesses tree and landscape issues under Policy DM28 of the Croydon Local Plan, adopted on 27 February 2018, together with Policy SP7 and Policy G7 of the London Plan, published on 2 March 2021. The Local Validation List of May 2026 requires a tree survey and arboricultural impact assessment, with a tree protection plan based on the topographical survey, where proposals affect trees. Confirm the current local validation requirements with the council before submitting.
Local plan: Croydon Local Plan 2018 (The Croydon Local Plan 2018 was adopted on 27 February 2018 and remains the adopted local plan. A later review has been published in draft, including a 2024 revised text, but that review is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
DM28: Trees
Policy DM28 of the Croydon Local Plan, adopted on 27 February 2018, requires the Council to protect and enhance the borough’s woodlands, trees and hedgerows.
DM27: Protecting and enhancing our biodiversity
Policy DM27 requires development to enhance biodiversity, to have no adverse impact on land with biodiversity or geo-diversity value, and to have no adverse impact on protected species or their habitats. It does not set a biodiversity net gain percentage above the national minimum.
SP7: Green Grid
Policy SP7 protects the Green Grid, including the Wandle Valley Area Framework, and supports street tree planting, green roofs and ecological restoration.
DM25: Sustainable Drainage Systems and reducing flood risk
Policy DM25 requires development to reduce flood risk from all sources, to apply the sequential and exception tests, and to provide sustainable drainage that achieves better than greenfield runoff rates where possible. A flood risk assessment is required for all development in Flood Zones 2 and 3 and for major development, and in Flood Zone 1 where other sources of flooding are identified.
SP6: Environment and Climate Change
Policy SP6 sets the strategic approach to climate change, flood risk and environmental quality, and records that the Council is the Lead Local Flood Authority.
General guidance for tree survey (bs5837), not formal advice for your site.
The London Borough of Croydon. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The Local Validation List of May 2026 asks for a tree survey, arboricultural impact assessment and tree protection plan where trees would be affected. Policy DM28 also requires the borough’s trees, woodlands and hedgerows to be protected and enhanced.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 requires trees of value to be retained where possible, with adequate replacement if they are removed.
No other published town guides for this survey in the council area yet.