Tree surveys in Harrow for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Harrow rules explained

Recommended For Harrow

  1. Tree Sense Arboricultural Consultants

    Independent arboricultural consultancy based in Ruislip and at Carpenders Park, near…

  2. Simon Pryce Arboriculture

    Independent arboricultural consultancy based in Radlett, just north of the London…

  3. Landmark Trees

    London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Tree Sense Arboricultural Consultants

Tell Tree Sense Arboricultural Consultants about your site in Harrow. It's free, and there's no obligation. Your request is for Tree Sense Arboricultural Consultants only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Trees on Harrow on the Hill, in the Harrow on the Hill Conservation Area and in Harrow Town Centre are a frequent reason for a tree survey in Harrow. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Harrow. Policy GI4 of the Local Plan 2021-2041, adopted on 24 March 2026, requires existing trees of value to be retained and protected, with root protection areas, and seeks at least two replacement trees for each tree lost. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.

Local planning authority: London Borough of Harrow

The High Street in Harrow on the Hill, with historic houses, iron railings and a tree-lined road
Photo: David Howard, CC BY-SA 2.0

In Harrow

Tree cover on Harrow on the Hill, around St Mary's Church, Harrow on the Hill, and in Lowlands Recreation Ground, The Grove Open Space and Harrow Recreation Ground, contributes to the setting of Harrow Town Centre. A tree survey should be coordinated with any ecological work on the Hill and along the Wealdstone Brook.

Local character
Harrow Town Centre — A Metropolitan Centre focused on the station, St Ann's Road and the shopping streets at the foot of the Hill, the main search centre for this borough page.
Landmarks
Harrow on the Hill — The wooded hill and historic settlement south of Harrow Town Centre, a defining landmark whose trees, slopes and conservation area shape survey work.
St Mary's Church, Harrow on the Hill — The parish church on the crown of Harrow on the Hill, a recognisable landmark in the conservation area.
Conservation areas
Harrow on the Hill Conservation Area — The conservation area protecting the historic hill settlement, named in the Local Plan as a heritage asset whose character should be preserved and enhanced.
Rivers
Wealdstone Brook — The watercourse running through and north of Harrow Town Centre toward Wealdstone, the main fluvial setting for the Metropolitan Centre.
River Pinn — A tributary west of Harrow Town Centre, through Pinner and the western part of the borough, identified as part of the borough's river network.
Green Belt
Metropolitan Green Belt — Covers land on the northern and western edge of the borough, beyond Harrow Town Centre, forming part of the wider landscape setting.
Other
Lowlands Recreation Ground — Open space on the south side of Harrow Town Centre, at the foot of Harrow on the Hill, with trees and changing levels that often feature in survey work.
Harrow Recreation Ground — A park west of Harrow Town Centre, part of the green setting between the centre and residential streets.
The Grove Open Space — Open space on the Hill side of the town, part of the planted setting between Harrow Town Centre and Harrow on the Hill.
Byron Recreation Ground — A park in Wealdstone, north of Harrow Town Centre, on the Wealdstone Brook corridor.
West Harrow Recreation Ground — Open space west of the town centre, part of the local park network between Harrow Town Centre and the River Pinn catchment.
Local authority and policy

The London Borough of Harrow assesses tree and landscape issues under Policy GI4 of the Local Plan 2021-2041, adopted on 24 March 2026, together with Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan. Policy GI4 has a presumption in favour of retaining trees, requires BS5837 categorisation and root protection areas, and normally seeks two replacement trees for each tree lost. Confirm the current local validation requirements with the council before submitting.

Local plan: Harrow Local Plan 2021-2041 (adopted 24 March 2026) and The London Plan 2021 (published 2 March 2021) (The Harrow Local Plan 2021-2041 was adopted on 24 March 2026 and is the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. It replaces the 2012 and 2013 plan documents. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Harrow is the local planning authority and the Lead Local Flood Authority.)

  • GI3: Biodiversity

    Requires development proposals, unless exempt under the Environment Act 2021, to contain a biodiversity plan including an appropriate net gain metric, a preliminary ecological assessment where appropriate, and an on- and off-site mitigation and management plan. Proposals must follow the mitigation hierarchy and must not result in loss of, or uncompensated harm to, irreplaceable habitats, designated sites or other important features. Unless exempt, major and minor development must be supported by a Biodiversity Net-Gain Plan demonstrating a minimum of 2 biodiversity units per hectare or a minimum net uplift of 10 per cent, whichever is greater, plus at least one wildlife enhancement per residential dwelling. Following the NPPF published on 17 August 2026, the statutory 10 per cent minimum applies except where a higher figure is justified on a specific site allocation.

  • GI4: Urban Greening, Landscaping and Trees

    Requires a design-led approach that maximises local greening, with a presumption in favour of retaining and integrating existing trees, woodlands and hedgerows. Trees identified for retention must be protected during construction, with appropriate root protection areas. Planning permission will be refused where proposals would result in the loss of or harm to trees subject to a TPO, ancient or veteran trees or woodland, or trees categorised as suitable quality and value in a BS5837 survey. Where tree loss is unavoidable, replacement will be required at a rate of at least two new trees for each tree lost, on site where appropriate, or by a contribution for any shortfall. Major development should meet the London Plan Urban Greening Factor scores of 0.4 for predominantly residential and 0.3 for predominantly commercial development unless it is not feasible.

  • CN3: Reducing Flood Risk

    Requires proposals to apply the sequential and exception tests in line with national policy. Where a flood risk assessment is required, it must show that the development will be resistant and resilient to all relevant sources of flooding including surface water, minimise flood risk on site, not increase flood risk elsewhere, reduce flood risk overall where possible, and provide a dry means of escape. For residential development in Flood Zone 3, finished floor levels must be at least 300 mm above the modelled 1 in 100 year plus climate change flood level. Basement development will not be allowed on sites in Flood Zone 3b, and new dwellings or additional habitable accommodation in basements will be refused. Natural flood management methods should be the preferred approach.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Harrow

Who is the local planning authority for a tree survey in Harrow?

London Borough of Harrow. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a tree survey likely in Harrow?

Policy GI4 expects trees of value to be retained, protected with root protection areas, and categorised in a BS5837 survey. It also seeks at least two replacement trees for each tree lost. This is particularly relevant on Harrow on the Hill, in the Harrow on the Hill Conservation Area and in Harrow Town Centre. Confirm the February 2024 local validations checklist with the council.

Does the London Plan also apply?

Yes. Policy G7 of the London Plan forms part of the development plan and requires trees of value to be retained where possible, with adequate replacement if they are removed.