Featured partner
Recommended for Ilford

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Ilford

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Arboricultural and ecological consultancy trading as Tim Moya Associates from 2 The…
London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.
Independent arboricultural consultancy based in Coulsdon.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Street trees along Ilford High Road and planting around Redbridge Town Hall and Valentines Park are a frequent reason for a tree survey in Ilford. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Redbridge. Policy LP38 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, protects trees and seeks to enhance the landscape. The Local and National Planning Application Requirement List of April 2024 requires an arboricultural impact statement and tree survey, prepared by a qualified arboriculturist to BS5837, for all applications where trees within or adjacent to the site may be affected, including a tree protection plan and method statement. Policy G7 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Redbridge

Tree cover in Ilford Town Centre, along Ilford High Road and around Redbridge Town Hall and Valentines Park, should be recorded alongside any work near the River Roding, which runs close to the town rather than through every High Road frontage. Barkingside, Gants Hill, South Woodford and Wanstead are areas covered on these pages.
The London Borough of Redbridge assesses tree and landscape issues under Policy LP38 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, together with Policy G7 of the London Plan, published on 2 March 2021. The April 2024 validation list requires a BS5837 arboricultural report, tree survey, tree protection plan and method statement where trees within or adjacent to the site may be affected. Confirm the current local validation requirements with the council before submitting.
Local plan: Redbridge Local Plan 2015–2030 (The Redbridge Local Plan 2015–2030 was adopted on 15 March 2018 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
LP38: Protecting Trees and Enhancing the Landscape
Policy LP38 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, protects trees and seeks to enhance the landscape.
LP39: Nature Conservation and Biodiversity
Policy LP39 protects nature conservation and biodiversity. It does not set a biodiversity net gain percentage above the national minimum.
LP37: Green Infrastructure and Blue Ribbon Network
Policy LP37 addresses green infrastructure and the Blue Ribbon Network, including the River Roding.
LP21: Water and Flooding
Policy LP21 addresses water and flooding, including flood risk assessment and sustainable drainage.
General guidance for tree survey (bs5837), not formal advice for your site.
The London Borough of Redbridge. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The April 2024 validation list requires a BS5837 arboricultural report, tree survey, tree protection plan and method statement where trees within or adjacent to the site may be affected. Policy LP38 also protects trees and the landscape.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 requires trees of value to be retained where possible, with adequate replacement if they are removed.
No other published town guides for this survey in the council area yet.