Featured partner
Recommended for Kingston upon Thames

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Kingston upon Thames

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Independent arboricultural consultancy based in Coulsdon.
Farnham-based tree consultancy led by Alex Needs, a Chartered Arboriculturist and…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…
Trees in Kingston Town Centre, along the River Thames and in the Thames Policy Area are a frequent reason for a tree survey in Kingston upon Thames. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the Royal Borough of Kingston upon Thames. Policy DM 10 of the Core Strategy, adopted on 17 April 2012, requires that trees important to character or protected by a Tree Preservation Order are not adversely affected, and normally seeks two replacement specimens for each tree lost. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.
Local planning authority: Royal Borough of Kingston upon Thames

Street trees and riverside planting in Kingston Town Centre, along the River Thames and the River Hogsmill, and in the Hogsmill Valley, contribute to local character. A tree survey should be coordinated with any flood risk or ecological work close to those watercourses and the Thames Policy Area.
The Royal Borough of Kingston upon Thames assesses tree and landscape issues under Policy DM 10 of the Core Strategy, adopted on 17 April 2012, together with Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan. Policy DM 10 normally requires two replacement specimens for each tree lost. Confirm the current local validation requirements with the council before submitting.
Local plan: Royal Borough of Kingston upon Thames Core Strategy (adopted 17 April 2012) and The London Plan 2021 (published 2 March 2021) (The Core Strategy was adopted on 17 April 2012 and remains the adopted borough development plan as of 13 November 2026, together with the Kingston Town Centre Area Action Plan (K+20, 2008) until it is replaced. The London Plan 2021, published on 2 March 2021, also forms part of the development plan. A new Kingston Local Plan 2028-2043 reached Regulation 19 consultation in 2026 and is not adopted. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The Royal Borough of Kingston upon Thames is the local planning authority and the Lead Local Flood Authority.)
SI 12: Flood risk management
Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.
DM 10: Design Requirements for New Developments
Requires new development to apply good design, including a tree test: trees that are important to character, or are protected by a Tree Preservation Order, must not be adversely affected. Where trees are lost, the council will normally require two replacement specimens for each tree lost, and will refuse permission if the leafy character of the area would be harmed without commensurate replacement.
DM 6: Biodiversity
Requires development to protect and promote biodiversity. An ecological assessment is required for major development or where there is significant habitat. Proposals should not result in a net loss of biodiversity and, where appropriate, should include new or improved habitats. The policy does not set a percentage. Statutory 10 per cent biodiversity net gain under the Environment Act 2021 applies to qualifying development.
G6: Biodiversity and access to nature
London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.
G7: Trees and woodlands
Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.
DM 4: Water Management and Flood Risk
Requires a flood risk assessment for all development in Flood Zones 2 and 3 and for major development of 1 hectare or more in Flood Zone 1, considering all sources of flooding, climate change and the Strategic Flood Risk Assessment. Sustainable drainage should be used unless it is not feasible, following the Mayor's drainage hierarchy, and sewer capacity should be considered. The borough is the Lead Local Flood Authority under the Flood and Water Management Act 2010.
General guidance for tree survey (bs5837), not formal advice for your site.
The Royal Borough of Kingston upon Thames. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
Policy DM 10 expects trees that are important to character, or protected by a TPO, not to be adversely affected. A BS5837 survey, impact assessment and protection plan are the usual way to show this. Confirm the current validation checklist with the council.
Yes. Policy G7 of the London Plan forms part of the development plan and requires trees of value to be retained where possible, with adequate replacement if they are removed.
No other published town guides for this survey in the council area yet.