Tree surveys in Kingston upon Thames for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Royal Borough of Kingston upon Thames rules explained

Recommended For Kingston upon Thames

  1. W.J. Kent Tree Consultants Ltd

    Independent arboricultural consultancy based in Coulsdon.

  2. Holt Arboriculture

    Farnham-based tree consultancy led by Alex Needs, a Chartered Arboriculturist and…

  3. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  4. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

Get your free quote from W.J. Kent Tree Consultants Ltd

Tell W.J. Kent Tree Consultants Ltd about your site in Kingston upon Thames. It's free, and there's no obligation. Your request is for W.J. Kent Tree Consultants Ltd only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Trees in Kingston Town Centre, along the River Thames and in the Thames Policy Area are a frequent reason for a tree survey in Kingston upon Thames. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the Royal Borough of Kingston upon Thames. Policy DM 10 of the Core Strategy, adopted on 17 April 2012, requires that trees important to character or protected by a Tree Preservation Order are not adversely affected, and normally seeks two replacement specimens for each tree lost. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.

Local planning authority: Royal Borough of Kingston upon Thames

The Market Place in Kingston upon Thames, with the Market House and the central statue
Photo: Bill Boaden, CC BY-SA 2.0

In Kingston upon Thames

Street trees and riverside planting in Kingston Town Centre, along the River Thames and the River Hogsmill, and in the Hogsmill Valley, contribute to local character. A tree survey should be coordinated with any flood risk or ecological work close to those watercourses and the Thames Policy Area.

Rivers
River Thames — Forms the western edge of Kingston Town Centre and is part of the Thames Policy Area in the Core Strategy. The town centre includes land in flood risk zones associated with the river.
River Hogsmill — A tributary of the Thames that joins the main river at Kingston Town Centre. The Core Strategy identifies the Hogsmill Valley as a key area of change and a corridor for flood risk, biodiversity and open space.
Bonesgate Stream — A tributary identified in the Core Strategy reasoned justification on water management and flood risk, forming part of the borough's ordinary watercourse network.
Local character
Kingston Town Centre — A Metropolitan Centre on the Thames and Hogsmill, identified in the Core Strategy as a focus for development and as an area that includes land in flood risk zones.
Thames Policy Area — Designated in the Core Strategy (Policy CS 4 and Policy DM 7) along the River Thames, including the Kingston Town Centre frontage, to protect and enhance the character of the river and its setting.
Hogsmill Valley — Identified in the Core Strategy as a Key Area of Change, combining open space, watercourse and development sites along the River Hogsmill.
Local authority and policy

The Royal Borough of Kingston upon Thames assesses tree and landscape issues under Policy DM 10 of the Core Strategy, adopted on 17 April 2012, together with Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan. Policy DM 10 normally requires two replacement specimens for each tree lost. Confirm the current local validation requirements with the council before submitting.

Local plan: Royal Borough of Kingston upon Thames Core Strategy (adopted 17 April 2012) and The London Plan 2021 (published 2 March 2021) (The Core Strategy was adopted on 17 April 2012 and remains the adopted borough development plan as of 13 November 2026, together with the Kingston Town Centre Area Action Plan (K+20, 2008) until it is replaced. The London Plan 2021, published on 2 March 2021, also forms part of the development plan. A new Kingston Local Plan 2028-2043 reached Regulation 19 consultation in 2026 and is not adopted. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The Royal Borough of Kingston upon Thames is the local planning authority and the Lead Local Flood Authority.)

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

  • DM 10: Design Requirements for New Developments

    Requires new development to apply good design, including a tree test: trees that are important to character, or are protected by a Tree Preservation Order, must not be adversely affected. Where trees are lost, the council will normally require two replacement specimens for each tree lost, and will refuse permission if the leafy character of the area would be harmed without commensurate replacement.

  • DM 6: Biodiversity

    Requires development to protect and promote biodiversity. An ecological assessment is required for major development or where there is significant habitat. Proposals should not result in a net loss of biodiversity and, where appropriate, should include new or improved habitats. The policy does not set a percentage. Statutory 10 per cent biodiversity net gain under the Environment Act 2021 applies to qualifying development.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • DM 4: Water Management and Flood Risk

    Requires a flood risk assessment for all development in Flood Zones 2 and 3 and for major development of 1 hectare or more in Flood Zone 1, considering all sources of flooding, climate change and the Strategic Flood Risk Assessment. Sustainable drainage should be used unless it is not feasible, following the Mayor's drainage hierarchy, and sewer capacity should be considered. The borough is the Lead Local Flood Authority under the Flood and Water Management Act 2010.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Kingston upon Thames

Who is the local planning authority for a tree survey in Kingston upon Thames?

The Royal Borough of Kingston upon Thames. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a tree survey likely in Kingston upon Thames?

Policy DM 10 expects trees that are important to character, or protected by a TPO, not to be adversely affected. A BS5837 survey, impact assessment and protection plan are the usual way to show this. Confirm the current validation checklist with the council.

Does the London Plan also apply?

Yes. Policy G7 of the London Plan forms part of the development plan and requires trees of value to be retained where possible, with adequate replacement if they are removed.