Tree surveys in Molesey for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Elmbridge Borough Council rules explained

Recommended For Molesey

  1. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  2. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

  3. Holt Arboriculture

    Farnham-based tree consultancy led by Alex Needs, a Chartered Arboriculturist and…

  4. Tamla Trees

    Independent arboricultural consultancy based near Fleet, led by Keiron Hart, who is…

Get your free quote from Thomson Environmental Consultants

Tell Thomson Environmental Consultants about your site in Molesey. It's free, and there's no obligation. Your request is for Thomson Environmental Consultants only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Trees around Hurst Park and in the Bridge Road Conservation Area are typical starting points for a tree survey in Molesey. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is Elmbridge Borough Council. Policy DM6 of the Development Management Plan, adopted on 15 April 2015, expects an integral scheme of landscape, tree retention, protection and planting, and resists the loss of significant trees unless, in exceptional circumstances, the need for the development outweighs that harm. Riverside trees along the River Thames, and towards the River Mole confluence, should be treated as part of that setting.

Local planning authority: Elmbridge Borough Council

Molesey Lock on the River Thames, with a narrowboat in the chamber and Hampton Court Bridge in the distance
Photo: Alan Varndell, CC BY-SA 2.0

In Molesey

East Molesey meets the River Thames at the confluence with the River Mole, opposite Hampton Court, with the Bridge Road Conservation Area on the approach to the bridge and Hurst Park along the frontage. Policy DM6 also protects ancient woodland and veteran trees, and requires root protection before, during and after construction. West Molesey and Thames Ditton are treated as areas covered on these pages. A survey should be coordinated with any flood work behind the Lower Mole Flood Alleviation Scheme.

Rivers
River Mole — The River Mole meets the River Thames in East Molesey, opposite Hampton Court. A gauge on the Mole near that confluence recorded its highest peak in 16 years of a 26-year record on 13 December 2013. East Molesey and Thames Ditton sit in the lower Mole and Thames catchments.
River Thames — The Section 19 report records one property in Molesey flooded from the Thames in January 2014 and twelve properties in February 2014. The Environment Agency issued River Thames flood warnings for Molesey to 1,736 registered owners in January 2014 and 1,770 in February 2014, and stationed flood ambassadors in Molesey for the February event.
Landmarks
Lower Mole Flood Alleviation Scheme — The Lower Mole Flood Alleviation Scheme provides protection to an estimated 10,000 properties. The Environment Agency operated the scheme on 24 and 25 December 2013 and as necessary through January and February 2014. High flows caused some bank erosion, later repaired by the Environment Agency.
Flood zones
Hurst Park — Hurst Park is the riverside neighbourhood on the Thames in Molesey. After the winter 2013/14 floods Elmbridge Borough Council set up a Hurst Park flood forum, alongside forums for Thames Ditton Island and Wheatley's Eyot.
Conservation areas
Bridge Road Conservation Area — One of two conservation areas in East Molesey designated by Elmbridge Borough Council, covering the Bridge Road approach to Hampton Court Bridge. The council publishes a designation statement, character appraisal endorsed on 18 April 2006, and a townscape map.
Green Belt
Metropolitan Green Belt — Metropolitan Green Belt wraps the southern and western edges of Molesey towards Esher and the lower Mole corridor.
Local authority and policy

Elmbridge Borough Council assesses tree and landscape issues under Policy DM6 of the Development Management Plan, adopted on 15 April 2015, together with Policy CS15 of the Core Strategy, adopted on 20 July 2011, which protects woodland including ancient woodland. Policy DM6 expects an integral landscape and tree-protection scheme and resists the loss of significant trees and irreplaceable habitat. Confirm the current validation requirements with the council before submitting.

Local plan: Elmbridge Core Strategy (adopted 20 July 2011) and Development Management Plan (adopted 15 April 2015) (The Core Strategy was adopted on 20 July 2011 and the Development Management Plan on 15 April 2015. These remain the adopted development plan as of 13 November 2026. A previous draft Local Plan was withdrawn from examination in 2025 after the inspector indicated it would be found unsound. A new Local Plan is at scoping consultation (4 November to 9 December 2026), with adoption scheduled for 16 August 2029; it is not adopted. The Core Strategy plan period runs to July 2026, but the adopted policies remain in force until replaced. Under local government reorganisation, plan-making passes to the new East Surrey unitary council on 1 April 2027.)

  • CS15: Biodiversity

    Seeks to avoid loss and contribute to a net gain in biodiversity. The policy protects designated sites, including those relevant to the Thames Basin Heaths SPA and the South West London Waterbodies SPA, protects woodland including ancient woodland, and protects priority habitats and species. Clause 8 requires that new development does not result in a net loss of biodiversity and, where feasible, contributes to a net gain through the incorporation of biodiversity features. It does not set a percentage. National sites named in the reasoned justification include Esher Common SSSI.

  • DM21: Nature conservation and biodiversity

    Expects all new development to preserve, manage and where possible enhance existing habitats, protected species and biodiversity features, in accordance with Core Strategy Policy CS15. Support is given to proposals that incorporate new biodiversity features. Development affecting internationally designated sites is considered against Policies CS13 and CS15 and relevant legislation. Development affecting nationally designated sites will not be permitted if it would have an adverse effect, except in exceptional circumstances where the benefits clearly outweigh the harm, with avoidance, mitigation and compensation sought. Significant harm to locally designated sites or to priority habitats and species will not be permitted. Potential SANG sites identified on the Policies Map are protected from development that would compromise that function. The presumption in favour of sustainable development does not apply to development affecting international sites.

  • DM6: Landscape and trees

    Requires development to include an integral scheme of landscape, tree retention, protection and/or planting that reflects or enhances the existing landscape, contributes to biodiversity, and does not result in the loss of or damage to significant trees and hedgerows unless, in exceptional circumstances, the benefits would outweigh the loss. Existing trees, including their root systems, must be adequately protected before, during and after construction. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, is not accepted unless, in exceptional circumstances, the benefits would outweigh the loss. The policy also covers works to trees protected by a Tree Preservation Order.

  • CS26: Flooding

    Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and risk is not increased elsewhere, with residual risks safely managed. Permission is only granted where a sequential test shows the site is in the lowest appropriate flood risk zone in accordance with national policy and the Elmbridge Strategic Flood Risk Assessment, and where development would not constrain the natural function of the flood plain. Development in Flood Zones 2 or 3 requires flood resistance and resilience measures. New development must include SuDS; all development in Flood Zones 2 and 3 must control surface water runoff at greenfield rates as near to source as possible. The policy covers both fluvial and surface water flooding and takes account of climate change. Reasoned justification records comprehensive flood defence and alleviation works along the River Mole after the 1968 floods, and residual risk behind Lower Mole defences.

  • CS13: Thames Basin Heaths Special Protection Area

    Requires new residential development likely to have a significant effect on the Thames Basin Heaths SPA to demonstrate adequate avoidance or mitigation, agreed with Natural England. A 5 km zone of influence applies, with a 400 m exclusion zone where mitigation is unlikely to protect the integrity of the SPA. Outside the exclusion zone but within 5 km, mitigation is required prior to occupation and in perpetuity, based on access management and Suitable Accessible Natural Greenspace. Applicants should check current mapping for a specific site rather than assume a town centre falls inside the zone.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Molesey

Who is the local planning authority for a tree survey in Molesey?

Elmbridge Borough Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.

When is a tree survey likely in Molesey?

Policy DM6 requires an integral scheme of landscape, tree retention and protection where trees or landscape features are affected. A BS5837 survey is the usual way to provide that information. Confirm the current validation requirements with the council.

How does the Bridge Road Conservation Area affect a tree survey in Molesey?

Trees form part of the character of the Bridge Road Conservation Area on the approach to Hampton Court Bridge. Policy DM6 still applies, and works to trees in a conservation area may also need notice to the council. Confirm the current validation requirements with the council.