Tree surveys in Richmond upon Thames for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Richmond upon Thames rules explained

Recommended For Richmond upon Thames

  1. Holt Arboriculture

    Farnham-based tree consultancy led by Alex Needs, a Chartered Arboriculturist and…

  2. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  3. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

  4. Tamla Trees

    Independent arboricultural consultancy based near Fleet, led by Keiron Hart, who is…

Get your free quote from Tamla Trees

Tell Tamla Trees about your site in Richmond upon Thames. It's free, and there's no obligation. Your request is for Tamla Trees only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Trees on Richmond Hill, in Richmond town centre and on the edge of Richmond Park are a frequent reason for a tree survey in Richmond upon Thames. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Richmond upon Thames. Policy 42 of the Local Plan, adopted on 7 October 2025, resists the loss of trees, requires protection to BS5837 and requires an appropriate replacement, or a CAVAT contribution if replacement on site is not practicable. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.

Local planning authority: London Borough of Richmond upon Thames

The River Thames at Richmond upon Thames, looking towards Richmond Bridge
Photo: Jim Osley, CC BY-SA 2.0

In Richmond upon Thames

Trees on Richmond Hill, in the Central Richmond Conservation Area, in Richmond town centre and along the River Thames are central to local character. Richmond Park, which is a Site of Special Scientific Interest and a Special Area of Conservation, also has a substantial tree resource immediately east of the town. A tree survey should be coordinated with any flood risk or ecological work close to those features.

Rivers
River Thames — Forms the western and southern edge of Richmond town and Richmond Hill. The Local Plan protects the river and its corridors, and much of the town centre and riverside sits in flood risk zones associated with the Thames.
SSSIs
Richmond Park — A nationally designated Site of Special Scientific Interest immediately east of Richmond town, also a Special Area of Conservation and a National Nature Reserve, protected under Policy 39 together with London Plan Policy G6.
Local character
Richmond Hill — The hillside above the River Thames that defines the town's character. Place-based Policy PBS6 of the Local Plan covers Richmond and Richmond Hill, including views, landscape and the setting of the river.
Richmond town centre — The historic centre around the riverside and Richmond Hill, identified in the Local Plan's place-based policies. Parts of the centre and riverside lie in flood risk zones on the River Thames.
Conservation areas
Central Richmond Conservation Area — Conservation Area CA17 Central Richmond, named in the Local Plan as one of the conservation areas at the core of Richmond town centre character. A town-centre site allocation also names it alongside CA3 Richmond Green.
Special Areas of Conservation
Richmond Park Special Area of Conservation — The European/habitats designation that overlays Richmond Park, reflecting its importance for stag beetle habitat among other features, and protected under Policy 39.
Local authority and policy

The London Borough of Richmond upon Thames assesses tree and landscape issues under Policy 42 of the Local Plan, adopted on 7 October 2025, together with Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan. Policy 42 requires BS5837 protection and an appropriate replacement or a CAVAT contribution. Confirm the current local validation requirements with the council before submitting.

Local plan: Richmond upon Thames Local Plan 2024 to 2039 (adopted 7 October 2025) and The London Plan 2021 (published 2 March 2021) (The Richmond upon Thames Local Plan 2024 to 2039 was adopted on 7 October 2025 and is the adopted borough development plan as of 13 November 2026. It replaces the previous Local Plan Review 2015-18 and the Twickenham Area Action Plan 2013. The London Plan 2021, published on 2 March 2021, also forms part of the development plan. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Richmond upon Thames is the local planning authority and the Lead Local Flood Authority.)

  • 42: Trees, Woodland and Landscape

    Requires the protection of existing trees and the provision of new trees in accordance with London Plan Policy G7. The council will resist the loss of trees, including veteran trees, except in limited circumstances, require sufficient space for crowns and roots, require tree protection to BS5837, and require an appropriate replacement for any tree that is felled or, where that is not practicable, a financial contribution using CAVAT.

  • 39: Biodiversity and Geodiversity

    Protects designated sites, including SACs, SSSIs, LNRs and SINCs, priority habitats and ecological corridors. Development should deliver measurable net gains for biodiversity. A minimum measurable 10 per cent net gain, using the latest DEFRA metric, is required for proposals that result in one dwelling or more, and for non-residential proposals that increase footprint or floorspace. The mitigation hierarchy must be followed.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected.

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible, with adequate replacement if they are removed, using a method such as i-Tree or CAVAT.

  • 8: Flood Risk and Sustainable Drainage

    A strategic policy requiring all development to be safe for its lifetime and to avoid or reduce contributing to all sources of flooding, taking account of climate change and not increasing flood risk elsewhere. The sequential test, and where necessary the exception test, apply. Mitigation and resilience, including finished floor levels and flood storage, should follow the Strategic Flood Risk Assessment, with advice from the Lead Local Flood Authority and the Environment Agency. Flood Emergency Plans are required for qualifying proposals in Flood Zones 2 and 3 or in areas at risk of surface water flooding.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Richmond upon Thames

Who is the local planning authority for a tree survey in Richmond upon Thames?

The London Borough of Richmond upon Thames. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a tree survey likely in Richmond upon Thames?

Policy 42 expects existing trees to be protected and, where a tree is felled, replaced or secured through a CAVAT contribution. A BS5837 survey, impact assessment and protection plan are the usual way to show this. Confirm the current validation checklist with the council.

Does the London Plan also apply?

Yes. Policy G7 of the London Plan forms part of the development plan and requires trees of value to be retained where possible, with adequate replacement if they are removed.