Tree surveys in Southall for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Ealing rules explained

Recommended For Southall

  1. Tree Sense Arboricultural Consultants

    Independent arboricultural consultancy based in Ruislip and at Carpenders Park, near…

  2. Simon Pryce Arboriculture

    Independent arboricultural consultancy based in Radlett, just north of the London…

  3. Landmark Trees

    London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from ROAVR Group

Tell ROAVR Group about your site in Southall. It's free, and there's no obligation. Your request is for ROAVR Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Street trees and garden trees around The Broadway and in the Norwood Green Conservation Area are a frequent reason for a tree survey in Southall. A planning application should record trees on and next to the site, including those in a conservation area or covered by a tree preservation order, and should show how they will be protected during the works. London Borough of Ealing is the local planning authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Applications around Grand Union Canal often need the same tree constraints plan as elsewhere in the borough, but the character of Southall is not interchangeable with the parent town. Confirm the current validation requirements with the council before submitting.

Local planning authority: London Borough of Ealing

Southall Manor House, a Tudor and later brick house with a timber-framed gable, seen across a green under a cloudy sky
Photo: Matt Brown, CC BY 2.0

In Southall

Southall sits in the west of the borough, around The Broadway, The Green and Southall Manor House, with the Grand Union Canal and Norwood Green Conservation Area to the south and the Yeading Brook to the west. That canalside and brook setting is not the River Brent, Ealing Common or Ealing Broadway story used on the Ealing pages. Tree surveys for applications in Southall should record street trees and garden trees around The Broadway and Norwood Green Conservation Area.

Local character
The Broadway — The Broadway, South Road and The Green form the commercial heart of Southall Major Centre, as identified in the Southall Town Plan chapter of Ealing's development plan evidence.
Conservation areas
Norwood Green Conservation Area — Norwood Green Conservation Area lies immediately south of Southall town centre and is one of the two conservation areas the Southall Town Plan identifies for the Southall area.
Other
Grand Union Canal — The Grand Union Canal runs along the south-west side of Southall; the Southall Town Plan identifies the canalside stretch as the second of the area's two conservation areas.
Landmarks
Southall Manor House — Southall Manor House, on The Green, is a Grade II* listed Elizabethan house whose setting is a recurring heritage issue in planning applications around The Green.
Rivers
Yeading Brook — Yeading Brook is the watercourse on the west side of Southall and is a distinct catchment from the River Brent through Ealing town centre.
Local authority and policy

In Southall, including around The Broadway and Norwood Green Conservation Area, the London Borough of Ealing assesses tree and landscape issues under Policy 5.10 of the Development Management DPD, adopted on 10 December 2013, together with Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan. Policy 5.10 requires replacement planting on the basis of no net loss of amenity. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Ealing Development (Core) Strategy 2026 (adopted 3 April 2012), Ealing Development Management DPD (adopted 10 December 2013) and The London Plan 2021 (published 2 March 2021) (The Development (Core) Strategy was adopted on 3 April 2012 and the Development Management DPD on 10 December 2013. Both remain the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. A new Ealing Local Plan has reached proposed main modifications, including a draft 20 per cent biodiversity net gain figure; it is not adopted and is not used in these drafts. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Ealing is the local planning authority and the Lead Local Flood Authority.)

  • 5.10: Urban Greening

    Ealing's local variation to London Plan urban greening policy requires development proposals to replace existing trees and plantings on the basis of no net loss of amenity. Provision for trees or plantings on site should replace those lost in consequence of the development; the quality and type of amenity offered should be the same or better.

  • 5.11: Green Roofs and Development Site Environs

    Ealing's local variation strongly encourages green roofs on all development where appropriate in design, contextual and conservation terms, and requires green roofs on major development within 100 metres of Green Belt, Metropolitan Open Land, a Green Corridor, Public Open Space, Community Open Space or a Site of Importance for Nature Conservation. Where amenity and biodiversity functions conflict in that buffer, biodiversity should take precedence.

  • 5.12: Flood Risk Management

    Ealing's local variation requires all development, including that on land that is not part of a defined floodplain, to ensure it is not vulnerable to surface water, sewer and groundwater flooding. New development that reduces the capacity of the floodplain or is in any way vulnerable to flooding will not be permitted within an 8 metre buffer along all main rivers and a 5 metre buffer alongside all ordinary watercourses. There is a general presumption against treatments that do not take a sustainable approach to drainage in domestic gardens and open space.

  • 5.4: Protect the Natural Environment – Biodiversity and Geodiversity

    Requires the council to protect and promote the network of nature conservation sites by enhancing their natural value and improving access, particularly in areas of deficiency. Biodiversity will be considered in the management of all green spaces and the network of waterways, and where development is proposed in or adjacent to such spaces. Particular priority is also placed on protecting sites not formally designated, including gardens and private amenity space, and on priority species identified in Biodiversity Action Plans.

  • 7B: Design Amenity

    Requires new development to achieve a high standard of amenity for users and adjacent uses, including high quality architecture, good levels of daylight, sunlight and privacy, coherent site development, a positive visual impact, and legibility and accessibility. External treatments must complement the building and context.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Southall

Who is the local planning authority for a tree survey in Southall?

London Borough of Ealing. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a tree survey likely in Southall?

When a planning application in Southall could affect trees, habitats, heritage, flood risk or existing buildings around The Broadway and Norwood Green Conservation Area. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Southall alongside the London Borough of Ealing local plan.