Featured partner
Recommended for Barking

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Barking

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Arboricultural and ecological consultancy trading as Tim Moya Associates from 2 The…
Environmental and ecology consultancy with a London office at Holyrood Street, near…
London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Older buildings in Barking Town Centre and structures around Barking Abbey and Abbey Green can support bats, so a bat survey may be needed before demolition or significant alteration. The local planning authority is the London Borough of Barking and Dagenham. Policy DMNE 3 of the Barking and Dagenham Local Plan 2020–2037, adopted on 18 September 2024, protects biodiversity, including protected species. The February 2026 FULL validation checklist requires an ecological report for major development, prepared by a qualified ecologist. Policy G6 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Barking and Dagenham

A bat survey in Barking Town Centre should be coordinated with any appraisal of Abbey Green, Barking Abbey, the River Roding and Barking Creek, which can provide foraging habitat. Dagenham Heathway is an area covered on these pages.
The London Borough of Barking and Dagenham assesses impacts on bats under Policy DMNE 3 of the Barking and Dagenham Local Plan 2020–2037, adopted on 18 September 2024, together with Policy G6 of the London Plan, published on 2 March 2021. Confirm the current local validation requirements with the council before submitting.
Local plan: Barking and Dagenham Local Plan 2020–2037 (The Barking and Dagenham Local Plan 2020–2037 was adopted on 18 September 2024 and is the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
DMNE 5: Trees
Policy DMNE 5 of the Barking and Dagenham Local Plan 2020–2037, adopted on 18 September 2024, sets out how development should protect and manage trees.
DMNE 2: Urban greening
Policy DMNE 2 requires development to demonstrate a minimum of 10 per cent biodiversity net gain. That restates the statutory minimum and does not set a higher local percentage. It also addresses urban greening.
DMNE 3: Nature conservation and biodiversity
Policy DMNE 3 protects nature conservation and biodiversity, including designated sites and habitats.
SP6: Green and blue infrastructure
Policy SP6 sets the strategic approach to green and blue infrastructure in the borough.
DMSI 6: Flood risk and defences
Policy DMSI 6 requires development to manage flood risk and to take account of flood defences.
DMSI 7: Water management
Policy DMSI 7 addresses water management, including sustainable drainage.
General guidance for bat survey, not formal advice for your site.
The London Borough of Barking and Dagenham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
A bat survey is likely where buildings would be demolished or significantly altered, or where an ecological report required for major development identifies bat potential around Barking Abbey, Abbey Green or the River Roding.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G6 requires development to manage impacts on biodiversity, including protected species.
No other published town guides for this survey in the council area yet.