Biodiversity net gain in Dartford for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Dartford Borough Council rules explained

Recommended For Dartford

  1. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  2. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  3. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from ROAVR Group

Tell ROAVR Group about your site in Dartford. It's free, and there's no obligation. Your request is for ROAVR Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Habitats along the River Darent and the River Thames, and effects on the North Kent Special Protection Areas, have to be measured carefully in a biodiversity net gain assessment in Dartford. The local planning authority is Dartford Borough Council. Policy M14 of the Dartford Plan to 2037, adopted on 22 April 2024, requires all applicable developments to deliver at least 10 per cent biodiversity net gain, measured with Defra's latest metric, with habitats secured for at least 30 years. This adopted standard matches, and does not go beyond, the statutory minimum. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation.

Local planning authority: Dartford Borough Council

Holy Trinity Church, Dartford, a flint and stone church with a square clock tower and large traceried windows, seen from the churchyard
Photo: Paul the Archivist, CC BY-SA 4.0

In Dartford

The River Darent runs through Central Dartford, and the River Thames bounds the north of the borough. Policy M14 also requires Habitats Regulations assessment and mitigation for residential development within 6 km of the North Kent Special Protection Areas, and for schemes of more than 15 dwellings between 6 km and 10 km. That test is separate from biodiversity net gain. Metropolitan Green Belt wraps the southern edge of the town.

Conservation areas
Dartford Town Centre Conservation Area — Dartford Borough Council designates the Dartford Town Centre Conservation Area, which includes most of the town's historic commercial centre and High Street.
Rivers
River Darent — The River Darent runs through Central Dartford. Policy M4 requires development with a frontage along the Rivers Thames or Darent to explore improvements to the riparian landscape, biodiversity and access, and to keep sites safe from all types of flooding for the lifetime of the development.
River Thames — The River Thames and its tidal defences bound the north of the borough. Policy M4 requires development in the tidal flood defence raising zone not to constrain the Thames Estuary 2100 Plan, and to leave space for the future management and upgrading of defences.
Special Protection Areas
North Kent Special Protection Areas — Policy M14 requires all residential development within 6 km of the North Kent Special Protection Areas and Ramsar sites, and residential schemes of more than 15 dwellings between 6 km and 10 km, to be subject to Habitats Regulations screening and appropriate assessment, with mitigation through a tariff, suitable alternative greenspace, or equivalent provision.
Green Belt
Metropolitan Green Belt — Metropolitan Green Belt wraps the southern and western edges of Dartford, including land towards Wilmington, Bean and the A2.
Local authority and policy

Dartford Borough Council applies Policy M14 of the Dartford Plan 2024 to 2037, adopted on 22 April 2024, together with the statutory biodiversity net gain duty under the Environment Act 2021, which requires a minimum 10 per cent net gain on qualifying applications. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Confirm the current validation requirements with the council before submitting.

Local plan: The Dartford Plan 2024 to 2037 (Adopted on 22 April 2024 and still in force as of 13 November 2026.)

  • M14: Biodiversity and Landscape

    Resists development on sites designated for biodiversity unless it is clearly demonstrated that biodiversity value will not be adversely affected. All applicable developments must deliver at least 10 per cent biodiversity net gain, measured with Defra's latest metric, with habitats secured for at least 30 years. Residential development within 6 km of the North Kent Special Protection Areas and Ramsar sites, and larger schemes of more than 15 dwellings between 6 km and 10 km, is subject to Habitats Regulations assessment and mitigation. Existing trees, hedgerows and landscape features should be retained wherever possible, with native replacement where removal is justified.

What you’ll usually need

General guidance for biodiversity net gain (bng), not formal advice for your site.

Timing and seasons
Habitat condition surveys are best carried out in the growing season (roughly April to September).
Standards
Statutory biodiversity metric; Environment Act 2021

Questions about bng assessments in Dartford

Who is the local planning authority for a biodiversity net gain assessment in Dartford?

Dartford Borough Council is the local planning authority.

Is biodiversity net gain required in Dartford?

Yes. Policy M14 requires at least 10 per cent biodiversity net gain on applicable development, which matches the statutory minimum. Effects on the North Kent Special Protection Areas are assessed separately under the Habitats Regulations. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Confirm the current validation requirements with the council.

Is biodiversity net gain enough on its own near the North Kent Special Protection Areas in Dartford?

No. A net gain assessment still has to be done on qualifying sites, but Policy M14 also requires Habitats Regulations assessment and mitigation for relevant residential development. The River Darent, River Thames and Metropolitan Green Belt should still be reflected in the site baseline where they form part of the habitat.