Featured partner
Recommended for Egham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Egham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
Independent ecological consultancy with a Surrey office near Farnham, plus offices in…
The River Thames corridor through Egham Hythe is a typical habitat setting for a biodiversity net gain assessment in Egham, and Policy EE10 separately protects the Thames Basin Heaths SPA. The assessment uses the statutory metric to show how a proposal will leave habitats in a measurably better state. The local planning authority is Runnymede Borough Council. Policy EE9 of the Runnymede 2030 Local Plan, adopted on 16 July 2020, seeks net gains in biodiversity but does not set a percentage. These drafts apply the statutory minimum of 10 per cent under the Environment Act 2021, unless a scheme is exempt.
Local planning authority: Runnymede Borough Council

Egham's main ecological setting is the River Thames corridor through Egham Hythe and Hythe End, together with parks, gardens and the Metropolitan Green Belt towards Cooper's Hill. Policy EE10 protects the Thames Basin Heaths SPA elsewhere in the borough: no net new homes within 400 m, and SANG and SAMM contributions within 5 km. Applicants should check current mapping for a specific site rather than assume that Egham town centre lies inside the 5 km zone. SPA avoidance and net gain are separate tests.
Runnymede Borough Council applies the statutory biodiversity net gain duty under the Environment Act 2021, which requires a minimum 10 per cent gain for qualifying development, together with Policy EE9 of the Runnymede 2030 Local Plan, adopted on 16 July 2020, which already sought net gains in biodiversity. The adopted plan does not set a higher local percentage, and these drafts follow the statutory 10 per cent. Policy EE10 on the Thames Basin Heaths SPA is additional to net gain where a site falls in the 400 m or 5 km zones. A new Local Plan is being prepared following a timetable adopted on 25 February 2026, but it had not been adopted as of 13 November 2026. Confirm the current validation requirements with the council before submitting.
Local plan: Runnymede 2030 Local Plan (Adopted on 16 July 2020 and still in force. The council adopted a timetable for a new Local Plan on 25 February 2026, with issues and options scoping consultation from 7 September to 12 October 2026; the new plan had not been adopted as of 13 November 2026.)
EE10: Thames Basin Heaths Special Protection Area
No additional residential development within 400 m of the SPA. Non-residential development within 400 m may require Appropriate Assessment. All additional residential development beyond 400 m but within 5 km must provide adequate avoidance measures, generally SANG and SAMM.
EE12: Blue Infrastructure
Protects and enhances rivers and other waterbodies, including buffers, deculverting and fish passage, and requires SuDS designs to take account of wildlife.
EE1: Townscape and Landscape Quality
Requires development to respect and enhance townscape and landscape quality, including the setting of the River Thames and historic landscapes around Egham.
EE9: Biodiversity, Geodiversity and Nature Conservation
Applies a hierarchy of sites from Ramsar and SPA/SAC through SSSI, ancient woodland, ancient or veteran trees and TPO trees, SNCIs and LNRs, to other priority habitats and species and trees of significant amenity value. The council will seek net gains in biodiversity. The policy does not set a percentage above the later statutory 10 per cent duty.
General guidance for biodiversity net gain (bng), not formal advice for your site.
Runnymede Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
Yes, for qualifying applications. These drafts apply the statutory minimum of 10 per cent under the Environment Act 2021. Policy EE9 already sought net gains but does not set a higher local percentage. Confirm the current validation requirements with the council.
Policy EE10 does not allow additional residential development within 400 m of the SPA and requires SANG and SAMM for net new homes between 400 m and 5 km. Check current mapping for the specific site; do not assume that every address in Egham is inside the 5 km zone. This test is in addition to biodiversity net gain.