Biodiversity net gain in Ilford for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Redbridge rules explained

Recommended For Ilford

  1. Tim Moya Associates

    Arboricultural and ecological consultancy trading as Tim Moya Associates from 2 The…

  2. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  3. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Thomson Environmental Consultants

Tell Thomson Environmental Consultants about your site in Ilford. It's free, and there's no obligation. Your request is for Thomson Environmental Consultants only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Valentines Park, the River Roding and planting around Redbridge Town Hall form an important part of the setting for a biodiversity net gain assessment in Ilford. The assessment uses the statutory metric to show how a proposal will secure a measurable gain. The local planning authority is the London Borough of Redbridge. Policy LP39 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, protects nature conservation and biodiversity, but it does not set a percentage above the national minimum. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Policy G6 of the London Plan, published on 2 March 2021, also forms part of the development plan.

Local planning authority: London Borough of Redbridge

Redbridge Town Hall on Ilford High Road, a stone civic building with copper-domed towers
Photo: Sunil060902, CC BY-SA 3.0

In Ilford

A net gain assessment in Ilford Town Centre or along Ilford High Road should be read alongside any appraisal of Valentines Park, Redbridge Town Hall and the River Roding. Policy LP37 addresses green infrastructure and the Blue Ribbon Network. Barkingside, Gants Hill and Wanstead are areas covered on these pages.

Local character
Ilford Town Centre
Ilford High Road
Landmarks
Redbridge Town Hall
Other
Valentines Park
Rivers
River Roding
Flood zones
surface water flood risk
Local authority and policy

The London Borough of Redbridge assesses biodiversity net gain under Policy LP39 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, together with the Environment Act 2021 and Policy G6 of the London Plan, published on 2 March 2021. Policy LP39 does not set a local percentage above 10 per cent, so the statutory minimum applies except on a justified site allocation. Confirm the current local validation requirements with the council before submitting.

Local plan: Redbridge Local Plan 2015–2030 (The Redbridge Local Plan 2015–2030 was adopted on 15 March 2018 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • LP38: Protecting Trees and Enhancing the Landscape

    Policy LP38 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, protects trees and seeks to enhance the landscape.

  • LP39: Nature Conservation and Biodiversity

    Policy LP39 protects nature conservation and biodiversity. It does not set a biodiversity net gain percentage above the national minimum.

  • LP37: Green Infrastructure and Blue Ribbon Network

    Policy LP37 addresses green infrastructure and the Blue Ribbon Network, including the River Roding.

  • LP21: Water and Flooding

    Policy LP21 addresses water and flooding, including flood risk assessment and sustainable drainage.

What you’ll usually need

General guidance for biodiversity net gain (bng), not formal advice for your site.

Timing and seasons
Habitat condition surveys are best carried out in the growing season (roughly April to September).
Standards
Statutory biodiversity metric; Environment Act 2021

Questions about bng assessments in Ilford

Who is the local planning authority for a biodiversity net gain assessment in Ilford?

The London Borough of Redbridge. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

Does Redbridge require more than 10 per cent biodiversity net gain?

No. Policy LP39 does not set a local percentage above the national minimum, so qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G6 requires development to manage impacts on biodiversity and to aim for a net gain.