Flood risk and drainage assessments in Chiswick for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Hounslow rules explained

Recommended For Chiswick

  1. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  2. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  3. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

Get your free quote from Motion

Tell Motion about your site in Chiswick. It's free, and there's no obligation. Your request is for Motion only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Flood risk in Chiswick is shaped by River Thames and Strand on the Green Conservation Area, together with surface-water drainage on and around the site. A flood risk assessment should use the current Environment Agency mapping and the council's strategic flood risk assessment, and should not borrow a neighbouring town's catchment story. London Borough of Hounslow is the local planning authority and the Lead Local Flood Authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Drainage proposals should show how surface water will be managed on site. Confirm the current validation requirements with the council before submitting.

Local planning authority: London Borough of Hounslow

The south-east front of Chiswick House, a white paladian villa with a dome, portico and sweeping stone staircases under a clear blue sky
Photo: Michael Coppins, CC BY-SA 4.0

In Chiswick

Chiswick faces the River Thames at Strand on the Green Conservation Area and Old Chiswick Conservation Area, with Chiswick High Road Conservation Area along the shopping street and Chiswick House Conservation Area inland. That Thames-side setting is not the River Crane or Hounslow Heath story used on the Hounslow pages. Flood-risk and drainage work should be written for this centre, starting from River Thames and Strand on the Green Conservation Area.

Rivers
River Thames — The River Thames forms the southern edge of Chiswick at Strand on the Green and Chiswick Mall, inside the Thames Policy Area.
Conservation areas
Strand on the Green Conservation Area — Strand on the Green Conservation Area was designated on 7 November 1968 and extended in 2001. It covers the historic Thames-side terrace, the tideway and Oliver's Island.
Chiswick High Road Conservation Area — Chiswick High Road Conservation Area covers the commercial spine of Chiswick Major Centre. The appraisal was updated in January 2022.
Old Chiswick Conservation Area — Old Chiswick Conservation Area covers the historic riverside settlement around Chiswick Mall and St Nicholas Church, distinct from the High Road shops.
Chiswick House Conservation Area — Chiswick House Conservation Area covers the Palladian villa and its grounds, a registered park and a major heritage constraint on the north side of the centre.
Local authority and policy

In Chiswick, including around River Thames and Strand on the Green Conservation Area, the London Borough of Hounslow assesses flood risk under Policy EQ3 of the Local Plan, adopted on 15 September 2015, together with London Plan Policy SI 12, published on 2 March 2021. The borough is the Lead Local Flood Authority. Policy EQ3 also promotes buffer zones to watercourses and the opening up of river corridors. Confirm current maps, the SFRA and local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Hounslow Local Plan (adopted 15 September 2015) and The London Plan 2021 (published 2 March 2021) (The Hounslow Local Plan was adopted on 15 September 2015 and remains the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Hounslow is the local planning authority and the Lead Local Flood Authority.)

  • EQ3: Flood risk and surface water management

    Requires development proposals to prepare flood risk assessments consistent with Environment Agency and Strategic Flood Risk Assessment requirements, to apply the sequential approach within site boundaries, to incorporate necessary flood resistance and resilience measures, and to incorporate sustainable urban drainage systems and avoid non-permeable hard standings, with the aim of achieving greenfield runoff rates. The policy also uses the sequential and exception tests to avoid inappropriate development in flood risk areas, and promotes opening up river corridors and buffer zones to watercourses.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • GB4: The green infrastructure network

    Requires development proposals to make a positive contribution to the green infrastructure network and to incorporate on-site green infrastructure that integrates into the wider network, which may include green roofs, sustainable drainage, trees and pedestrian access routes. Proposals must demonstrate that there will be no significant adverse impact on the borough's green infrastructure. The supporting text identifies the River Crane, the Duke of Northumberland's River and the Crane Corridor as green links.

  • GB7: Biodiversity

    Requires development to be permitted only where significant adverse impact on biodiversity is avoided, mitigated, or as a last resort compensated. It protects designated international, national and local nature conservation areas, promotes qualitative enhancement including access, connectivity and new habitat, and encourages greening through landscaping and tree planting, including protection of existing trees through Tree Preservation Orders. Development proposals are expected to contribute to greening, including green roofs and walls, landscaping, tree planting and other measures such as bat and bird boxes, through ecological plans and strategies where major developments are proposed, thereby resulting in a gain for biodiversity.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Chiswick

Who is the local planning authority for a flood risk assessment in Chiswick?

London Borough of Hounslow. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a flood risk assessment likely in Chiswick?

When a planning application in Chiswick could affect trees, habitats, heritage, flood risk or existing buildings around River Thames and Strand on the Green Conservation Area. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Chiswick alongside the London Borough of Hounslow local plan.