Flood risk and drainage assessments in Croydon for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Croydon rules explained

Recommended For Croydon

  1. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

  2. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  3. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  4. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

Get your free quote from RGP

Tell RGP about your site in Croydon. It's free, and there's no obligation. Your request is for RGP only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Surface water flood risk in and around Croydon Town Centre is a frequent reason for a flood risk assessment in Croydon. The River Wandle rises around Wandle Park, to the west of North End, rather than running through the main shopping streets. The local planning authority, and the Lead Local Flood Authority, is the London Borough of Croydon. Policy DM25 of the Croydon Local Plan, adopted on 27 February 2018, requires development to reduce flood risk from all sources, to apply a sequential approach, and to provide sustainable drainage. The Local Validation List of May 2026 asks for a flood risk assessment for all applications, even outside mapped flood zones, because of the borough’s surface water risk. Policy SI12 of the London Plan, published on 2 March 2021, also forms part of the development plan.

Local planning authority: London Borough of Croydon

Croydon Town Hall and its clock tower on Katharine Street, seen in late-afternoon light
Photo: Paul Gillett, CC BY-SA 2.0

In Croydon

The Local Plan records Croydon as highly susceptible to surface water flooding, with significant episodes at Purley, Kenley, Coulsdon, Norbury and Thornton Heath, which are areas covered on these pages. In Croydon Town Centre and the Croydon Opportunity Area the typical concern is surface water or sewer flooding. Sites close to Wandle Park may also need to consider the River Wandle.

Local character
Croydon Town Centre
North End
Croydon Opportunity Area
Other
Wandle Park
Park Hill
Lloyd Park
Rivers
River Wandle
Flood zones
surface water flood risk
Local authority and policy

The London Borough of Croydon assesses flood risk and drainage under Policies SP6 and DM25 of the Croydon Local Plan, adopted on 27 February 2018, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. Policy DM25 requires sustainable drainage and a flood risk assessment in Flood Zones 2 and 3, for major development, and in Flood Zone 1 where other sources of flooding are identified. The Local Validation List of May 2026 requires a flood risk assessment for all applications. Confirm the current local validation requirements with the council before submitting.

Local plan: Croydon Local Plan 2018 (The Croydon Local Plan 2018 was adopted on 27 February 2018 and remains the adopted local plan. A later review has been published in draft, including a 2024 revised text, but that review is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • DM28: Trees

    Policy DM28 of the Croydon Local Plan, adopted on 27 February 2018, requires the Council to protect and enhance the borough’s woodlands, trees and hedgerows.

  • DM27: Protecting and enhancing our biodiversity

    Policy DM27 requires development to enhance biodiversity, to have no adverse impact on land with biodiversity or geo-diversity value, and to have no adverse impact on protected species or their habitats. It does not set a biodiversity net gain percentage above the national minimum.

  • SP7: Green Grid

    Policy SP7 protects the Green Grid, including the Wandle Valley Area Framework, and supports street tree planting, green roofs and ecological restoration.

  • DM25: Sustainable Drainage Systems and reducing flood risk

    Policy DM25 requires development to reduce flood risk from all sources, to apply the sequential and exception tests, and to provide sustainable drainage that achieves better than greenfield runoff rates where possible. A flood risk assessment is required for all development in Flood Zones 2 and 3 and for major development, and in Flood Zone 1 where other sources of flooding are identified.

  • SP6: Environment and Climate Change

    Policy SP6 sets the strategic approach to climate change, flood risk and environmental quality, and records that the Council is the Lead Local Flood Authority.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Croydon

Who is the Lead Local Flood Authority for Croydon?

The London Borough of Croydon. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.

Does the River Wandle run through the main shopping streets of Croydon Town Centre?

No. The River Wandle rises around Wandle Park, to the west of North End. Surface water flood risk is the more typical concern in Croydon Town Centre, and the Local Validation List of May 2026 asks for a flood risk assessment for all applications.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 deal with flood risk and sustainable drainage alongside Policies SP6 and DM25.