Featured partner
Recommended for Dorking

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Dorking

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Transport planning and infrastructure consultancy with its main office on North Street…
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…
In Dorking the River Mole and Pipp Brook meet around Pixham, and Surrey County Council's Section 19 report on winter 2013/14 records that some properties in the centre of the town flooded when the Mole could not take the extra flow from Pipp Brook. Vincent Lane was closed, and there was also flooding along the A24 towards Mickleham. A flood risk assessment and drainage strategy should show how a site will be kept safe and will not make flooding worse elsewhere. The local planning authority is Mole Valley District Council. Policy INF3 of the Local Plan, adopted on 15 October 2024, requires proposals to reflect flood risk to the development and to neighbouring land, including sustainable drainage. Groundwater flood potential is also noted around Pixham.
Local planning authority: Mole Valley District Council

Dorking's flood risk is concentrated in the valley floor. The River Mole runs east then north of the town through the Mole Gap; Pipp Brook joins it from the west, and Bent's Brook drains the south of the sub-area. On 24 December 2013 the Mole corridor received about 75 mm of rain against a 45 mm forecast, and the river rose at least one foot per hour. The Section 19 report says the Mole was at capacity and could not cope with additional flow from Pipp Brook, flooding properties in the centre of Dorking, with levels returning to normal about 12 hours after the peak. Environment Agency flood warnings were issued for the River Mole at Dorking and Mickleham, and also for Brockham and Pixham. Geologically the sub-area is chalk to the north, clay to the south and sandstone and mudstone in the centre, with groundwater flood potential where Pipp Brook meets the Mole. Vincent Lane was temporarily closed.
Mole Valley District Council applies Policy INF3 (Flood Risk) of the Local Plan 2020-2039. The policy requires development, in its location, design and layout, to reflect the nature of flood risk to the development and to adjacent land, and to incorporate sustainable drainage, having regard to the Strategic Flood Risk Assessment. National sequential and exception tests also apply. The council introduced Local Validation Requirements on 10 November 2025; applicants should consult the current list for when a site-specific flood risk assessment and a drainage strategy must be submitted. Surrey County Council is the Lead Local Flood Authority for surface water and ordinary watercourses; the Environment Agency is responsible for the River Mole as a main river.
Local plan: Mole Valley Local Plan 2020-2039 (Adopted on 15 October 2024. The plan looks ahead to 2039. Local Validation Requirements and Biodiversity Net Gain Requirements were introduced on 10 November 2025 for applications submitted on or after that date.)
INF3: Flood Risk
Requires development to reflect the nature of flood risk to the site and to neighbouring land, including flood risk assessment, sequential and exception tests where required, and sustainable drainage, having regard to the Strategic Flood Risk Assessment.
DS23: Pixham End, Southern Parcel, Dorking
Site allocation in Dorking that, among other requirements, asks for retention of mature trees, sustainable drainage for fluvial and groundwater flood risk, and mitigation for effects on the Mole Gap to Reigate Escarpment SAC, with particular regard to Bechstein's bat habitat.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Mole Valley District Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.
Policy INF3 requires flood risk and drainage to be addressed, and national policy requires a site-specific assessment in Flood Zones 2 and 3, on larger Flood Zone 1 sites, and where other sources of flooding (including groundwater at Pixham) are present. Check the Local Validation Requirements introduced on 10 November 2025.
The Section 19 report into winter 2013/14 describes flooding from the River Mole, including along the A24 towards Mickleham, central property flooding when Pipp Brook could not discharge, a closure of Vincent Lane, and groundwater flood potential around Pixham.
Surrey County Council, until 1 April 2027 when that role passes, with planning powers, to the new East Surrey unitary council. The Environment Agency remains responsible for the River Mole as a main river.