Flood risk and drainage assessments in Kensington for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Royal Borough of Kensington and Chelsea rules explained

Recommended For Kensington

  1. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  2. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  3. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

Get your free quote from Motion

Tell Motion about your site in Kensington. It's free, and there's no obligation. Your request is for Motion only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Kensington High Street sits well back from the Thames, so fluvial and tidal flood zones are more often an issue in the south of the borough than on the High Street itself, but surface water flood risk and Critical Drainage Areas still need a careful look on basement and backland schemes in the Kensington Palace Conservation Area, around Kensington Square and beside Kensington Gardens. The Royal Borough of Kensington and Chelsea requires a site-specific flood risk assessment for all basement development, for sites in Flood Zones 2 and 3, for sites over one hectare, and in Critical Drainage Areas in the circumstances set out in Policy GB11. Policy GB12 requires development to aim for greenfield run-off rates.

Local planning authority: Royal Borough of Kensington and Chelsea

The east front of Kensington Palace, a red-brick royal palace, with the statue of William III on the path in front
Photo: Anthony O'Neil, CC BY-SA 2.0

In Kensington

The High Street beside Kensington Gardens, the Kensington Palace Conservation Area and Kensington Square is not typically in a fluvial flood zone, but surface water flood risk, Critical Drainage Areas and basement schemes can still trigger a flood risk assessment.

Conservation areas
Kensington Palace Conservation Area
Landmarks
Kensington Gardens
Kensington Square
Flood zones
surface water flood risk
Local authority and policy

The Royal Borough of Kensington and Chelsea assesses flood risk and drainage under Policies GB11 and GB12 of the Local Plan 2024, adopted on 24 July 2024, read with London Plan Policies SI12 and SI13. Confirm the current local validation requirements with the council before submitting.

Local plan: Local Plan 2024 (The Local Plan 2024 was adopted on 24 July 2024 and is the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • GB16: Trees

    Policy GB16 of the Local Plan 2024, adopted on 24 July 2024, resists the loss of trees of amenity, historic or ecological value, except where a tree is dead, dying or dangerous, is demonstrated as causing significant damage to adjacent structures, or felling is for reasons of good arboricultural practice. It also resists development which results in the damage or loss of trees of townscape or amenity value, or which gives rise to a threat to their continued well-being. Trees must be adequately protected throughout the course of development, including identified root protection areas. Where practicable, any tree that is felled must be replaced with one of a suitable size, with safeguarding so that the new tree has the best possible opportunity of reaching maturity. New trees must be of a suitable species for the location and compatible with the surrounding landscape and townscape.

  • GB14: Green and Blue Infrastructure

    Policy GB14 requires development to contribute to the greening of the borough, enhance habitat to increase biodiversity, and protect or enhance nearby waterways. Major residential development must achieve an Urban Greening Factor score of 0.4 and major non-residential development a score of 0.3. Development proposals must protect biodiversity in and adjacent to Sites of Importance for Nature Conservation. A site-specific Ecological Impact Assessment is required for all major development. Relevant development, including major development, must achieve a minimum on-site biodiversity net gain of 10 per cent; where that is robustly shown not to be achievable on site, adequate mitigation should be provided on an alternative site or, as a last resort, through the biodiversity credit system. A Biodiversity Net Gain Strategy is required for development adjacent to the River Thames. The policy does not set a percentage above the statutory 10 per cent minimum.

  • GB11: Flood Risk

    Policy GB11 requires development to address and reduce flood risk and its impacts. Highly vulnerable development, including self-contained basement dwellings, will not be permitted in Flood Zone 3 and Critical Drainage Areas, and sleeping accommodation will not be permitted below ground floor level in Flood Zone 3. A site-specific flood risk assessment is required for all development in Flood Zones 2 and 3, all sites greater than one hectare, all basement development, and development in Critical Drainage Areas where there is a change to a more vulnerable use, an increase in habitable units, or sleeping accommodation below ground level. Development at risk from any source must incorporate suitable flood risk measures, including an allowance for climate change, assessment of a breach in the tidal defences, an emergency plan, and a suitable pumped device for basements connected to the sewer network. New development adjacent to the River Thames and Chelsea Creek must be set back by 16 metres from the Thames flood defence.

  • GB12: Sustainable Drainage

    Policy GB12 requires development to contribute towards a reduction in the rate and volume of surface water run-off into the combined sewer network through measures that promote multifunctional benefits. Development proposals must aim to achieve greenfield run-off rates. Householder applications must reduce the rate of runoff in a way that is proportionate to the scale of development and reflects site constraints. Only where it can be clearly demonstrated that an on-site reduction to greenfield rates is not possible should alternative approaches be considered.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Kensington

Who is the local planning authority for a flood risk assessment in Kensington?

The Royal Borough of Kensington and Chelsea. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

Who is the Lead Local Flood Authority for Kensington?

The Royal Borough of Kensington and Chelsea. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 are the London Plan flood risk and sustainable drainage policies.