Featured partner
Recommended for Peckham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Peckham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil and structural engineering practice with a London office in Lambeth.
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Transport planning and infrastructure consultancy with its main office on North Street…
Civil and structural engineering consultancy whose London office is in Sutton town centre.
Surface water flood risk in Peckham Town Centre is a frequent reason for a flood risk assessment in Peckham. The Thames tidal floodplain lies in the north of the borough, around Bankside, Borough and London Bridge, and does not run through Rye Lane. The local planning authority, and the Lead Local Flood Authority, is the London Borough of Southwark. Policy P68 of the Southwark Plan, adopted on 23 February 2022, requires development not to increase flood risk on or off site, and requires major development to reduce surface water run-off to greenfield rates through sustainable drainage. The Validation Requirements ask for a flood risk assessment in flood zones. Policy SI12 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Southwark

The Southwark Plan records that much of the borough is at risk of flooding from two main sources: tidal flooding of the Thames in the north, and surface water flooding in Critical Drainage Areas. In Peckham Town Centre, along Rye Lane and around Peckham Library and Peckham Rye, the more typical concern is surface water. Elephant and Castle and Canada Water raise different issues and may be tested later as second places.
The London Borough of Southwark assesses flood risk and drainage under Policy P68 of the Southwark Plan, adopted on 23 February 2022, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. The Southwark Plan 2022 Validation Requirements ask for a flood risk assessment in flood zones. Confirm the current local validation requirements with the council before submitting.
Local plan: Southwark Plan 2022 (The Southwark Plan 2019–2036 was adopted on 23 February 2022 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
P60: Biodiversity
Policy P60 requires development to contribute to net gains in biodiversity by enhancing and protecting SINCs, Local Nature Reserves, protected species and priority habitats. It does not set a percentage above the national minimum.
P61: Trees
Policy P61 of the Southwark Plan, adopted on 23 February 2022, requires significant existing trees to be retained and protected, including trees of high amenity value, trees in conservation areas, and veteran, ancient and notable trees, and requires retained trees to be protected during construction in line with BS5837.
P68: Reducing flood risk
Policy P68 requires development not to increase flood risk on or off site, sets finished floor levels in areas at risk of flooding, and requires major development to reduce surface water run-off to greenfield rates through sustainable drainage. Tidal flood risk from the Thames is identified in the north of the borough, not in Peckham Town Centre.
General guidance for flood risk and drainage assessment, not formal advice for your site.
The London Borough of Southwark. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.
No. The Southwark Plan locates the highest tidal flood risk in the north of the borough, including Bankside, Borough and London Bridge. Peckham Town Centre is inland; surface water flood risk is the more typical local concern, including around Rye Lane and Peckham Rye.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 deal with flood risk and sustainable drainage alongside Policy P68.