Featured partner
Recommended for Victoria

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Victoria

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Transport planning and infrastructure consultancy with its main office on North Street…
Civil and structural engineering practice with a London office in Lambeth.
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Civil and structural engineering consultancy whose London office is in Sutton town centre.
Victoria Street sits close to the River Thames, so tidal flood zones, the Rapid Inundation Zone and surface water flood risk all need a careful look, including around Westminster Cathedral and on basement schemes. Westminster City Council requires all developments to be safe for their lifetime from flooding, and a site-specific flood risk assessment is needed in Flood Zones 2 and 3, on sites of 1 hectare or more, and in Surface Water Flood Risk Hotspots. Basement dwellings and basement extensions are not acceptable in the Rapid Inundation Zone. New development must incorporate Sustainable Drainage Systems and should aim for greenfield run-off rates, and a 16 metre buffer should be kept around flood defences wherever possible.
Local planning authority: Westminster City Council

Sites along Victoria Street, around Westminster Cathedral and toward the River Thames may fall in Flood Zones 2 or 3, the Rapid Inundation Zone or a Surface Water Flood Risk Hotspot. Surface water flood risk and basement schemes need particular care.
Westminster City Council assesses flood risk and drainage under Policy 35 of the City Plan 2019–2040, adopted on 21 April 2021, read with London Plan Policies SI12 and SI13. Confirm the current local validation requirements with the council before submitting.
Local plan: City Plan 2019–2040 (Westminster's City Plan 2019–2040 was adopted on 21 April 2021 and is the adopted local plan. A later partial review is not treated as adopted. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
34: Green infrastructure
Policy 34 of the City Plan 2019–2040, adopted on 21 April 2021, protects and enhances Westminster's green infrastructure. Developments will, wherever possible, contribute to the greening of the city by incorporating trees, green walls, green roofs, rain gardens and other green features. Sites of Importance for Natural Conservation, priority habitats and other ecological features outside the SINC network will be protected. Developments should achieve biodiversity net gain, wherever feasible and appropriate, and should maximise opportunities to enhance existing habitats and create new habitats for priority species. The policy does not set a percentage above the statutory 10 per cent minimum. Trees of amenity, ecological and historic value, and those which contribute to the character and appearance of the townscape, will be protected. The planting of trees to optimise the city's canopy cover will be encouraged in new developments. Supporting text says the loss of such trees should be prevented, and that proposals for new trees should have regard to the Trees and the Public Realm SPD.
35: Flood risk
Policy 35 requires all developments to be safe for their lifetime from the risk of flooding, complying with the council's Strategic Flood Risk Assessment, Surface Water Management Plan, Local Flood Risk Management Strategy and the Mayor's Regional Flood Risk Appraisal. A site-specific flood risk assessment must be submitted for developments of 1 hectare or greater, all developments in Flood Zones 2 and 3, and all developments within a Surface Water Flood Risk Hotspot. Highly Vulnerable Uses will not be allowed in Flood Zone 3. Within the Rapid Inundation Zone, basement dwellings and basement extensions to existing dwellings will not be acceptable. An undeveloped buffer zone of 16 metres should be maintained around flood defence structures wherever possible. New development must incorporate Sustainable Drainage Systems, should aim to achieve greenfield run-off rates, and should demonstrate how all opportunities to minimise site run-off have been taken.
General guidance for flood risk and drainage assessment, not formal advice for your site.
The Westminster City Council. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The Westminster City Council. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 are the London Plan flood risk and sustainable drainage policies.
No other published town guides for this survey in the council area yet.