Preliminary ecological appraisals in Dartford for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Dartford Borough Council rules explained

Recommended For Dartford

  1. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  2. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  3. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Greengage Environmental

Tell Greengage Environmental about your site in Dartford. It's free, and there's no obligation. Your request is for Greengage Environmental only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A preliminary ecological appraisal in Dartford should start with the River Darent, the River Thames, the Dartford Town Centre Conservation Area and any likely effects on the North Kent Special Protection Areas. The local planning authority is Dartford Borough Council. Policy M14 of the Dartford Plan to 2037, adopted on 22 April 2024, resists harm to designated sites, priority habitats and priority species, and requires Habitats Regulations assessment for relevant residential development. The appraisal should also note any Metropolitan Green Belt edge that forms part of the site's ecological setting.

Local planning authority: Dartford Borough Council

Holy Trinity Church, Dartford, a flint and stone church with a square clock tower and large traceried windows, seen from the churchyard
Photo: Paul the Archivist, CC BY-SA 4.0

In Dartford

The River Darent runs through Central Dartford, and the River Thames and its tidal marshes bound the north of the borough. Metropolitan Green Belt wraps the southern edge. The appraisal should identify whether Habitats Regulations assessment, further species surveys or a biodiversity net gain metric are needed.

Conservation areas
Dartford Town Centre Conservation Area — Dartford Borough Council designates the Dartford Town Centre Conservation Area, which includes most of the town's historic commercial centre and High Street.
Rivers
River Darent — The River Darent runs through Central Dartford. Policy M4 requires development with a frontage along the Rivers Thames or Darent to explore improvements to the riparian landscape, biodiversity and access, and to keep sites safe from all types of flooding for the lifetime of the development.
River Thames — The River Thames and its tidal defences bound the north of the borough. Policy M4 requires development in the tidal flood defence raising zone not to constrain the Thames Estuary 2100 Plan, and to leave space for the future management and upgrading of defences.
Special Protection Areas
North Kent Special Protection Areas — Policy M14 requires all residential development within 6 km of the North Kent Special Protection Areas and Ramsar sites, and residential schemes of more than 15 dwellings between 6 km and 10 km, to be subject to Habitats Regulations screening and appropriate assessment, with mitigation through a tariff, suitable alternative greenspace, or equivalent provision.
Green Belt
Metropolitan Green Belt — Metropolitan Green Belt wraps the southern and western edges of Dartford, including land towards Wilmington, Bean and the A2.
Local authority and policy

Dartford Borough Council assesses effects on habitats and species under Policy M14 of the Dartford Plan 2024 to 2037, adopted on 22 April 2024, together with Policy M4 where a site has a riverside frontage. Confirm the current validation requirements with the council before submitting.

Local plan: The Dartford Plan 2024 to 2037 (Adopted on 22 April 2024 and still in force as of 13 November 2026.)

  • M14: Biodiversity and Landscape

    Resists development on sites designated for biodiversity unless it is clearly demonstrated that biodiversity value will not be adversely affected. All applicable developments must deliver at least 10 per cent biodiversity net gain, measured with Defra's latest metric, with habitats secured for at least 30 years. Residential development within 6 km of the North Kent Special Protection Areas and Ramsar sites, and larger schemes of more than 15 dwellings between 6 km and 10 km, is subject to Habitats Regulations assessment and mitigation. Existing trees, hedgerows and landscape features should be retained wherever possible, with native replacement where removal is justified.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Dartford

Who is the local planning authority for a preliminary ecological appraisal in Dartford?

Dartford Borough Council is the local planning authority.

When is a preliminary ecological appraisal likely in Dartford?

Policy M14 applies where habitats, protected species, designated sites or the North Kent Special Protection Areas could be affected. A PEA is the usual first step. Confirm the current validation requirements with the council.

Should a Dartford PEA cover both the River Darent and the North Kent Special Protection Areas?

Yes, where the site could affect the River Darent or River Thames corridors, or where residential development falls within the 6 km or 6-10 km zones of the North Kent Special Protection Areas under Policy M14. A PEA should record the habitats actually present and flag any Habitats Regulations work.