Featured partner
Recommended for Borehamwood

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Borehamwood

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Land and measured-building survey practice with a London office in Crystal Palace.
Land and building surveying company with offices in Surrey (Dunsfold Park), London,…
Surveying and construction consultancy with its head office at Merrow Business Park in…
Measured building and land surveyors trading from 111 Gosterwood Street in Deptford, in…
A topographical survey in Borehamwood should pick up levels and features in the Elstree Way Corridor, on the Metropolitan Green Belt edge, and around the Elstree Village Conservation Area. Accurate levels matter for surface water drainage and for layout. The local planning authority is Hertsmere Borough Council. Policy SADM14 of the SADM Policies Plan, adopted on 23 November 2016, depends on reliable site levels for flood risk assessment, and Policy SADM12 depends on an accurate tree and landscape plan of the site.
Local planning authority: Hertsmere Borough Council

The Elstree Way Corridor is a planned gateway where finished levels, access and drainage need to be shown clearly. Trees in the Elstree Village Conservation Area and on the Metropolitan Green Belt edge may also need to be surveyed where they constrain the layout. The survey should be coordinated with any flood risk assessment or tree survey.
Hertsmere Borough Council will expect drawings that rely on site levels, including flood risk assessments under Policy SADM14 of the SADM Policies Plan, adopted on 23 November 2016, and tree or landscape work under Policy SADM12. A topographical survey is often the evidence that ties those assessments together. Confirm the current validation requirements with the council before submitting.
Local plan: Hertsmere Local Plan 2012-2027 (Core Strategy, Site Allocations and Development Management Policies Plan, and Elstree Way Corridor Area Action Plan) (The Core Strategy was adopted on 16 January 2013, the Elstree Way Corridor Area Action Plan on 8 July 2015, and the Site Allocations and Development Management Policies Plan on 23 November 2016. These remain the adopted development plan as of 13 November 2026.)
CS12: The Enhancement of the Natural Environment
Requires all development proposals to conserve and enhance the natural environment of the borough, including biodiversity, habitats, protected trees, landscape character, and sites of ecological and geological value, and to provide opportunities for habitat creation and enhancement throughout the life of a development.
General guidance for topographical survey, not formal advice for your site.
Hertsmere Borough Council is the local planning authority.
A topographical survey is likely where flood risk, trees or a change in levels would affect the layout, including in the Elstree Way Corridor and around the Elstree Village Conservation Area. Confirm the current validation requirements with the council.
Yes, especially in the Elstree Way Corridor and on the Metropolitan Green Belt edge, where Policy SADM14 and Policy SADM15 depend on accurate levels for surface water and flood risk.