Topographical surveys in Camberley for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Surrey Heath Borough Council rules explained

Recommended For Camberley

  1. Technics Group

    Surveying and construction consultancy with its head office at Merrow Business Park in…

  2. Vertex Surveys

    Land surveying company based in Shere, in Guildford borough.

  3. Cadmap

    Land and building surveying company with offices in Surrey (Dunsfold Park), London,…

  4. GEOTEC Surveys

    Underground mapping and land surveying company with its registered office in Wormley and…

Get your free quote from Technics Group

Tell Technics Group about your site in Camberley. It's free, and there's no obligation. Your request is for Technics Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Surface-water routes such as Middleton Road and Robins Bow, and The Maultway, which the Section 19 report describes as the watershed between the Blackwater River catchment and the Mill Bourne, are why an accurate topographical survey matters in Camberley. The survey is a measured plan of a site, its buildings and visible features, and is the base drawing for design and for many planning application plans. The local planning authority is Surrey Heath Borough Council. Policy DM10 flood-risk assessments depend on ground levels and drainage. The sandy Camberley Formation that underlies most of the town can change how levels and infiltration are interpreted on site.

Local planning authority: Surrey Heath Borough Council

Camberley High Street in Surrey, looking along the town-centre shops
Photo: Steve Daniels, CC BY-SA 2.0

In Camberley

Camberley's landform is a gentle fall from The Maultway watershed toward the Blackwater River on the western edge. The Section 19 report into winter 2013/14 records internal flooding at Robins Bow, Middleton Road, The Maultway and part of London Road, with a mapped high-risk surface water route on Middleton Road. Most of the investigated sub-area is underlain by Camberley Formation sand. East of the town, Broadmoor to Bagshot Woods and Heaths and the Metropolitan Green Belt rise toward Chobham Common, so a measured survey can also support landscape and Green Belt arguments on the urban edge.

Rivers
Blackwater River — Western edge of Camberley, a tributary of the River Loddon. The Section 19 report (28 October 2015) places the Camberley sub-area in the Blackwater catchment. There are no main rivers in the investigated sub-area itself, but its western boundary is adjacent to the Blackwater. The Core Strategy notes the Blackwater as a historic source of flooding affecting western Camberley, Frimley, Frimley Green and Mytchett.
Flood zones
Robins Bow — One of the streets investigated in the Section 19 report after internal property flooding in winter 2013/14. A drainage channel to the south runs parallel with the railway toward the Blackwater River. Parts of Robins Bow are identified as vulnerable to low surface water flood risk. The nearest mapped low fluvial flood risk from the Blackwater is more than 750 m away.
Middleton Road — Identified in the Section 19 report, with parts of London Road, as lying on a surface water flow route with a high risk of surface water flooding (more frequent than a 1 in 30 annual chance). Internal property flooding was reported here in winter 2013/14.
The Maultway — The B3015, which the Section 19 report describes as running along the watershed between the Blackwater catchment and the Mill Bourne and Addlestone Bourne catchment. Flooding incident reports in winter 2013/14 included The Maultway. The surrounding ground includes River Terrace Deposits and Surrey Hill Gravel.
Local character
Camberley Formation — Sand geology that underlies most of the Camberley sub-area in the Section 19 report, with Windlesham Formation (sand, silt and clay) in the west. The sub-area has limited potential for groundwater flooding at the surface.
Special Protection Areas
Thames Basin Heaths SPA — European site designated for nightjar, woodlark and Dartford warbler. Policy CP14B does not permit net new residential development within 400 m and requires SANG and SAMM for net new homes within 5 km, in accordance with the Thames Basin Heaths SPA Avoidance Strategy SPD (March 2019). Much of Camberley lies in this zone of influence.
SSSIs
Broadmoor to Bagshot Woods and Heaths — One of the four extensive SSSIs in the borough, also a Thames Basin Heaths SPA component, lying immediately east and north-east of Camberley (Core Strategy para 2.9). Some edges of the town can fall inside the 400 m exclusion zone under Policy CP14B.
Special Areas of Conservation
Chobham Common — National Nature Reserve and part of the Thursley, Ash, Pirbright & Chobham Common SAC, also a Thames Basin Heaths SPA component, in the east of the borough. Policy CP14B protects the SAC as well as the SPA.
Green Belt
Metropolitan Green Belt — Covers the east of Surrey Heath Borough. Camberley's main built-up area is outside the Green Belt, but land toward Bagshot, Lightwater and Chobham is within it.
Local authority and policy

Surrey Heath Borough Council does not have a single named topographical survey policy, but measured plans and levels are part of showing compliance with Policy DM10 on flooding and, on the eastern edge, with Green Belt and SPA-adjacent landscape tests. The Local Validation List 2025 requires site levels in Flood Zones 2 or 3 and in other circumstances set out in the list. Applicants should provide plans that meet the national and local validation requirements for location and block plans, and should include sufficient level information where flood risk or surface-water flow paths are in issue. Confirm the current checklist with Surrey Heath Borough Council before submitting.

Local plan: Core Strategy and Development Management Policies Development Plan Document (2012), extant saved policies of the Local Plan 2000, and the Camberley Town Centre Area Action Plan (Adopted. The Core Strategy and Development Management Policies DPD was adopted on 1 February 2012 and covers the period 2011 to 2028. It remains the statutory development plan, together with saved Local Plan 2000 policies and the Camberley Town Centre Area Action Plan, until replaced.)

  • CP14A: Biodiversity and Nature Conservation

    Seeks to conserve and enhance biodiversity in Surrey Heath. Development that results in harm to or loss of features of interest for biodiversity will not be permitted. Particular regard is had to SPAs and SACs, SSSIs, and local sites including ancient woodland. Outside those areas, new development will where appropriate be required to contribute to the protection, management and enhancement of biodiversity.

  • CP13: Green Infrastructure

    Seeks a network of accessible and integrated green infrastructure. Schemes that enhance existing green infrastructure, increase provision or improve connectivity are encouraged. Development that results in the loss, fragmentation or isolation of green infrastructure will be resisted. Strategic green infrastructure includes European sites and SANGs.

  • DM9: Design Principles

    Among other design tests, development is acceptable where it protects trees and other vegetation worthy of retention and provides high quality hard and soft landscaping where appropriate.

  • CP14B: European Sites

    Development is permitted only where it will not give rise to a likely significant adverse effect on the integrity of the Thames Basin Heaths SPA and/or the Thursley, Ash, Pirbright & Chobham Common SAC. No net new residential development is permitted within 400 m of the SPA. All net new residential development within 5 km must provide or contribute to SANG (at least 8 ha per 1,000 new occupants) and contribute to SAMM, in accordance with the adopted Avoidance Strategy. Developments of 10 or more net new dwellings are only permitted within identified SANG catchment areas.

  • DM10: Development and Flood Risk

    Takes a sequential approach to flood risk. Development in Flood Zones 2 and 3, on sites of 1 ha or greater in Zone 1, and on sites at medium or high risk from other sources of flooding identified in the SFRA, will not be supported unless the sequential and exception tests are passed where relevant, a site-specific flood risk assessment shows the proposal would reduce risk or at least be risk-neutral, and any identified risks can be reduced to acceptable levels through design and mitigation. Development is expected to reduce the volume and rate of surface water run-off through appropriately designed SuDS.

What you’ll usually need

General guidance for topographical survey, not formal advice for your site.

Timing and seasons
Not seasonal; dense summer vegetation can slow fieldwork.
Standards
RICS Measured surveys of land, buildings and utilities

Questions about topographical surveys in Camberley

Who is the local planning authority for a topographical survey in Camberley?

Surrey Heath Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.

When is a topographical survey useful for a Camberley application?

Whenever levels, drainage or existing buildings affect the design, especially near Middleton Road, Robins Bow, The Maultway or the Blackwater River, and on the eastern edge toward the Metropolitan Green Belt. It is also the usual base for a flood risk assessment under Policy DM10.

Does Surrey Heath Borough Council have a specific topographical survey policy?

No single policy is named for it. The survey supports other tests in the local plan, especially DM10 (flooding). Use the current Local Validation List 2025 for plan and site-level standards.