Topographical surveys in Woking for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Woking Borough Council rules explained

Recommended For Woking

  1. Technics Group

    Surveying and construction consultancy with its head office at Merrow Business Park in…

  2. Vertex Surveys

    Land surveying company based in Shere, in Guildford borough.

  3. Cadmap

    Land and building surveying company with offices in Surrey (Dunsfold Park), London,…

  4. GEOTEC Surveys

    Underground mapping and land surveying company with its registered office in Wormley and…

Get your free quote from GEOTEC Surveys

Tell GEOTEC Surveys about your site in Woking. It's free, and there's no obligation. Your request is for GEOTEC Surveys only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Ground levels along the Hoe Stream and the River Wey, and the setting of the Basingstoke Canal, are why an accurate topographical survey matters in Woking. The survey is a measured plan of a site, its buildings and visible features, and is the base drawing for design and for many planning application plans. The local planning authority is Woking Borough Council. Flood-risk assessments under Policy CS9 depend on those levels, and Policy DM4 considers the setting of the canal. In the Metropolitan Green Belt, a clear survey also helps to show the effect of a proposal on openness. The sandy Bagshot Formation recorded in the south-west of the borough can change how levels and drainage are interpreted on site.

Local planning authority: Woking Borough Council

Woking town centre in Surrey, with the civic offices and the Ambassadors theatre
Photo: Alan Hunt, CC BY-SA 2.0

In Woking

Woking's landform is relatively gentle, but small changes in level are important. The Hoe Stream and the River Wey occupy shallow valleys on the south and east sides of the town, including the flood-prone streets around Blackhorse Road and Byfleet investigated after the winter of 2013/14. The Basingstoke Canal is a constructed waterway with towpath and embankment levels that need to be recorded where development sits beside it. Outside the urban area, the Metropolitan Green Belt covers much of the remaining land, and a measured survey is often the starting point for arguing that a proposal does, or does not, preserve openness.

Rivers
Hoe Stream — Tributary of the River Wey flowing through south Woking. Surrey County Council's Section 19 report on winter 2013/14 describes the Hoe Stream event as a 1 in 5 to 1 in 15 annual chance event and records flooding around Blackhorse Road, Smarts Heath Road and Woking (South).
River Wey — Main river on the eastern side of the borough. The Section 19 report records serious flooding in Byfleet on 25–26 December 2013, described as the worst there since 2000, and flooding in Old Woking.
Flood zones
Blackhorse Road — Rural road south-west of Woking town centre investigated in the Section 19 report; culverts and ditches here discharge towards the Hoe Stream, and the road was closed during the winter 2013/14 flooding.
Byfleet — Settlement on the River Wey in the east of the borough. Properties flooded from the Wey on 25–26 December 2013, the worst flooding there since 2000 according to the Section 19 report.
Special Protection Areas
Thames Basin Heaths SPA — European site designated for nightjar, woodlark and Dartford warbler. Policy CS8 applies a 400 m exclusion zone for net new residential development and a 5 km zone of influence requiring SANG and SAMM contributions.
SSSIs
Horsell Common — One of the three Thames Basin Heaths SPA component sites in or partly in Woking Borough, north of the town (Policy CS8).
Sheets Heath — SPA component site at Brookwood, named in Policy CS8 as one of the three designated sites in or partly in the borough.
Brookwood Heath — SPA component site in or partly in Woking Borough, named alongside Horsell Common and Sheets Heath in Policy CS8.
Special Areas of Conservation
Thursley, Ash, Pirbright and Chobham SAC — Special Area of Conservation adjoining the west of the borough, listed with the SPA in Policy CS7 as an internationally designated site to be protected.
Other
Basingstoke Canal — Historic canal and green/blue infrastructure corridor through the borough, subject to Policy DM4 (development in the vicinity of the Basingstoke Canal) and identified as a GI asset in the Development Management Policies DPD.
Green Belt
Metropolitan Green Belt — Covers much of the land outside Woking's urban area (Core Strategy Policy CS6).
Local character
Bagshot Formation — Sandy geology recorded along Blackhorse Road in the Section 19 report, with a noted potential for groundwater flooding at the surface in that sub-area.
Local authority and policy

Woking Borough Council does not have a single named “topographical survey” policy, but measured plans and levels are part of showing compliance with Policy CS9 on flooding, Policy DM4 on the Basingstoke Canal, Policy CS6 on the Metropolitan Green Belt, and the design policies CS21 and CS24. Applicants should provide plans that meet the national and local validation requirements for location and block plans, and should include sufficient level information where flood risk, canal setting or Green Belt openness is in issue. Confirm the current validation checklist with Woking Borough Council before submitting.

Local plan: Woking Core Strategy (2012), Development Management Policies DPD (2016) and Site Allocations Plan (2021) (Adopted. The Core Strategy was adopted on 25 October 2012 and reviewed in 2018 and on 12 October 2023. The Development Management Policies DPD was adopted on 20 October 2016 and reviewed in October 2021. The Site Allocations Plan was adopted on 14 October 2021.)

  • CS6: Green Belt

    Protects the Metropolitan Green Belt around Woking's urban area and sets the tests for inappropriate development.

  • CS7: Biodiversity and nature conservation

    Protects internationally, nationally and locally designated sites, including the Thames Basin Heaths SPA and the Thursley, Ash, Pirbright and Chobham SAC, and requires development to contribute to biodiversity.

  • CS8: Thames Basin Heaths Special Protection Areas

    Gives priority protection to the SPA. No net new residential development is permitted within 400 m. Development between 400 m and 5 km must contribute to SANG and SAMM. Three component sites in or partly in the borough are Horsell Common, Sheets Heath (Brookwood) and Brookwood Heath.

  • CS9: Flooding and water management

    Expects development in Flood Zone 1. Flood Zone 2 is considered only if there is no suitable alternative at lower risk. Development in Flood Zones 3a and 3b requires a comprehensive flood risk assessment and must not increase flood risk elsewhere. Permission is refused where proposals would adversely affect an SPA, SAC or Ramsar site.

  • CS21: Design

    Requires proposals to incorporate landscaping, including the retention of trees of amenity value and other features.

  • DM2: Trees and landscaping

    Supports removal of TPO or conservation-area trees only in exceptional circumstances with over-riding planning benefits and replacement planting. Requires retained trees to be protected during construction and given adequate space, and new landscape schemes to enhance character and connect to green infrastructure.

  • DM4: Development in the vicinity of Basingstoke Canal

    Sets additional design and amenity tests for development near the Basingstoke Canal, which is also identified as a green and blue infrastructure asset.

What you’ll usually need

General guidance for topographical survey, not formal advice for your site.

Timing and seasons
Not seasonal; dense summer vegetation can slow fieldwork.
Standards
RICS Measured surveys of land, buildings and utilities

Questions about topographical surveys in Woking

Who is the local planning authority for a topographical survey in Woking?

Woking Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.

When is a topographical survey useful for a Woking application?

Whenever levels, watercourses or existing buildings affect the design, especially near the Hoe Stream, the River Wey, the Basingstoke Canal, or in the Metropolitan Green Belt. It is also the usual base for a flood risk assessment under Policy CS9.

Does Woking Borough Council have a specific topographical survey policy?

No single policy is named for it. The survey supports other tests in the local plan, including CS9 (flooding), DM4 (Basingstoke Canal) and CS6 (Green Belt). Use the current local validation requirements for plan standards.