Featured partner
Recommended for Woking

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Woking

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Surveying and construction consultancy with its head office at Merrow Business Park in…
Land surveying company based in Shere, in Guildford borough.
Land and building surveying company with offices in Surrey (Dunsfold Park), London,…
Underground mapping and land surveying company with its registered office in Wormley and…
Ground levels along the Hoe Stream and the River Wey, and the setting of the Basingstoke Canal, are why an accurate topographical survey matters in Woking. The survey is a measured plan of a site, its buildings and visible features, and is the base drawing for design and for many planning application plans. The local planning authority is Woking Borough Council. Flood-risk assessments under Policy CS9 depend on those levels, and Policy DM4 considers the setting of the canal. In the Metropolitan Green Belt, a clear survey also helps to show the effect of a proposal on openness. The sandy Bagshot Formation recorded in the south-west of the borough can change how levels and drainage are interpreted on site.
Local planning authority: Woking Borough Council

Woking's landform is relatively gentle, but small changes in level are important. The Hoe Stream and the River Wey occupy shallow valleys on the south and east sides of the town, including the flood-prone streets around Blackhorse Road and Byfleet investigated after the winter of 2013/14. The Basingstoke Canal is a constructed waterway with towpath and embankment levels that need to be recorded where development sits beside it. Outside the urban area, the Metropolitan Green Belt covers much of the remaining land, and a measured survey is often the starting point for arguing that a proposal does, or does not, preserve openness.
Woking Borough Council does not have a single named “topographical survey” policy, but measured plans and levels are part of showing compliance with Policy CS9 on flooding, Policy DM4 on the Basingstoke Canal, Policy CS6 on the Metropolitan Green Belt, and the design policies CS21 and CS24. Applicants should provide plans that meet the national and local validation requirements for location and block plans, and should include sufficient level information where flood risk, canal setting or Green Belt openness is in issue. Confirm the current validation checklist with Woking Borough Council before submitting.
Local plan: Woking Core Strategy (2012), Development Management Policies DPD (2016) and Site Allocations Plan (2021) (Adopted. The Core Strategy was adopted on 25 October 2012 and reviewed in 2018 and on 12 October 2023. The Development Management Policies DPD was adopted on 20 October 2016 and reviewed in October 2021. The Site Allocations Plan was adopted on 14 October 2021.)
CS6: Green Belt
Protects the Metropolitan Green Belt around Woking's urban area and sets the tests for inappropriate development.
CS7: Biodiversity and nature conservation
Protects internationally, nationally and locally designated sites, including the Thames Basin Heaths SPA and the Thursley, Ash, Pirbright and Chobham SAC, and requires development to contribute to biodiversity.
CS8: Thames Basin Heaths Special Protection Areas
Gives priority protection to the SPA. No net new residential development is permitted within 400 m. Development between 400 m and 5 km must contribute to SANG and SAMM. Three component sites in or partly in the borough are Horsell Common, Sheets Heath (Brookwood) and Brookwood Heath.
CS9: Flooding and water management
Expects development in Flood Zone 1. Flood Zone 2 is considered only if there is no suitable alternative at lower risk. Development in Flood Zones 3a and 3b requires a comprehensive flood risk assessment and must not increase flood risk elsewhere. Permission is refused where proposals would adversely affect an SPA, SAC or Ramsar site.
CS21: Design
Requires proposals to incorporate landscaping, including the retention of trees of amenity value and other features.
DM2: Trees and landscaping
Supports removal of TPO or conservation-area trees only in exceptional circumstances with over-riding planning benefits and replacement planting. Requires retained trees to be protected during construction and given adequate space, and new landscape schemes to enhance character and connect to green infrastructure.
DM4: Development in the vicinity of Basingstoke Canal
Sets additional design and amenity tests for development near the Basingstoke Canal, which is also identified as a green and blue infrastructure asset.
General guidance for topographical survey, not formal advice for your site.
Woking Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
Whenever levels, watercourses or existing buildings affect the design, especially near the Hoe Stream, the River Wey, the Basingstoke Canal, or in the Metropolitan Green Belt. It is also the usual base for a flood risk assessment under Policy CS9.
No single policy is named for it. The survey supports other tests in the local plan, including CS9 (flooding), DM4 (Basingstoke Canal) and CS6 (Green Belt). Use the current local validation requirements for plan standards.
No other published town guides for this survey in the council area yet.