Featured partner
Recommended for Kensington

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Kensington

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.
Arboricultural and ecological consultancy trading as Tim Moya Associates from 2 The…
Independent arboricultural consultancy based in Radlett, just north of the London…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Mature trees along the edge of Kensington Gardens, in the Kensington Palace Conservation Area, and around Kensington Square give this major centre much of its leafy High Street character. The Royal Borough of Kensington and Chelsea resists the loss of trees of amenity, historic or ecological value and requires trees to be adequately protected, including their root protection areas, throughout construction. A BS 5837 tree survey shows the council what is being kept, how work on tight plots south of the Gardens will stay clear of roots, and how any justified removal will be replaced with a tree of a suitable size and species. Surface water flood risk is another reason to show trees and soft landscape on an accurate plan, because Policy GB14 also prioritises tree planting in green infrastructure.
Local planning authority: Royal Borough of Kensington and Chelsea

Tree cover in the Kensington Palace Conservation Area, along Kensington Gardens and around Kensington Square is part of the High Street's character. Surface water flood risk should be considered alongside any tree and landscape scheme.
The Royal Borough of Kensington and Chelsea assesses tree issues under Policy GB16 of the Local Plan 2024, adopted on 24 July 2024, read with Policy GB14 on green infrastructure and the London Plan tree policies. Confirm the current local validation requirements with the council before submitting.
Local plan: Local Plan 2024 (The Local Plan 2024 was adopted on 24 July 2024 and is the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
GB16: Trees
Policy GB16 of the Local Plan 2024, adopted on 24 July 2024, resists the loss of trees of amenity, historic or ecological value, except where a tree is dead, dying or dangerous, is demonstrated as causing significant damage to adjacent structures, or felling is for reasons of good arboricultural practice. It also resists development which results in the damage or loss of trees of townscape or amenity value, or which gives rise to a threat to their continued well-being. Trees must be adequately protected throughout the course of development, including identified root protection areas. Where practicable, any tree that is felled must be replaced with one of a suitable size, with safeguarding so that the new tree has the best possible opportunity of reaching maturity. New trees must be of a suitable species for the location and compatible with the surrounding landscape and townscape.
GB14: Green and Blue Infrastructure
Policy GB14 requires development to contribute to the greening of the borough, enhance habitat to increase biodiversity, and protect or enhance nearby waterways. Major residential development must achieve an Urban Greening Factor score of 0.4 and major non-residential development a score of 0.3. Development proposals must protect biodiversity in and adjacent to Sites of Importance for Nature Conservation. A site-specific Ecological Impact Assessment is required for all major development. Relevant development, including major development, must achieve a minimum on-site biodiversity net gain of 10 per cent; where that is robustly shown not to be achievable on site, adequate mitigation should be provided on an alternative site or, as a last resort, through the biodiversity credit system. A Biodiversity Net Gain Strategy is required for development adjacent to the River Thames. The policy does not set a percentage above the statutory 10 per cent minimum.
GB11: Flood Risk
Policy GB11 requires development to address and reduce flood risk and its impacts. Highly vulnerable development, including self-contained basement dwellings, will not be permitted in Flood Zone 3 and Critical Drainage Areas, and sleeping accommodation will not be permitted below ground floor level in Flood Zone 3. A site-specific flood risk assessment is required for all development in Flood Zones 2 and 3, all sites greater than one hectare, all basement development, and development in Critical Drainage Areas where there is a change to a more vulnerable use, an increase in habitable units, or sleeping accommodation below ground level. Development at risk from any source must incorporate suitable flood risk measures, including an allowance for climate change, assessment of a breach in the tidal defences, an emergency plan, and a suitable pumped device for basements connected to the sewer network. New development adjacent to the River Thames and Chelsea Creek must be set back by 16 metres from the Thames flood defence.
GB12: Sustainable Drainage
Policy GB12 requires development to contribute towards a reduction in the rate and volume of surface water run-off into the combined sewer network through measures that promote multifunctional benefits. Development proposals must aim to achieve greenfield run-off rates. Householder applications must reduce the rate of runoff in a way that is proportionate to the scale of development and reflects site constraints. Only where it can be clearly demonstrated that an on-site reduction to greenfield rates is not possible should alternative approaches be considered.
General guidance for tree survey (bs5837), not formal advice for your site.
The Royal Borough of Kensington and Chelsea. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
A tree survey is expected where trees of amenity, historic or ecological value could be affected, including in the Kensington Palace Conservation Area, along Kensington Gardens and around Kensington Square. Confirm the current local validation requirements with the council before submitting.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 on trees and woodlands is the London Plan policy most often read alongside a tree survey.