Featured partner
Recommended for Guildford

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Guildford

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…
Ecological consultancy owned by Surrey Wildlife Trust, based at the Trust's offices in…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
Along the River Wey corridor, around Riverside Nature Reserve and near the Thames Basin Heaths SPA, a biodiversity net gain assessment in Guildford still has to measure habitats with the statutory metric, but the percentage required is no longer the original 20% in Policy P7. The local planning authority is Guildford Borough Council. Policy P7 of the Local Plan: Development Management Policies (2023) remains the local biodiversity policy. Following the National Planning Policy Framework published on 17 August 2026, the statutory 10% minimum now applies except where a higher figure is justified on a specific site allocation. Since 6 August 2026, sites of 0.2 hectares or less are exempt unless they affect priority habitat. Habitat mapped in the Surrey Local Nature Recovery Strategy still scores higher in the metric, which matters for heathland and wetland gains in those corridors.
Local planning authority: Guildford Borough Council

Guildford's habitat mix runs from heathland on Whitmoor Common and the other Thames Basin Heaths SPA commons in the north, through the wet meadows of Wey Valley Meadows and the River Wey floodplain, to chalk downland on The Mount and in the Surrey Hills to the south. That range matters for BNG, because the metric rewards like-for-like or better habitats and gives extra weight to locations mapped in the Surrey Local Nature Recovery Strategy, adopted in March 2026. Sites beside the Wey Navigation also fall under Policy P10, which asks for a 10-metre undeveloped buffer from main rivers, so riverside schemes often have both a buffer and a net-gain plan to design together.
Guildford Borough Council applies Policy P7 of the Local Plan: Development Management Policies (2023). The adopted policy text sought a biodiversity net gain of at least 20% (or the national minimum if higher) for qualifying development, measured with the national metric and secured for at least 30 years. Following paragraph N1.2 of the National Planning Policy Framework published on 17 August 2026, the statutory 10% minimum now applies except where a higher figure is justified on a specific site allocation. P7 still asks even exempt schemes to seek maximum on-site gain and to include wildlife features on buildings. Strategic significance in the metric is now set by the Surrey Local Nature Recovery Strategy. National exemptions, including the 0.2-hectare exemption from 6 August 2026, still apply.
Local plan: Guildford Borough Local Plan: Strategy and Sites (2019) and Development Management Policies (2023) (Adopted. A new-style Guildford Local Plan is being prepared (timetable published 5 June 2026; planned adoption 30 April 2029) and will replace both parts.)
P1: Surrey Hills Area of Outstanding Natural Beauty and Area of Great Landscape Value
Conserves and enhances the AONB, presumes against major development there, and protects its setting; the AGLV is kept until the AONB boundary review ends.
D1: Place shaping
Overarching design and place-making policy (not specific to surveys).
D13: The Corridor of The River Wey & Godalming Navigations
Development affecting the Navigations must conserve their character, setting, ecology and heritage and integrate flood mitigation sensitively.
D12: Light Impacts and Dark Skies
Lighting schemes need a Light Impact Assessment covering wildlife; light spill into habitats and buffers must be avoided; extra protection in darker parts of the Surrey Hills.
D20: Conservation Areas
Development in conservation areas must preserve or enhance their character (title verified; detailed wording not re-read for this pack).
ID4: Green and blue infrastructure
Protects SPAs/SACs, SSSIs, SNCIs and Local Nature Reserves; seeks biodiversity gains, especially in Biodiversity Opportunity Areas; protects watercourse corridors.
P10: Water Quality, Waterbodies and Riparian Corridors
No deterioration of waterbodies; an undeveloped buffer of at least 10m from the top of bank on both sides of a main river, with a Landscape and Ecological Management Plan; no new culverting.
P11: Sustainable Surface Water Management
Greenfield run-off rates for greenfield sites; as close as practicable on brownfield; maximise permeable surfaces; follow the SuDS hierarchy and Surrey LLFA guidance; infiltration needs 1m clearance above groundwater.
P2: Green Belt
Inappropriate development in the Metropolitan Green Belt is refused unless very special circumstances exist; defines how extensions and replacement buildings are judged.
P4: Flooding, flood risk and groundwater protection zones
Development in medium/high flood risk areas needs a site-specific FRA, sequential/exception tests and safe access; undeveloped flood zone 3b is safeguarded; all schemes must show no increase in run-off and prioritise SuDS; protects Source Protection Zones.
P5: Thames Basin Heaths Special Protection Area
No net new homes within 400m of the SPA; new homes within 400m–5km must provide SANG and SAMM; schemes of 50+ homes at 5–7km assessed case by case.
P6: Protecting Important Habitats and Species
Protects irreplaceable and priority habitats and species; where ancient woodland is in or next to a site, a BS5837 survey locating ancient/veteran trees and a buffer of at least 15m are required.
P7: Biodiversity in New Developments
The adopted policy text sought at least 20% biodiversity net gain using the national metric, with gains secured for 30+ years, maximum on-site gain and features for wildlife on buildings. Following the National Planning Policy Framework published on 17 August 2026 the statutory 10% minimum applies except where a higher figure is justified on a specific site allocation.
General guidance for biodiversity net gain (bng), not formal advice for your site.
Policy P7 of the 2023 Development Management Policies sought at least 20% for qualifying development. Following the National Planning Policy Framework published on 17 August 2026, the statutory 10% minimum applies except where a higher figure is justified on a specific site allocation. Check the current validation requirements before you submit.
Applications made on or after 6 August 2026 are exempt if the red-line site is 0.2 hectares or less and no on-site priority habitat is harmed. Householder applications remain exempt.
Habitat created or enhanced where the LNRS Local Habitat Map proposes a matching measure qualifies for high strategic significance, which increases its unit value. Guildford adopted this approach after the LNRS was published in March 2026.
The national minimum information: the pre-development biodiversity value, the completed metric, a habitat plan and details of any irreplaceable habitat. After approval, a biodiversity gain plan must be approved before work starts.
Yes. P7 allows off-site gains, or a financial contribution where on-site and off-site delivery are not possible. Since 6 August 2026, non-exempt minor sites may go straight to off-site gains.