Flood risk and drainage assessments in Barking for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Barking and Dagenham rules explained

Recommended For Barking

  1. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  2. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  3. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

Get your free quote from JMS Engineers

Tell JMS Engineers about your site in Barking. It's free, and there's no obligation. Your request is for JMS Engineers only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

The River Roding and Barking Creek run close to Abbey Green and Barking Town Centre, so flood risk and drainage, including surface water flood risk, are a frequent issue for development in Barking. The local planning authority and Lead Local Flood Authority is the London Borough of Barking and Dagenham. Policy DMSI 6 of the Barking and Dagenham Local Plan 2020–2037, adopted on 18 September 2024, addresses flood risk and defences, and Policy DMSI 7 addresses water management. The FULL Planning Application Validation Checklist of February 2026 requires a flood risk assessment for development of one hectare or greater in Flood Zone 1 and for all development in Flood Zones 2 and 3. The Thames lies at the south of the borough, rather than through the Broadway. Policy SI12 of the London Plan, published on 2 March 2021, also forms part of the development plan.

Local planning authority: London Borough of Barking and Dagenham

Barking Town Hall, a red-brick civic building with a tall tower, seen from the square
Photo: Adrian Cable, CC BY-SA 2.0

In Barking

A flood risk assessment around Barking Town Centre should consider the River Roding, Barking Creek and surface water flood risk, together with the setting of Abbey Green and Barking Abbey. Tidal issues become more important further south towards the Thames and Barking Riverside, which is a future district and is not seeded as a separate place here.

Local character
Barking Town Centre
Landmarks
Barking Abbey
Other
Abbey Green
Rivers
River Roding
Barking Creek
Flood zones
surface water flood risk
Local authority and policy

The London Borough of Barking and Dagenham, as local planning authority and Lead Local Flood Authority, assesses flood risk under Policy DMSI 6 and water management under Policy DMSI 7 of the Barking and Dagenham Local Plan 2020–2037, adopted on 18 September 2024, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. The February 2026 FULL validation checklist requires a flood risk assessment for development of one hectare or greater in Flood Zone 1 and for all development in Flood Zones 2 and 3. Confirm the current local validation requirements with the council before submitting.

Local plan: Barking and Dagenham Local Plan 2020–2037 (The Barking and Dagenham Local Plan 2020–2037 was adopted on 18 September 2024 and is the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • DMNE 5: Trees

    Policy DMNE 5 of the Barking and Dagenham Local Plan 2020–2037, adopted on 18 September 2024, sets out how development should protect and manage trees.

  • DMNE 2: Urban greening

    Policy DMNE 2 requires development to demonstrate a minimum of 10 per cent biodiversity net gain. That restates the statutory minimum and does not set a higher local percentage. It also addresses urban greening.

  • DMNE 3: Nature conservation and biodiversity

    Policy DMNE 3 protects nature conservation and biodiversity, including designated sites and habitats.

  • SP6: Green and blue infrastructure

    Policy SP6 sets the strategic approach to green and blue infrastructure in the borough.

  • DMSI 6: Flood risk and defences

    Policy DMSI 6 requires development to manage flood risk and to take account of flood defences.

  • DMSI 7: Water management

    Policy DMSI 7 addresses water management, including sustainable drainage.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Barking

Who is the local planning authority for a flood risk assessment in Barking?

The London Borough of Barking and Dagenham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

Who is the Lead Local Flood Authority for Barking?

The London Borough of Barking and Dagenham. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 address flood risk management and sustainable drainage.