Flood risk and drainage assessments in Dartford for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Dartford Borough Council rules explained

Recommended For Dartford

  1. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  2. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  3. Unda

    Flood risk and drainage consultancy based in Crawley, working across England and Wales.

  4. Floodline Consulting

    Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…

Get your free quote from JMS Engineers

Tell JMS Engineers about your site in Dartford. It's free, and there's no obligation. Your request is for JMS Engineers only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Dartford sits on the River Darent, with further tidal risk from the River Thames and its flood defences, so a flood risk assessment should start with those rivers rather than with inland catchments alone. The local planning authority is Dartford Borough Council, and Kent County Council is the Lead Local Flood Authority. Policy M4 of the Dartford Plan to 2037, adopted on 22 April 2024, permits development only where the site is safe from all types of flooding for its lifetime, including climate change, and where development does not materially displace flood water or worsen risk elsewhere.

Local planning authority: Dartford Borough Council

Holy Trinity Church, Dartford, a flint and stone church with a square clock tower and large traceried windows, seen from the churchyard
Photo: Paul the Archivist, CC BY-SA 4.0

In Dartford

Policy M4 also requires the sequential and exception tests, a safe means of access and egress, and multifunctional SuDS on all major development. Development in the tidal flood defence raising zone must not constrain the Thames Estuary 2100 Plan. Sites in the Dartford Town Centre Conservation Area still need a site-specific assessment, with levels tied to a topographical survey. Metropolitan Green Belt land on the edge of town may also lie in ordinary-watercourse catchments.

Conservation areas
Dartford Town Centre Conservation Area — Dartford Borough Council designates the Dartford Town Centre Conservation Area, which includes most of the town's historic commercial centre and High Street.
Rivers
River Darent — The River Darent runs through Central Dartford. Policy M4 requires development with a frontage along the Rivers Thames or Darent to explore improvements to the riparian landscape, biodiversity and access, and to keep sites safe from all types of flooding for the lifetime of the development.
River Thames — The River Thames and its tidal defences bound the north of the borough. Policy M4 requires development in the tidal flood defence raising zone not to constrain the Thames Estuary 2100 Plan, and to leave space for the future management and upgrading of defences.
Special Protection Areas
North Kent Special Protection Areas — Policy M14 requires all residential development within 6 km of the North Kent Special Protection Areas and Ramsar sites, and residential schemes of more than 15 dwellings between 6 km and 10 km, to be subject to Habitats Regulations screening and appropriate assessment, with mitigation through a tariff, suitable alternative greenspace, or equivalent provision.
Green Belt
Metropolitan Green Belt — Metropolitan Green Belt wraps the southern and western edges of Dartford, including land towards Wilmington, Bean and the A2.
Local authority and policy

Dartford Borough Council assesses flood risk under Policy M4 of the Dartford Plan 2024 to 2037, adopted on 22 April 2024. Development must be safe for its lifetime, must not worsen risk elsewhere, and must satisfy the sequential test, with the exception test where national policy requires it. Kent County Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council before submitting.

Local plan: The Dartford Plan 2024 to 2037 (Adopted on 22 April 2024 and still in force as of 13 November 2026.)

  • M4: Flood Risk and Riverside Design

    Requires development on the Rivers Thames or Darent frontage to explore improvements to the riparian landscape, biodiversity and access, alongside any flood defence needs. Permission is only granted where the site is safe from all types of flooding for the lifetime of the development, including climate change, and where development does not materially displace flood water or worsen risk elsewhere. The sequential and exception tests apply, and all major development must incorporate multifunctional SuDS. Development in the tidal flood defence raising zone must not constrain the Thames Estuary 2100 Plan.

  • M14: Biodiversity and Landscape

    Resists development on sites designated for biodiversity unless it is clearly demonstrated that biodiversity value will not be adversely affected. All applicable developments must deliver at least 10 per cent biodiversity net gain, measured with Defra's latest metric, with habitats secured for at least 30 years. Residential development within 6 km of the North Kent Special Protection Areas and Ramsar sites, and larger schemes of more than 15 dwellings between 6 km and 10 km, is subject to Habitats Regulations assessment and mitigation. Existing trees, hedgerows and landscape features should be retained wherever possible, with native replacement where removal is justified.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Dartford

Who is the local planning authority for a flood risk assessment in Dartford?

Dartford Borough Council is the local planning authority.

When is a flood risk assessment likely in Dartford?

Policy M4 applies where a site is at risk from the River Darent, the River Thames, surface water, tidal defences or other sources, or could increase risk elsewhere. Confirm the current validation requirements with the council.

Why do both the River Darent and the River Thames matter for a flood risk assessment in Dartford?

The River Darent runs through Central Dartford, and the River Thames and its tidal defences bound the north of the borough. Policy M4 deals with both, including the Thames Estuary 2100 Plan in the tidal defence raising zone, and requires a site-specific assessment of all sources of flooding.