Preliminary ecological appraisals in Camden Town for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Camden rules explained

Recommended For Camden Town

  1. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  2. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  3. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Thomson Environmental Consultants

Tell Thomson Environmental Consultants about your site in Camden Town. It's free, and there's no obligation. Your request is for Thomson Environmental Consultants only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Canal-side buildings around Camden Lock, towpath habitat along the Regent's Canal, and older fabric and residual gardens behind Camden High Street can support bats, nesting birds and other protected or priority species. The London Borough of Camden will not grant permission for development that would harm designated nature conservation sites or adversely affect priority habitats and species, and it expects an ecology scoping survey on all major sites unless it has agreed otherwise. A preliminary ecological appraisal is the usual first survey to identify habitats and whether further seasonal surveys are needed. Surface water flood risk and the canal edge should be noted in the walkover so that later drainage design does not undo enhancement measures.

Local planning authority: London Borough of Camden

The paired chambers of Camden Lock on the Regent's Canal, with the lock gates, towpaths and surrounding buildings
Photo: Myrabella, CC BY-SA 3.0

In Camden Town

A preliminary ecological appraisal is often warranted on sites along Camden High Street, around Camden Lock and beside the Regent's Canal. Surface water flood risk and canal-side habitat should be recorded in the walkover.

Local character
Camden High Street
Landmarks
Camden Lock
Rivers
Regent's Canal
Flood zones
surface water flood risk
Local authority and policy

The London Borough of Camden assesses ecology under Policy A3 of the Camden Local Plan, adopted on 3 July 2017. Confirm the current local validation requirements with the council before submitting.

Local plan: Camden Local Plan (The Camden Local Plan was adopted on 3 July 2017 and remains the adopted local plan. A later review may be in examination and is not treated as adopted. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • A3: Biodiversity

    Policy A3 of the Camden Local Plan, adopted on 3 July 2017, protects and enhances sites of nature conservation and biodiversity. The council will designate and protect nature conservation sites and safeguard protected and priority habitats and species, and will not grant permission for development that would directly or indirectly result in the loss or harm of a designated nature conservation site or adversely affect the status or population of priority habitats and species. Other features with nature conservation value, including gardens, should be protected wherever possible. The policy also protects trees and vegetation of significant amenity, historic, cultural or ecological value, requires trees and vegetation to be retained to be protected during demolition and construction in line with BS 5837:2012, and expects replacement planting where loss has been justified and additional trees and vegetation wherever possible. An ecology scoping survey is expected on all major sites unless the council has specifically agreed it is not. The policy seeks a net gain in biodiversity but does not set a percentage above the statutory 10 per cent minimum.

  • CC3: Water and flooding

    Policy CC3 requires development not to increase flood risk and to reduce the risk of flooding where possible. Development must incorporate water efficiency measures, avoid harm to the water environment, consider the impact of development in areas at risk of flooding including drainage, incorporate flood resilient measures in areas prone to flooding, use Sustainable Drainage Systems in line with the drainage hierarchy to achieve a greenfield run-off rate where feasible, and not locate vulnerable development in flood-prone areas. Where an assessment of flood risk is required, developments should consider surface water flooding in detail and groundwater flooding where applicable. Supporting text identifies surface water as the key flood risk in Camden, including Local Flood Risk Zones and previously flooded streets, with a smaller risk of groundwater flooding in parts of the borough.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Camden Town

Who is the local planning authority for a preliminary ecological appraisal in Camden Town?

The London Borough of Camden. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a preliminary ecological appraisal needed in Camden Town?

An ecology scoping survey is expected on all major sites unless the council has agreed it is not, and is also likely where a smaller site could affect habitats or protected species, including around Camden Lock and the Regent's Canal. Confirm the current local validation requirements with the council before submitting.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G6 is the London Plan policy most often read alongside a preliminary ecological appraisal.